{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,25]],"date-time":"2026-04-25T10:53:39Z","timestamp":1777114419890,"version":"3.51.4"},"reference-count":15,"publisher":"Elsevier BV","issue":"2","license":[{"start":{"date-parts":[[1999,4,1]],"date-time":"1999-04-01T00:00:00Z","timestamp":922924800000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Artificial Intelligence in Engineering"],"published-print":{"date-parts":[[1999,4]]},"DOI":"10.1016\/s0954-1810(98)00018-1","type":"journal-article","created":{"date-parts":[[2002,7,26]],"date-time":"2002-07-26T04:24:09Z","timestamp":1027657449000},"page":"189-197","source":"Crossref","is-referenced-by-count":122,"title":["Artificial neural networks as applied to long-term demand forecasting"],"prefix":"10.1016","volume":"13","author":[{"given":"Tawfiq","family":"Al-Saba","sequence":"first","affiliation":[]},{"given":"Ibrahim","family":"El-Amin","sequence":"additional","affiliation":[]}],"member":"78","reference":[{"key":"10.1016\/S0954-1810(98)00018-1_BIB1","series-title":"Demand Forecasting for Electric Utilities","author":"Gellings","year":"1992"},{"key":"10.1016\/S0954-1810(98)00018-1_BIB2","series-title":"The Modern Forecaster, The Modern Forecasting Process through Data Analysis","author":"Levenach","year":"1984"},{"key":"10.1016\/S0954-1810(98)00018-1_BIB3","series-title":"Short term Forecasting: An Introduction to the Box-Jenkins approach","author":"O\u2019Donovan","year":"1983"},{"key":"10.1016\/S0954-1810(98)00018-1_BIB4","doi-asserted-by":"crossref","first-page":"397","DOI":"10.1109\/59.486124","article-title":"Heterogeneous artificial neural netwok for short term load forecasting","volume":"11","author":"Piras","year":"1996","journal-title":"Ieee Transaction on Power Systems"},{"issue":"8","key":"10.1016\/S0954-1810(98)00018-1_BIB5","doi-asserted-by":"crossref","first-page":"771","DOI":"10.1080\/00908319708908889","article-title":"Electric load forecasting using artificial neural networks and deficit management","volume":"19","author":"Majundar","year":"1997","journal-title":"Energy sources"},{"key":"10.1016\/S0954-1810(98)00018-1_BIB6","doi-asserted-by":"crossref","first-page":"870","DOI":"10.1109\/59.496168","article-title":"An artificial neural network hourly temperature forecaster with applications in lead forecasting","volume":"11","author":"Khotanzad","year":"1996","journal-title":"Ieee Transaction on Power System"},{"key":"10.1016\/S0954-1810(98)00018-1_BIB7","doi-asserted-by":"crossref","first-page":"858","DOI":"10.1109\/59.496166","article-title":"A neural network short term load fore casting model for the green power systems","volume":"11","author":"Babirtris","year":"1996","journal-title":"Ieee Transaction on Power System"},{"issue":"4","key":"10.1016\/S0954-1810(98)00018-1_BIB8","doi-asserted-by":"crossref","first-page":"1483","DOI":"10.1109\/59.207371","article-title":"Long rang peak demand forecasting under conditions of high growth","volume":"7","author":"Barakat","year":"1992","journal-title":"Ieee Transaction on Power System"},{"key":"10.1016\/S0954-1810(98)00018-1_BIB9","unstructured":"Yang HT, Liang TC, Shih KR, Huanf CL. Power system yearly peak load forecasting: a gray system modeling approach, International conference on energy management and power delivery, 1 1995."},{"key":"10.1016\/S0954-1810(98)00018-1_BIB10","doi-asserted-by":"crossref","unstructured":"Lui XQ, Ang BW, Goh TN. Forecasting of electricity consumption: a comparison between an econometric model and an neural network model. IEEE transactions on neural networks 1992;2 1254-1259:216\u2013266","DOI":"10.1109\/IJCNN.1991.170569"},{"key":"10.1016\/S0954-1810(98)00018-1_BIB11","first-page":"359","article-title":"Power system load forecasting with ANN and Fuzzy logic control, Computer, Communication, Control and Power Engineering proceedings","volume":"5","author":"Wang","year":"1993","journal-title":"Ieee"},{"key":"10.1016\/S0954-1810(98)00018-1_BIB12","doi-asserted-by":"crossref","unstructured":"Parlos AG, Oufi E, Muthusami J, Patton AD, Atiya AF. Development of an intelligent long-term electrical load forecasting system, Intelligent System Applications to Power System Proceedings, 1996, 288\u2013292.","DOI":"10.1109\/ISAP.1996.501084"},{"key":"10.1016\/S0954-1810(98)00018-1_BIB13","doi-asserted-by":"crossref","unstructured":"Highlay DD, Hilmns TJ. Load forecasting by ANN Computer Application in power, IEEE, 6(3) July 19, 10\u201315.","DOI":"10.1109\/67.222735"},{"key":"10.1016\/S0954-1810(98)00018-1_BIB14","first-page":"4724","article-title":"A neural network architecture for short-term load forecasting","volume":"7","author":"Badra","year":"1994","journal-title":"Ieee International Conference on Neural Network"},{"key":"10.1016\/S0954-1810(98)00018-1_BIB15","series-title":"Modern power system planning","author":"Wang","year":"1994"}],"container-title":["Artificial Intelligence in Engineering"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0954181098000181?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0954181098000181?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2024,12,6]],"date-time":"2024-12-06T23:09:16Z","timestamp":1733526556000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S0954181098000181"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[1999,4]]},"references-count":15,"journal-issue":{"issue":"2","published-print":{"date-parts":[[1999,4]]}},"alternative-id":["S0954181098000181"],"URL":"https:\/\/doi.org\/10.1016\/s0954-1810(98)00018-1","relation":{},"ISSN":["0954-1810"],"issn-type":[{"value":"0954-1810","type":"print"}],"subject":[],"published":{"date-parts":[[1999,4]]}}}