{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2022,4,3]],"date-time":"2022-04-03T00:53:16Z","timestamp":1648947196242},"reference-count":27,"publisher":"Elsevier BV","issue":"1","license":[{"start":{"date-parts":[[1999,3,1]],"date-time":"1999-03-01T00:00:00Z","timestamp":920246400000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Simulation Practice and Theory"],"published-print":{"date-parts":[[1999,3]]},"DOI":"10.1016\/s0928-4869(98)00021-4","type":"journal-article","created":{"date-parts":[[2003,4,5]],"date-time":"2003-04-05T03:41:35Z","timestamp":1049514095000},"page":"31-46","source":"Crossref","is-referenced-by-count":1,"title":["A simulation study of sequencing heuristics in a cellular flexible assembly system with hybrid order shipment environments"],"prefix":"10.1016","volume":"7","author":[{"given":"Bor-Yuh","family":"Leu","sequence":"first","affiliation":[]},{"given":"Fu-Kwun","family":"Wang","sequence":"additional","affiliation":[]}],"member":"78","reference":[{"key":"10.1016\/S0928-4869(98)00021-4_BIB1","doi-asserted-by":"crossref","first-page":"403","DOI":"10.1007\/BF02023778","article-title":"Real-time production scheduling of an automated cardline","volume":"3","author":"Akella","year":"1985","journal-title":"Annals of Operations Research"},{"issue":"6","key":"10.1016\/S0928-4869(98)00021-4_BIB2","doi-asserted-by":"crossref","first-page":"340","DOI":"10.1080\/09511929408944622","article-title":"Scheduling and control of flexible manufacturing systems: a critical review","volume":"7","author":"Basnet","year":"1994","journal-title":"International Journal of Computer Integrated Manufacturing"},{"issue":"1","key":"10.1016\/S0928-4869(98)00021-4_BIB3","doi-asserted-by":"crossref","first-page":"91","DOI":"10.1080\/00207549008942686","article-title":"Manufacturing systems with forbidden early shipment: implications for choice of scheduling rules","volume":"28","author":"Christy","year":"1990","journal-title":"International Journal of Production Research"},{"key":"10.1016\/S0928-4869(98)00021-4_BIB4","unstructured":"R.W. Conway, W.L. Maxwell, L.W. Miller, Theory of Scheduling, Addison Wesley, Reading, MA, USA, 1967"},{"issue":"1","key":"10.1016\/S0928-4869(98)00021-4_BIB5","doi-asserted-by":"crossref","first-page":"4","DOI":"10.1080\/07408178808966144","article-title":"Selection of a set of part delivery dates in a multi-job stochastic assembly system","volume":"20","author":"Das","year":"1988","journal-title":"IIE Transactions"},{"key":"10.1016\/S0928-4869(98)00021-4_BIB6","doi-asserted-by":"crossref","first-page":"379","DOI":"10.1016\/0736-5845(88)90008-7","article-title":"Cell production system for assembly","volume":"4","author":"Hara","year":"1988","journal-title":"Robotics and Computer-Integrated Manufacturing"},{"key":"10.1016\/S0928-4869(98)00021-4_BIB7","unstructured":"Y.-C. Ho, A heuristic sequence pattern and network based flow analysis for flexible assembly systems, MS Thesis, Purdue University, 1991"},{"issue":"3","key":"10.1016\/S0928-4869(98)00021-4_BIB8","doi-asserted-by":"crossref","first-page":"163","DOI":"10.1080\/09511929408944606","article-title":"A heuristic operation sequence-pattern identification method and its applications in the design of a cellular flexible assembly system","volume":"7","author":"Ho","year":"1994","journal-title":"International Journal of Computer Integrated Manufacturing"},{"key":"10.1016\/S0928-4869(98)00021-4_BIB9","doi-asserted-by":"crossref","first-page":"51","DOI":"10.1007\/BF00713159","article-title":"Analytical performance models for closed-loop flexible assembly systems","volume":"1","author":"Kamath","year":"1988","journal-title":"International Journal of Flexible Manufacturing Systems"},{"issue":"1","key":"10.1016\/S0928-4869(98)00021-4_BIB10","doi-asserted-by":"crossref","first-page":"41","DOI":"10.1080\/00207548408942428","article-title":"Manufacturing systems with forbidden early order departure","volume":"22","author":"Kanet","year":"1984","journal-title":"International Journal of Production Research"},{"issue":"5","key":"10.1016\/S0928-4869(98)00021-4_BIB11","doi-asserted-by":"crossref","first-page":"783","DOI":"10.1080\/00207548908942587","article-title":"Manufacturing systems with forbidden early shipments: implications for setting manufacturing lead times","volume":"27","author":"Kanet","year":"1989","journal-title":"International Journal of Production Research"},{"issue":"5","key":"10.1016\/S0928-4869(98)00021-4_BIB12","doi-asserted-by":"crossref","first-page":"1027","DOI":"10.1080\/00207549408956986","article-title":"A due date-based approach to part type selection in flexible manufacturing systems","volume":"32","author":"Kim","year":"1994","journal-title":"International Journal of Production Research"},{"key":"10.1016\/S0928-4869(98)00021-4_BIB13","unstructured":"A.M. Law, W.D. Kelton, Simulation Modeling and Analysis, McGraw-Hill, New York, USA, 1991"},{"key":"10.1016\/S0928-4869(98)00021-4_BIB14","unstructured":"B.-Y. Leu, An investigation of group scheduling heuristics in a flow shop cellular system with workcenter sharing for the forbidden early shipment environment, Ph.D. Dissertation, Oklahoma State University, 1994"},{"issue":"2","key":"10.1016\/S0928-4869(98)00021-4_BIB15","doi-asserted-by":"crossref","first-page":"106","DOI":"10.1177\/003754979606600207","article-title":"Simulation analysis of scheduling heuristics in a flow-line manufacturing cell with two types of order shipment environments","volume":"66","author":"Leu","year":"1996","journal-title":"SIMULATION"},{"issue":"9","key":"10.1016\/S0928-4869(98)00021-4_BIB16","doi-asserted-by":"crossref","first-page":"143","DOI":"10.1108\/01443579510099715","article-title":"Comparative analysis of group scheduling heuristics in a flow shop cellular system","volume":"15","author":"Leu","year":"1995","journal-title":"International Journal of Operations and Production Management"},{"key":"10.1016\/S0928-4869(98)00021-4_BIB17","doi-asserted-by":"crossref","first-page":"61","DOI":"10.1111\/j.1540-5915.1992.tb00377.x","article-title":"Dynamic group scheduling heuristics in a flow-through cell environment","volume":"23","author":"Mahmoodi","year":"1992","journal-title":"Decision Sciences"},{"key":"10.1016\/S0928-4869(98)00021-4_BIB18","unstructured":"J.P. Moily, J.P. Stinson, Effects of processing time variability and routing flexibility on group technology implementation in flow-shop, in: Proceedings of Annual Meeting of the Decision Sciences Institute, New Orleans, LA, USA, 1989, pp. 898\u2013901"},{"issue":"4","key":"10.1016\/S0928-4869(98)00021-4_BIB19","doi-asserted-by":"crossref","first-page":"785","DOI":"10.1080\/00207549008942754","article-title":"Analysis of scheduling rules for an FMS","volume":"28","author":"Montazeri","year":"1990","journal-title":"International Journal of Production Research"},{"issue":"2","key":"10.1016\/S0928-4869(98)00021-4_BIB20","first-page":"131","article-title":"SCHED-STAR a price-based shop scheduling module","volume":"1","author":"Morton","year":"1988","journal-title":"Journal of Manufacturing and Operations Management"},{"key":"10.1016\/S0928-4869(98)00021-4_BIB21","unstructured":"M.L. Pinedo, B. Wolf, S.T. McCormick, Sequencing in a flexible assembly line with blocking to minimize cycle time, in: Proceedings of the Second ORSA\/TIMS Conference on FMSs: Operations Research Models and Applications, 1986, pp. 499\u2013508"},{"key":"10.1016\/S0928-4869(98)00021-4_BIB22","unstructured":"A.A.B. Pritsker, Introduction to Simulation and SLAM II, Wiley, New York, USA, 1995"},{"issue":"1","key":"10.1016\/S0928-4869(98)00021-4_BIB23","doi-asserted-by":"crossref","first-page":"2","DOI":"10.1080\/09537289408919468","article-title":"Classification and review of FMS scheduling procedures","volume":"5","author":"Rachamadugu","year":"1994","journal-title":"Production Planning and Control"},{"key":"10.1016\/S0928-4869(98)00021-4_BIB24","doi-asserted-by":"crossref","unstructured":"R. Radharamanan, A heuristic algorithm for group scheduling, in: Proceedings of the 1986 IIE Engineering Conference, Dallas, TX, USA, 1986, pp. 229\u2013236","DOI":"10.1016\/0360-8352(86)90079-3"},{"key":"10.1016\/S0928-4869(98)00021-4_BIB25","unstructured":"U. Wemmerlov, Part family scheduling on a single machine, in: Proceedings of Annual Meeting of the Decision Sciences Institute, New Orleans, LA, USA, 1989, pp. 197\u2013199"},{"key":"10.1016\/S0928-4869(98)00021-4_BIB26","doi-asserted-by":"crossref","first-page":"401","DOI":"10.1147\/rd.294.0401","article-title":"Scheduling algorithms for flexible flow lines","volume":"29","author":"Wittrock","year":"1985","journal-title":"IBM Journal of Research and Development"},{"issue":"1","key":"10.1016\/S0928-4869(98)00021-4_BIB27","doi-asserted-by":"crossref","first-page":"54","DOI":"10.1016\/0278-6125(91)90047-6","article-title":"Design and scheduling of flexible assembly systems for large products: a simulation study","volume":"10","author":"Yano","year":"1991","journal-title":"Journal of Manufacturing Systems"}],"container-title":["Simulation Practice and Theory"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0928486998000214?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0928486998000214?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2019,4,17]],"date-time":"2019-04-17T02:23:33Z","timestamp":1555467813000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S0928486998000214"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[1999,3]]},"references-count":27,"journal-issue":{"issue":"1","published-print":{"date-parts":[[1999,3]]}},"alternative-id":["S0928486998000214"],"URL":"https:\/\/doi.org\/10.1016\/s0928-4869(98)00021-4","relation":{},"ISSN":["0928-4869"],"issn-type":[{"value":"0928-4869","type":"print"}],"subject":[],"published":{"date-parts":[[1999,3]]}}}