{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,10]],"date-time":"2026-04-10T02:42:59Z","timestamp":1775788979120,"version":"3.50.1"},"reference-count":80,"publisher":"Elsevier BV","issue":"2","license":[{"start":{"date-parts":[[2020,6,1]],"date-time":"2020-06-01T00:00:00Z","timestamp":1590969600000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"},{"start":{"date-parts":[[2020,6,1]],"date-time":"2020-06-01T00:00:00Z","timestamp":1590969600000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/legal\/tdmrep-license"},{"start":{"date-parts":[[2019,10,10]],"date-time":"2019-10-10T00:00:00Z","timestamp":1570665600000},"content-version":"vor","delay-in-days":0,"URL":"http:\/\/creativecommons.org\/licenses\/by-nc-nd\/4.0\/"}],"content-domain":{"domain":["elsevier.com","sciencedirect.com"],"crossmark-restriction":true},"short-container-title":["Ain Shams Engineering Journal"],"published-print":{"date-parts":[[2020,6]]},"DOI":"10.1016\/j.asej.2019.08.012","type":"journal-article","created":{"date-parts":[[2019,11,14]],"date-time":"2019-11-14T11:42:02Z","timestamp":1573731722000},"page":"465-471","update-policy":"https:\/\/doi.org\/10.1016\/elsevier_cm_policy","source":"Crossref","is-referenced-by-count":63,"title":["Review of literature of lean construction and lean tools using systematic literature review technique (2008\u20132018)"],"prefix":"10.1016","volume":"11","author":[{"given":"Subhav","family":"Singh","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Kaushal","family":"Kumar","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"78","reference":[{"key":"10.1016\/j.asej.2019.08.012_b0005","doi-asserted-by":"crossref","unstructured":"Lakmal D. Managing the challenge of generational diversity in the workplace. Ssrn; 2014. p. 1\u201311.","DOI":"10.2139\/ssrn.2390574"},{"issue":"2","key":"10.1016\/j.asej.2019.08.012_b0010","doi-asserted-by":"crossref","first-page":"185","DOI":"10.3311\/PPar.12710","article-title":"Analysing enabling factors affecting the on-site productivity in Indian Construction Industry","volume":"49","author":"Dixit","year":"2018","journal-title":"Period Polytech Archit"},{"issue":"6","key":"10.1016\/j.asej.2019.08.012_b0055","doi-asserted-by":"crossref","first-page":"1071","DOI":"10.1016\/j.ijproman.2016.11.006","article-title":"Project sustainability strategies: a systematic literature review","volume":"35","author":"Aarseth","year":"2017","journal-title":"Int J Proj Manag"},{"key":"10.1016\/j.asej.2019.08.012_b0060","unstructured":"Koskela L, Ballard G, Howell G, Tommelein I. The foundations of lean construction. Des Constr Build Value 2002; December 2015: 211\u201326."},{"issue":"2","key":"10.1016\/j.asej.2019.08.012_b0065","doi-asserted-by":"crossref","first-page":"246","DOI":"10.1108\/CI-04-2017-0033","article-title":"Barriers to implementing lean construction practices in the Kingdom of Saudi Arabia (KSA) construction industry","volume":"18","author":"Sarhan","year":"2018","journal-title":"Constr Innov"},{"issue":"September 2017","key":"10.1016\/j.asej.2019.08.012_b0070","doi-asserted-by":"crossref","first-page":"123","DOI":"10.1016\/j.autcon.2018.05.012","article-title":"Cloud asset-enabled integrated IoT platform for lean prefabricated construction","volume":"93","author":"Xu","year":"2018","journal-title":"Autom Constr"},{"key":"10.1016\/j.asej.2019.08.012_b0075","unstructured":"wwwleanconstructionjournalorg Kahvandi, Ravasan Z, Kahvandi Z, Saghatforoush E, Zare Ravasan A, Mansouri T. An FCM-based dynamic modeling of integrated project delivery implementation challenges in construction projects. Lean Constr J 2018; 87: 63\u201387."},{"issue":"1","key":"10.1016\/j.asej.2019.08.012_b0080","first-page":"45","article-title":"A framework to improve construction processes: Integrating lean, green and six sigma","volume":"14","author":"Banawi","year":"2014","journal-title":"Int J Constr Manag"},{"issue":"October","key":"10.1016\/j.asej.2019.08.012_b0085","doi-asserted-by":"crossref","first-page":"46","DOI":"10.60164\/55h8g4h8c","article-title":"Lean Construction: where are we and how to proceed?","volume":"1","author":"Bertelsen","year":"2004","journal-title":"Lean Constr J"},{"issue":"2","key":"10.1016\/j.asej.2019.08.012_b0090","first-page":"04017053","article-title":"RBL-PHP: simulation of lean construction and information technologies for prefabrication housing production","volume":"34","author":"Li","year":"2017","journal-title":"J Manag Eng"},{"issue":"5","key":"10.1016\/j.asej.2019.08.012_b0095","doi-asserted-by":"crossref","first-page":"518","DOI":"10.1108\/BEPAM-11-2016-0071","article-title":"LiVE approach: Lean integrated Value Engineering for construction industry","volume":"7","author":"Ekanayake","year":"2017","journal-title":"Built Environ Proj Asset Manag"},{"key":"10.1016\/j.asej.2019.08.012_b0100","doi-asserted-by":"crossref","first-page":"788","DOI":"10.1016\/j.jclepro.2017.11.030","article-title":"Interactions of building information modeling, lean and sustainability on the architectural, engineering and construction industry: a systematic review","volume":"174","author":"Saieg","year":"2018","journal-title":"J Clean Prod"},{"issue":"10","key":"10.1016\/j.asej.2019.08.012_b0105","doi-asserted-by":"crossref","first-page":"1298","DOI":"10.1108\/ECAM-08-2017-0188","article-title":"Mobile BIM implementation and lean interaction on construction site: a case study of a complex airport project","volume":"25","author":"Koseoglu","year":"2018","journal-title":"Eng Constr Archit Manag"},{"key":"10.1016\/j.asej.2019.08.012_b0110","doi-asserted-by":"crossref","first-page":"436","DOI":"10.1016\/j.proeng.2016.04.011","article-title":"Ecosystem visualization and analysis of Chinese Prefabricated Housing Industry","volume":"145","author":"Jiang","year":"2016","journal-title":"Proc Eng"},{"key":"10.1016\/j.asej.2019.08.012_b0115","doi-asserted-by":"crossref","first-page":"714","DOI":"10.1016\/j.proenv.2016.07.074","article-title":"Construction waste \u2013 potentials and constraints","volume":"35","author":"Sapuay","year":"2016","journal-title":"Proc Environ Sci"},{"issue":"6","key":"10.1016\/j.asej.2019.08.012_b0120","doi-asserted-by":"crossref","first-page":"1133","DOI":"10.1016\/j.ijproman.2017.01.011","article-title":"Considering sustainability in project management decision making; an investigation using Q-methodology","volume":"35","author":"Gilbert Silvius","year":"2017","journal-title":"Int J Proj Manag"},{"issue":"December 2016","key":"10.1016\/j.asej.2019.08.012_b0125","doi-asserted-by":"crossref","first-page":"348","DOI":"10.1016\/j.scs.2017.03.027","article-title":"Effect of lean tools to control external environment risks of construction projects","volume":"32","author":"Ansah","year":"2017","journal-title":"Sustain Cities Soc"},{"key":"10.1016\/j.asej.2019.08.012_b0130","doi-asserted-by":"crossref","unstructured":"Murata K, Tezel A, Koskela L, Tzortzopoulos P. Sources of waste on construction site: a comparison to the; 2018. p. 973\u201381.","DOI":"10.24928\/2018\/0280"},{"key":"10.1016\/j.asej.2019.08.012_b0135","unstructured":"Tezel A, Koskela LL, Tzortzopoulos P. Visual management in construction: Study report on Brazilian cases. SCRI Res Rep, no. March, p. 36; 2010."},{"key":"10.1016\/j.asej.2019.08.012_b0140","first-page":"504","article-title":"Lean construction tools and techniques","author":"Ballard","year":"2002","journal-title":"Des Constr - Build Value"},{"key":"10.1016\/j.asej.2019.08.012_b0150","doi-asserted-by":"crossref","unstructured":"Dixit S, Mandal SN, Thanikal JV, Saurabh K. Evolution of studies in construction productivity: a systematic literature review (2006\u20132017). Ain Shams Eng J 2019;10(3):555\u201364.","DOI":"10.1016\/j.asej.2018.10.010"},{"issue":"4","key":"10.1016\/j.asej.2019.08.012_b0155","first-page":"1","article-title":"Comparative study on prefabrication construction with cast in-situ construction of residential buildings","volume":"2","author":"Dineshkumar","year":"2015","journal-title":"IJISET \u2013Int. J. Innov. Sci. Eng. Technol."},{"key":"10.1016\/j.asej.2019.08.012_b0160","unstructured":"Mason J. Ean rimer. Readings, no. c, pp. 1\u201346."},{"key":"10.1016\/j.asej.2019.08.012_b0165","doi-asserted-by":"crossref","first-page":"94","DOI":"10.1016\/j.sbspro.2013.11.011","article-title":"Mathematical model for optimization of construction contracting in housing development project","volume":"105","author":"Ngowtanasuwan","year":"2013","journal-title":"Proc - Soc Behav Sci"},{"key":"10.1016\/j.asej.2019.08.012_b0170","doi-asserted-by":"crossref","first-page":"167","DOI":"10.1016\/j.proeng.2016.08.098","article-title":"Modular buildings in modern construction","volume":"153","author":"Generalova","year":"2016","journal-title":"Proc Eng"},{"key":"10.1016\/j.asej.2019.08.012_b0175","unstructured":"C. Information, \u201cW Orld a Cademy of S Cience , E Ngineering and T Echnology,\u201d p. 2017; 2017."},{"key":"10.1016\/j.asej.2019.08.012_b0180","unstructured":"van Egmond-deWilde de Ligny E, Erkelens P. Construction technology diffusion in developing countries: limitations of prevailing innovation systems. J Constr Dev Contries 2008; 13(2): 43\u201364."},{"issue":"12","key":"10.1016\/j.asej.2019.08.012_b0185","doi-asserted-by":"crossref","first-page":"59","DOI":"10.1016\/j.ifacol.2016.07.550","article-title":"Assessment of lean manufacturing and Six Sigma operation with decision making based on the analytic hierarchy process","volume":"49","author":"Alhuraish","year":"2016","journal-title":"IFAC-PapersOnLine"},{"issue":"4","key":"10.1016\/j.asej.2019.08.012_b0190","doi-asserted-by":"crossref","first-page":"697","DOI":"10.1016\/j.aej.2013.07.003","article-title":"Implementation of lean construction techniques for minimizing the risks effect on project construction time","volume":"52","author":"Issa","year":"2013","journal-title":"Alexandria Eng J"},{"key":"10.1016\/j.asej.2019.08.012_b0195","doi-asserted-by":"crossref","first-page":"634","DOI":"10.1016\/j.procs.2016.09.205","article-title":"The integration of lean construction and sustainable construction: a stakeholder perspective in analyzing sustainable lean construction strategies in Malaysia","volume":"100","author":"Jamil","year":"2016","journal-title":"Proc Comput Sci"},{"issue":"1","key":"10.1016\/j.asej.2019.08.012_b0200","doi-asserted-by":"crossref","first-page":"8","DOI":"10.1108\/13664381111116043","article-title":"Value theory in lean construction","volume":"16","author":"Salvatierra-Garrido","year":"2011","journal-title":"J Financ Manag Prop Constr"},{"key":"10.1016\/j.asej.2019.08.012_b0205","doi-asserted-by":"crossref","first-page":"1322","DOI":"10.1016\/j.proeng.2016.04.170","article-title":"Life-cycle assessment of high performance, low cost homes","volume":"145","author":"Li","year":"2016","journal-title":"Proc Eng"},{"key":"10.1016\/j.asej.2019.08.012_b0210","doi-asserted-by":"crossref","unstructured":"Ametepey O, Aigbavboa C, Ansah K. Barriers to successful implementation of sustainable construction in the Ghanaian Construction Industry. Proc Manuf 2015;3(Ahfe): 1682\u20139.","DOI":"10.1016\/j.promfg.2015.07.988"},{"issue":"6","key":"10.1016\/j.asej.2019.08.012_b0215","doi-asserted-by":"crossref","first-page":"1084","DOI":"10.1016\/j.ijproman.2016.04.004","article-title":"Key factors of sustainability in project management context: a survey exploring the project managers\u2019 perspective","volume":"35","author":"Martens","year":"2017","journal-title":"Int J Proj Manag"},{"key":"10.1016\/j.asej.2019.08.012_b0220","first-page":"24","article-title":"Automation in the prefab and modular construction industry","volume":"Isarc","author":"Neelamkavil","year":"2009","journal-title":"Int Symp Autom Robot Constr ISARC"},{"key":"10.1016\/j.asej.2019.08.012_b0225","unstructured":"Packard TJ. R. Cited, U. S. P. Documents, J. Eloise, and J. J. Hohenshell, \u201cUlllted States Patent [19],\u201d vol. 39; 1999."},{"key":"10.1016\/j.asej.2019.08.012_b0230","doi-asserted-by":"crossref","first-page":"595","DOI":"10.1016\/j.procir.2016.11.103","article-title":"Barriers to lean implementation: perceptions of top managers, middle managers and workers","volume":"57","author":"Lodgaard","year":"2016","journal-title":"Proc CIRP"},{"key":"10.1016\/j.asej.2019.08.012_b0235","doi-asserted-by":"crossref","first-page":"1362","DOI":"10.1016\/j.proeng.2016.04.201","article-title":"A construction procurement method to achieve sustainability in modular construction","volume":"145","author":"Molavi","year":"2016","journal-title":"Proc Eng"},{"key":"10.1016\/j.asej.2019.08.012_b0240","doi-asserted-by":"crossref","first-page":"75","DOI":"10.1016\/j.sbspro.2016.05.189","article-title":"The potential application of IBS modular system in the construction of housing scheme in Malaysia","volume":"222","author":"Mohammad","year":"2016","journal-title":"Proc - Soc Behav Sci"},{"key":"10.1016\/j.asej.2019.08.012_b0245","unstructured":"Kilpatrick J. Lean Principles. Utah Manuf Ext Partnersh 2003; 1\u20135."},{"key":"10.1016\/j.asej.2019.08.012_b0250","unstructured":"Engineers Australia WA Division. Recommended Practices for the Application of LEAN Construction Methods to Building New Australian LNG Capacity. Eng. Aust., no. August; 2012."},{"key":"10.1016\/j.asej.2019.08.012_b0255","unstructured":"Mokhtar SN, Mahmood NZ. Approach in construction industry: a study on prefabrication method as a tool for waste minimization. Int Conf Environ Res Technol 2008;(Icert): 184\u20137."},{"issue":"4","key":"10.1016\/j.asej.2019.08.012_b0260","doi-asserted-by":"crossref","first-page":"446","DOI":"10.1108\/CI-04-2015-0024","article-title":"Assessing lean conformance by first-grade contractors in the Jordanian construction industry","volume":"16","author":"Sweis","year":"2016","journal-title":"Constr Innov"},{"key":"10.1016\/j.asej.2019.08.012_b0265","first-page":"1","article-title":"What is lean construction","author":"Howell","year":"1999","journal-title":"Proc Seventh Annu Conf Int Gr Lean Constr"},{"key":"10.1016\/j.asej.2019.08.012_b0270","doi-asserted-by":"crossref","unstructured":"Ert\u00fcrk M, Tuerdi(Maimaitiaili. Tuerdi) M, Wujiabudula A. The effects of six sigma approach on business performance: a study of White Goods (Home Appliances) Sector in Turkey. Proc - Soc Behav Sci 2016; 229: 444\u201352.","DOI":"10.1016\/j.sbspro.2016.07.154"},{"key":"10.1016\/j.asej.2019.08.012_b0275","doi-asserted-by":"crossref","first-page":"569","DOI":"10.1016\/j.procir.2013.06.034","article-title":"Lean leadership - fundamental principles and their application","volume":"7","author":"Dombrowski","year":"2013","journal-title":"Proc CIRP"},{"key":"10.1016\/j.asej.2019.08.012_b0280","doi-asserted-by":"crossref","first-page":"187","DOI":"10.1016\/j.sbspro.2012.09.992","article-title":"The importance of leadership in driving a strategic Lean Six Sigma Management","volume":"58","author":"Pamfilie","year":"2012","journal-title":"Proc - Soc Behav Sci"},{"key":"10.1016\/j.asej.2019.08.012_b0285","doi-asserted-by":"crossref","unstructured":"de Carvalho ACV, Granja AD, da Silva VG. A systematic literature review on integrative lean and sustainability synergies over a building\u2019s lifecycle. Sustain 2017; 9(7).","DOI":"10.3390\/su9071156"},{"issue":"July","key":"10.1016\/j.asej.2019.08.012_b0290","doi-asserted-by":"crossref","first-page":"369","DOI":"10.1016\/j.sbspro.2012.08.042","article-title":"Adaptable housing of precast panel system in Malaysia","volume":"50","author":"Rahim","year":"2012","journal-title":"Proc - Soc Behav Sci"},{"issue":"1","key":"10.1016\/j.asej.2019.08.012_b0295","doi-asserted-by":"crossref","first-page":"55","DOI":"10.1108\/09699980410512665","article-title":"Planning, estimation and productivity in the lean concrete pour","volume":"11","author":"Dunlop","year":"2004","journal-title":"Eng Constr Archit Manag"},{"issue":"4","key":"10.1016\/j.asej.2019.08.012_b0300","doi-asserted-by":"crossref","first-page":"679","DOI":"10.1016\/j.aej.2013.04.008","article-title":"Applying lean thinking in construction and performance improvement","volume":"52","author":"Aziz","year":"2013","journal-title":"Alexandr Eng J"},{"issue":"4","key":"10.1016\/j.asej.2019.08.012_b0305","doi-asserted-by":"crossref","first-page":"1627","DOI":"10.1016\/j.asej.2016.12.005","article-title":"Examining the interaction between lean and sustainability principles in the management process of AEC industry","volume":"9","author":"Khodeir","year":"2018","journal-title":"Ain Shams Eng J"},{"key":"10.1016\/j.asej.2019.08.012_b0310","unstructured":"Ballard G, Howell G. Implementing lean construction: stabilizing work flow. Lean Constr 1994; September 1994: 101\u201310."},{"key":"10.1016\/j.asej.2019.08.012_b0315","doi-asserted-by":"crossref","first-page":"565","DOI":"10.1016\/j.procir.2014.01.146","article-title":"Lean leadership -15 rules for a sustainable lean implementation","volume":"17","author":"Dombrowski","year":"2014","journal-title":"Proc CIRP"},{"issue":"15","key":"10.1016\/j.asej.2019.08.012_b0320","doi-asserted-by":"crossref","first-page":"446","DOI":"10.1016\/S2212-5671(15)00198-7","article-title":"Creating shared value in a construction project \u2013 a case study","volume":"21","author":"Andelin","year":"2015","journal-title":"Proc Econ Financ"},{"issue":"4","key":"10.1016\/j.asej.2019.08.012_b0325","doi-asserted-by":"crossref","first-page":"372","DOI":"10.1108\/09699980810886865","article-title":"Trends of skills and productivity in the UK construction industry","volume":"15","author":"Abdel-Wahab","year":"2008","journal-title":"Eng Constr Archit Manag"},{"issue":"4","key":"10.1016\/j.asej.2019.08.012_b0330","doi-asserted-by":"crossref","first-page":"383","DOI":"10.1108\/09699980810886874","article-title":"Lost in transition: the transfer of lean manufacturing to construction","volume":"15","author":"J\u00f8rgensen","year":"2008","journal-title":"Eng Constr Archit Manag"},{"issue":"4","key":"10.1016\/j.asej.2019.08.012_b0335","doi-asserted-by":"crossref","first-page":"483","DOI":"10.1108\/CI-09-2014-0043","article-title":"Lean and agile integration within offsite construction using discrete event simulation A systematic literature review","volume":"16","author":"Mostafa","year":"2016","journal-title":"Constr Innov"},{"key":"10.1016\/j.asej.2019.08.012_b0340","doi-asserted-by":"crossref","first-page":"268","DOI":"10.1016\/j.proeng.2015.10.088","article-title":"Fresh ready-mixed concrete waste in construction projects: a planning approach","volume":"123","author":"Kazaz","year":"2015","journal-title":"Proc Eng"},{"key":"10.1016\/j.asej.2019.08.012_b0345","article-title":"Prefabricated building construction systems adopted in Hong Kong","author":"Wong","year":"2003","journal-title":"Proc Int"},{"key":"10.1016\/j.asej.2019.08.012_b0350","unstructured":"Bj\u00f6rnfot A, Sard\u00e9n Y. Prefabrication a lean strategy for value generation in construction. In: Proc 14th int gr lean constr 2006; January: 265\u201377."},{"key":"10.1016\/j.asej.2019.08.012_b0355","unstructured":"Bernstein H, Jones S. Lean construction - leveraging collaboration and advanced practices to increase project efficiency 2010; 3(2)."},{"key":"10.1016\/j.asej.2019.08.012_b0360","doi-asserted-by":"crossref","first-page":"87","DOI":"10.1016\/j.sbspro.2012.12.209","article-title":"Lean construction: towards enhancing sustainable construction in Malaysia","volume":"68","author":"Marhani","year":"2012","journal-title":"Proc \u2013 Soc Behav Sci"},{"key":"10.1016\/j.asej.2019.08.012_b0365","doi-asserted-by":"crossref","first-page":"1267","DOI":"10.1016\/j.proeng.2016.04.163","article-title":"Role of lean tools in supporting knowledge creation and performance in lean construction","volume":"145","author":"Zhang","year":"2016","journal-title":"Proc Eng"},{"key":"10.1016\/j.asej.2019.08.012_b0370","unstructured":"Tam V, Tam C, Zeng S, Ng C. Towards adoption of prefabrication in construction Vivian Tam WY1 *, Tam CM 2, Zeng SX 3, Ng William CY 4, Build Environ 2006. p. 1\u201347."},{"issue":"1","key":"10.1016\/j.asej.2019.08.012_b0375","doi-asserted-by":"crossref","first-page":"99","DOI":"10.1108\/14714170710721322","article-title":"Evaluating the effect of construction process characteristics to the applicability of lean principles","volume":"7","author":"Al-Sudairi","year":"2007","journal-title":"Constr Innov"},{"key":"10.1016\/j.asej.2019.08.012_b0380","unstructured":"Giurdanella V, Zanelli A. Lightweight, adaptable and reversible construction: sustainable strategies for housing and Technology Department,\u201d no. July; 2006. p. 189\u201393."},{"issue":"6","key":"10.1016\/j.asej.2019.08.012_b0385","doi-asserted-by":"crossref","first-page":"1120","DOI":"10.1016\/j.ijproman.2017.02.018","article-title":"Can project sustainability management impact project success? An empirical study applying a contingent approach","volume":"35","author":"Carvalho","year":"2017","journal-title":"Int J Proj Manag"},{"issue":"4","key":"10.1016\/j.asej.2019.08.012_b0390","doi-asserted-by":"crossref","first-page":"483","DOI":"10.1108\/CI-09-2014-0043","article-title":"Lean and agile integration within offsite construction using discrete event simulation","volume":"16","author":"Mostafa","year":"2016","journal-title":"Constr Innov"},{"issue":"Part 2","key":"10.1016\/j.asej.2019.08.012_b0395","doi-asserted-by":"crossref","first-page":"226","DOI":"10.1016\/j.autcon.2016.08.007","article-title":"A multi-objective GA-based optimisation for holistic Manufacturing, transportation and Assembly of precast construction","volume":"71","author":"Anvari","year":"2016","journal-title":"Autom. Constr."},{"key":"10.1016\/j.asej.2019.08.012_b0400","unstructured":"Horwath RO. United States Patent [191; 1983."},{"key":"10.1016\/j.asej.2019.08.012_b0405","doi-asserted-by":"crossref","first-page":"85","DOI":"10.1016\/j.proeng.2015.10.062","article-title":"Teaching lean construction: Pontifical Catholic University of Peru Training Course in Lean Project & Construction Management","volume":"123","author":"Brioso","year":"2015","journal-title":"Proc Eng"},{"key":"10.1016\/j.asej.2019.08.012_b0410","doi-asserted-by":"crossref","unstructured":"Kruyt NP, Pennings PC, Faasen R. Optimisation of efficiency of axial fans. Fluid Mach Congr 6-7 Oct. 2014; 2014. p. 13\u201320.","DOI":"10.1533\/9780081001080.1.13"},{"issue":"1","key":"10.1016\/j.asej.2019.08.012_b0415","doi-asserted-by":"crossref","first-page":"88","DOI":"10.1108\/CI-08-2012-0045","article-title":"An empirical study of the impact of lean construction techniques on sustainable construction in the UK","volume":"14","author":"Ogunbiyi","year":"2014","journal-title":"Constr Innov"},{"issue":"10","key":"10.1016\/j.asej.2019.08.012_b0420","doi-asserted-by":"crossref","first-page":"1888","DOI":"10.3390\/su9101888","article-title":"Sustainable construction supply chains through synchronized production planning and control in engineer-to-order enterprises","volume":"9","author":"Dallasega","year":"2017","journal-title":"Sustainability"},{"key":"10.1016\/j.asej.2019.08.012_b0425","doi-asserted-by":"crossref","unstructured":"da CT, Milberg C, Walsh KD. Exploring lean construction practice, research, and education. Eng Constr Archit Manag 2012; 19(5): 512\u201325.","DOI":"10.1108\/09699981211259595"},{"key":"10.1016\/j.asej.2019.08.012_b0430","first-page":"6587","article-title":"Factors influencing construction ergonomic performance in India","volume":"3","author":"Parida","year":"2015","journal-title":"Proc Manuf"},{"issue":"2","key":"10.1016\/j.asej.2019.08.012_b0435","first-page":"29","article-title":"A sustainable manufacturing strategy framework: the convergence of two fields","volume":"20","author":"Ocampo","year":"2015","journal-title":"Asian Acad Manag J"},{"issue":"2","key":"10.1016\/j.asej.2019.08.012_b0440","doi-asserted-by":"crossref","first-page":"141","DOI":"10.1108\/09699981211206089","article-title":"Managing for continuous improvement in off-site construction","volume":"19","author":"Meiling","year":"2012","journal-title":"Eng Constr Archit Manag"},{"key":"10.1016\/j.asej.2019.08.012_b0445","unstructured":"Toyota, \u201cTPS - The Toyota Production System,\u201d no. January; 2013."}],"container-title":["Ain Shams Engineering Journal"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S2090447919301212?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S2090447919301212?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2025,10,30]],"date-time":"2025-10-30T21:00:59Z","timestamp":1761858059000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S2090447919301212"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2020,6]]},"references-count":80,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2020,6]]}},"alternative-id":["S2090447919301212"],"URL":"https:\/\/doi.org\/10.1016\/j.asej.2019.08.012","relation":{},"ISSN":["2090-4479"],"issn-type":[{"value":"2090-4479","type":"print"}],"subject":[],"published":{"date-parts":[[2020,6]]},"assertion":[{"value":"Elsevier","name":"publisher","label":"This article is maintained by"},{"value":"Review of literature of lean construction and lean tools using systematic literature review technique (2008\u20132018)","name":"articletitle","label":"Article Title"},{"value":"Ain Shams Engineering Journal","name":"journaltitle","label":"Journal Title"},{"value":"https:\/\/doi.org\/10.1016\/j.asej.2019.08.012","name":"articlelink","label":"CrossRef DOI link to publisher maintained version"},{"value":"article","name":"content_type","label":"Content Type"},{"value":"\u00a9 2019 The Authors. Published by Elsevier B.V. on behalf of Faculty of Engineering, Ain Shams University.","name":"copyright","label":"Copyright"}]}}