{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2023,8,18]],"date-time":"2023-08-18T05:18:23Z","timestamp":1692335903414},"reference-count":15,"publisher":"Elsevier BV","issue":"6","license":[{"start":{"date-parts":[[2000,1,1]],"date-time":"2000-01-01T00:00:00Z","timestamp":946684800000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["European Journal of Control"],"published-print":{"date-parts":[[2000,1]]},"DOI":"10.1016\/s0947-3580(00)71113-7","type":"journal-article","created":{"date-parts":[[2013,6,13]],"date-time":"2013-06-13T13:50:55Z","timestamp":1371131455000},"page":"511-520","source":"Crossref","is-referenced-by-count":7,"title":["Solving Transient Scheduling Problems with Constraint Programming"],"prefix":"10.1016","volume":"6","author":[{"given":"Ouajdi","family":"Korbaa","sequence":"first","affiliation":[]},{"given":"Pascal","family":"Yim","sequence":"additional","affiliation":[]},{"given":"Jean-Claude","family":"Gentina","sequence":"additional","affiliation":[]}],"member":"78","reference":[{"key":"10.1016\/S0947-3580(00)71113-7_bib0005","first-page":"1139","article-title":"Hoist scheduling problem: an approach based on constraints logic programming, IEEE international conference on robotics and automation","volume":"2","author":"Baptiste","year":"1992","journal-title":"Nice"},{"key":"10.1016\/S0947-3580(00)71113-7_bib0010","first-page":"62","article-title":"Timed Petri net schedules, Advances in Petri nets","author":"Carlier","year":"1988"},{"key":"10.1016\/S0947-3580(00)71113-7_bib0015","doi-asserted-by":"crossref","unstructured":"Dubois D, Stecke KE. Using Petri nets to represent production processes, Proceedings of 22nd Conference on Decision and Control, San Antonio, Texas, USA 1983; pp 1062\u20131067.","DOI":"10.1109\/CDC.1983.269683"},{"key":"10.1016\/S0947-3580(00)71113-7_bib0020","series-title":"Periodic loading of Flexible Manufacturing Systems, IFIP Congress","author":"Erschler","year":"1982"},{"issue":"4\u20135","key":"10.1016\/S0947-3580(00)71113-7_bib0025","first-page":"379","article-title":"Programmation logique avec contraintes et ordonnancement","volume":"29","author":"Esquirol","year":"1995","journal-title":"(APII)"},{"issue":"1","key":"10.1016\/S0947-3580(00)71113-7_bib0030","doi-asserted-by":"crossref","first-page":"3","DOI":"10.1109\/9.8644","article-title":"Performance evaluation of jobshop systems using timed event-graphs","volume":"34","author":"Hillion","year":"1989","journal-title":"IEEE Trans on Automatic Control"},{"key":"10.1016\/S0947-3580(00)71113-7_bib0035","series-title":"Constrained resolution: a complete method for higher order logic, PhD thesis","author":"Huet","year":"1972"},{"key":"10.1016\/S0947-3580(00)71113-7_bib0040","unstructured":"Korbaa O, Camus H, Gentina Jc. FMS cyclic scheduling with overlapping production cycles, Second International Workshop on Manufacturing and Petri Nets, 18th ICATPN, Toulouse, France 1997; pp 35\u201353."},{"key":"10.1016\/S0947-3580(00)71113-7_bib0045","unstructured":"Korbaa O, Camus H, Gentina Jc. Transient state study for cyclic schedules: bounds and optimization, IEEE International Symposium on Assembly and Task Planning, Marina del Rey, California, USA 1997; pp 198\u2013193."},{"key":"10.1016\/S0947-3580(00)71113-7_bib0050","series-title":"workshop on project management on scheduling","article-title":"A Constraint Logic Programming approach for N-periodic hoist scheduling problem, 3rd inter","author":"Lacoste","year":"1992"},{"issue":"2","key":"10.1016\/S0947-3580(00)71113-7_bib0055","doi-asserted-by":"crossref","first-page":"161","DOI":"10.1051\/ro\/1991250201611","article-title":"Resolution d\u2019un probleme d\u2019ordonnancement cyclique it iterations independantes et contraintes de ressources","volume":"25","author":"Munier","year":"1991","journal-title":"R.A.I.R.O., Operation Research"},{"key":"10.1016\/S0947-3580(00)71113-7_bib0060","doi-asserted-by":"crossref","unstructured":"Murata T. Petri nets: properties, analysis and applications, Proceedings of the IEEE, 1989; 77(4): 541\u2013580.","DOI":"10.1109\/5.24143"},{"key":"10.1016\/S0947-3580(00)71113-7_bib0065","unstructured":"Richard P, Jacquet N, Cavalier C, Proust C. Solving scheduling problems using Petri nets and constraint logic programming, ETFA 95, Symposium on emerging technologies and factory automation, INRIA\/IEEE, 10-13\/10\/1995, 1995: I: 59\u201368."},{"issue":"2","key":"10.1016\/S0947-3580(00)71113-7_bib0070","first-page":"125","article-title":"Solving scheduling problems using Petri nets and constraint logic programming","volume":"32","author":"Richard","year":"1998","journal-title":"Recherche Operationnelle (Operations Research)"},{"key":"10.1016\/S0947-3580(00)71113-7_bib0075","unstructured":"Valentin C. Modeling and Analysis Methods for a Class of Hybrid Dynamic Systems, Proceedings of ADPM \u201994, Brussels, Belgium 1994; pp 221\u2013226."}],"container-title":["European Journal of Control"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0947358000711137?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0947358000711137?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2018,10,15]],"date-time":"2018-10-15T09:27:55Z","timestamp":1539595675000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S0947358000711137"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2000,1]]},"references-count":15,"journal-issue":{"issue":"6","published-print":{"date-parts":[[2000,1]]}},"alternative-id":["S0947358000711137"],"URL":"https:\/\/doi.org\/10.1016\/s0947-3580(00)71113-7","relation":{},"ISSN":["0947-3580"],"issn-type":[{"value":"0947-3580","type":"print"}],"subject":[],"published":{"date-parts":[[2000,1]]}}}