{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,7,24]],"date-time":"2026-07-24T03:50:17Z","timestamp":1784865017855,"version":"3.55.0"},"reference-count":19,"publisher":"Elsevier BV","issue":"2","license":[{"start":{"date-parts":[[2001,5,1]],"date-time":"2001-05-01T00:00:00Z","timestamp":988675200000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Reliability Engineering &amp; System Safety"],"published-print":{"date-parts":[[2001,5]]},"DOI":"10.1016\/s0951-8320(00)00108-3","type":"journal-article","created":{"date-parts":[[2002,7,25]],"date-time":"2002-07-25T05:15:59Z","timestamp":1027574159000},"page":"193-212","source":"Crossref","is-referenced-by-count":217,"title":["A new importance measure for risk-informed decision making"],"prefix":"10.1016","volume":"72","author":[{"given":"E.","family":"Borgonovo","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"G.E.","family":"Apostolakis","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"78","reference":[{"key":"10.1016\/S0951-8320(00)00108-3_BIB1","unstructured":"ACRS. Report dated 12 October 1999, from D.A. Powers, Chairman, ACRS, to R.A. Meserve, Chairman, US Nuclear Regulatory Commission, Subject: Importance Measures Derived from Probabilistic Risk Assessment. Washington, DC, 1999."},{"key":"10.1016\/S0951-8320(00)00108-3_BIB2","unstructured":"ACRS. Report dated 11 February 2000, from D.A. Powers, Chairman, ACRS, to G.J. Dicus, Chairman, US Nuclear Regulatory Commission, Subject: Proposed Plans for Developing Risk-Informed Revisions to 10 CFR Part 50, \u201cDomestic Licensing of Production and Utilization Facilities. Washington, DC, 2000."},{"key":"10.1016\/S0951-8320(00)00108-3_BIB3","doi-asserted-by":"crossref","first-page":"5","DOI":"10.13182\/NT80-A17065","article-title":"The unavailability of systems under periodic test and maintenance","volume":"50","author":"Apostolakis","year":"1980","journal-title":"Nucl Technol"},{"key":"10.1016\/S0951-8320(00)00108-3_BIB4","doi-asserted-by":"crossref","first-page":"135","DOI":"10.1016\/0143-8174(81)90019-6","article-title":"Pitfalls in risk calculations","volume":"2","author":"Apostolakis","year":"1981","journal-title":"Reliab Engng"},{"key":"10.1016\/S0951-8320(00)00108-3_BIB5","unstructured":"Apostolakis GE. A commentary on model uncertainty, proceedings of the workshop on model uncertainty: its characterization and quantification, Annapolis, MD, 20\u201322 October 1993. In: Mosleh A, Siu N, Smidts C, Lui C, editors. Center for Reliability Engineering, University of Maryland, College Park, Maryland, 1995."},{"key":"10.1016\/S0951-8320(00)00108-3_BIB6","series-title":"Mathematical analysis","author":"Binmore","year":"1982"},{"key":"10.1016\/S0951-8320(00)00108-3_BIB7","series-title":"A second course in mathematical analysis","author":"Burkill","year":"1970"},{"key":"10.1016\/S0951-8320(00)00108-3_BIB8","series-title":"Sensitivity analysis","article-title":"Reliability algorithms: FORM and SORM methods","author":"Cawfield","year":"2000"},{"key":"10.1016\/S0951-8320(00)00108-3_BIB9","doi-asserted-by":"crossref","first-page":"213","DOI":"10.1016\/S0951-8320(97)00144-0","article-title":"Use of importance measures in risk-informed regulatory applications","volume":"60","author":"Cheok","year":"1998","journal-title":"Reliab Engng Syst Safety"},{"key":"10.1016\/S0951-8320(00)00108-3_BIB10","unstructured":"Fleming KN. Developing useful insights and avoiding misleading conclusions from risk importance measures in PSA applications, Proceeding PSA \u201896, Park City, Utah, 29 September\u20133 October 1996, American Nuclear Society, La Grange Park, IL, 1996."},{"key":"10.1016\/S0951-8320(00)00108-3_BIB11","series-title":"Evaluating derivatives: principles and techniques of algorithmic differentiation","author":"Griewank","year":"1999"},{"key":"10.1016\/S0951-8320(00)00108-3_BIB12","doi-asserted-by":"crossref","first-page":"327","DOI":"10.1016\/0951-8320(93)90097-I","article-title":"Uncertainty and sensitivity analysis techniques for use in performance assessment for radioactive waste disposal","volume":"42","author":"Helton","year":"1993","journal-title":"Reliab Engng Syst Safety"},{"key":"10.1016\/S0951-8320(00)00108-3_BIB13","doi-asserted-by":"crossref","first-page":"21","DOI":"10.1111\/j.1539-6924.1987.tb00966.x","article-title":"A matrix-based approach to uncertainty and sensitivity analysis for fault trees","volume":"7","author":"Iman","year":"1987","journal-title":"Risk Anal"},{"key":"10.1016\/S0951-8320(00)00108-3_BIB14","doi-asserted-by":"crossref","first-page":"71","DOI":"10.1111\/j.1539-6924.1988.tb01155.x","article-title":"An investigation of uncertainty and sensitivity analysis techniques for computer models","volume":"8","author":"Iman","year":"1988","journal-title":"Risk Anal"},{"key":"10.1016\/S0951-8320(00)00108-3_BIB15","doi-asserted-by":"crossref","first-page":"3789","DOI":"10.1029\/1998JD100042","article-title":"Sensitivity analysis: could better methods be used?","volume":"104","author":"Saltelli","year":"1999","journal-title":"J Geophys Res"},{"key":"10.1016\/S0951-8320(00)00108-3_BIB16","series-title":"Sensitivity analysis","article-title":"Local methods","author":"Turanyi","year":"2000"},{"key":"10.1016\/S0951-8320(00)00108-3_BIB17","doi-asserted-by":"crossref","first-page":"433","DOI":"10.1111\/j.1539-6924.1998.tb00358.x","article-title":"Applying risk models to the formulation of safety cases","volume":"18","author":"Youngblood","year":"1998","journal-title":"Risk Anal"},{"key":"10.1016\/S0951-8320(00)00108-3_BIB18","doi-asserted-by":"crossref","first-page":"261","DOI":"10.1016\/S0951-8320(99)00011-3","article-title":"International survey on PSA figures of merit","volume":"66","author":"Vasseur","year":"1999","journal-title":"Reliab Engng Syst Safety"},{"key":"10.1016\/S0951-8320(00)00108-3_BIB19","doi-asserted-by":"crossref","first-page":"423","DOI":"10.1111\/j.1539-6924.1998.tb00356.x","article-title":"Reservations on ASME risk-based in-service inspection and testing: an outlook to the future","volume":"18","author":"Vesely","year":"1998","journal-title":"Risk Anal"}],"container-title":["Reliability Engineering &amp; System Safety"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0951832000001083?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0951832000001083?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2019,5,4]],"date-time":"2019-05-04T06:25:59Z","timestamp":1556951159000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S0951832000001083"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2001,5]]},"references-count":19,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2001,5]]}},"alternative-id":["S0951832000001083"],"URL":"https:\/\/doi.org\/10.1016\/s0951-8320(00)00108-3","relation":{},"ISSN":["0951-8320"],"issn-type":[{"value":"0951-8320","type":"print"}],"subject":[],"published":{"date-parts":[[2001,5]]}}}