{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,10,22]],"date-time":"2026-10-22T11:47:10Z","timestamp":1792669630246,"version":"4.5.0"},"reference-count":44,"publisher":"Elsevier BV","license":[{"start":{"date-parts":[[2017,12,1]],"date-time":"2017-12-01T00:00:00Z","timestamp":1512086400000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"}],"content-domain":{"domain":["elsevier.com","sciencedirect.com"],"crossmark-restriction":true},"short-container-title":["Automation in Construction"],"published-print":{"date-parts":[[2017,12]]},"DOI":"10.1016\/j.autcon.2017.08.003","type":"journal-article","created":{"date-parts":[[2017,9,21]],"date-time":"2017-09-21T08:00:31Z","timestamp":1505980831000},"page":"242-257","update-policy":"https:\/\/doi.org\/10.1016\/elsevier_cm_policy","source":"Crossref","is-referenced-by-count":44,"special_numbering":"C","title":["Planning the reconstruction of a historical building by using a fuzzy stochastic network"],"prefix":"10.1016","volume":"84","author":[{"ORCID":"https:\/\/orcid.org\/0000-0001-7055-8972","authenticated-orcid":false,"given":"El\u017cbieta","family":"Radziszewska-Zielina","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Grzegorz","family":"\u015aladowski","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Marek","family":"Sibielak","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"78","reference":[{"key":"10.1016\/j.autcon.2017.08.003_bb0005","doi-asserted-by":"crossref","unstructured":"E. Radziszewska-Zielina, G. \u015aladowski, Supporting the selection of a variant of the adaptation of a historical building with the use of fuzzy modelling and structural analysis, J. Cult. Herit. Available online 14 March 2017 https:\/\/doi.org\/10.1016\/j.culher.2017.02.008.","DOI":"10.1016\/j.culher.2017.02.008"},{"issue":"1","key":"10.1016\/j.autcon.2017.08.003_bb0010","doi-asserted-by":"crossref","first-page":"125","DOI":"10.1016\/S0926-5805(98)00070-3","article-title":"Ancient structures and modern analysis: investigating damage and reconstruction at Pompeii","volume":"8","author":"Martini","year":"1998","journal-title":"Autom. Constr."},{"key":"10.1016\/j.autcon.2017.08.003_bb0015","doi-asserted-by":"crossref","first-page":"35","DOI":"10.1016\/j.autcon.2015.03.022","article-title":"Non-destructive building investigation through analysis of GPR signal by S-transform","volume":"55","author":"Szymczyk","year":"2015","journal-title":"Autom. Constr."},{"key":"10.1016\/j.autcon.2017.08.003_bb0020","doi-asserted-by":"crossref","first-page":"140","DOI":"10.1016\/j.autcon.2012.11.035","article-title":"A novel approach to evaluate masonry arch stability on the basis of limit analysis theory and non-destructive geometric characterization","volume":"31","author":"Riveiro","year":"2013","journal-title":"Autom. Constr."},{"key":"10.1016\/j.autcon.2017.08.003_bb0025","doi-asserted-by":"crossref","first-page":"191","DOI":"10.1016\/j.autcon.2012.11.004","article-title":"Impact of modelling architectural detailing for predicting unreinforced masonry response to subsidence","volume":"30","author":"Truong-Hong","year":"2013","journal-title":"Autom. Constr."},{"key":"10.1016\/j.autcon.2017.08.003_bb0030","first-page":"117","article-title":"Description of technological and organizational problems in construction works using the example of restoration of the outer courtyard on Wawel Hill","author":"\u015aladowski","year":"2014","journal-title":"Tech. Trans. 2B"},{"issue":"2","key":"10.1016\/j.autcon.2017.08.003_bb0035","doi-asserted-by":"crossref","first-page":"174","DOI":"10.1016\/0377-2217(89)90211-7","article-title":"Theory and methodology stochastic and fuzzy PERT","volume":"143","author":"Lootsma","year":"1989","journal-title":"Eur. J. Op. Res."},{"issue":"2","key":"10.1016\/j.autcon.2017.08.003_bb0040","doi-asserted-by":"crossref","first-page":"195","DOI":"10.1016\/S0165-0114(00)00076-2","article-title":"Critical path analysis in the network with fuzzy activity times","volume":"122","author":"Chanas","year":"2001","journal-title":"Fuzzy Sets Syst."},{"issue":"3","key":"10.1016\/j.autcon.2017.08.003_bb0045","doi-asserted-by":"crossref","first-page":"305","DOI":"10.1023\/A:1022036931014","article-title":"Fuzzy critical path method based on signed-distance ranking and statistical confidence-interval estimates","volume":"24","author":"Lin","year":"2003","journal-title":"J. Super Comp."},{"issue":"12","key":"10.1016\/j.autcon.2017.08.003_bb0050","doi-asserted-by":"crossref","first-page":"2448","DOI":"10.1016\/j.ins.2007.01.035","article-title":"Applying fuzzy method for measuring criticality in project network","volume":"177","author":"Chen","year":"2007","journal-title":"Inf. Sci."},{"key":"10.1016\/j.autcon.2017.08.003_bb0055","doi-asserted-by":"crossref","first-page":"397","DOI":"10.1016\/j.autcon.2013.05.025","article-title":"Effects of the application of activity calendars on the distribution of project duration in PERT networks","volume":"35","author":"Hajdu","year":"2013","journal-title":"Autom. Constr."},{"issue":"1","key":"10.1016\/j.autcon.2017.08.003_bb0060","doi-asserted-by":"crossref","first-page":"115","DOI":"10.1287\/opre.10.1.115","article-title":"A generalized network approach to the planning and scheduling of research project","volume":"10","author":"Eisner","year":"1962","journal-title":"Op. Res."},{"issue":"3","key":"10.1016\/j.autcon.2017.08.003_bb0065","doi-asserted-by":"crossref","first-page":"494","DOI":"10.1287\/mnsc.10.3.494","article-title":"An algebra for the analysis of generalized activity networks","volume":"10","author":"Elmaghraby","year":"1964","journal-title":"Manag. Sci."},{"issue":"11","key":"10.1016\/j.autcon.2017.08.003_bb0070","first-page":"621","article-title":"On generalized activity networks","volume":"17","author":"Elmaghraby","year":"1966","journal-title":"J. Ind. Eng."},{"key":"10.1016\/j.autcon.2017.08.003_bb0075","series-title":"GERT Graphical Evaluation and Review Technique","author":"Pritsker","year":"1966"},{"key":"10.1016\/j.autcon.2017.08.003_bb0080","series-title":"Systems Analysis and Design Using Network Techniques","author":"Whitehouse","year":"1973"},{"key":"10.1016\/j.autcon.2017.08.003_bb0085","unstructured":"A. Kosecki, Stochastyczne modele sieciowe przy planowaniu zada\u0144 budowlanych (Stochastic Networks as an Instrument for Modelling Construction Projects), Zeszyt naukowy (scientific letters) Politechnika Krakowska (Cracow University of Technology), (0454\u20134862, (2) 1998 ISSN)."},{"issue":"4","key":"10.1016\/j.autcon.2017.08.003_bb0090","first-page":"21","article-title":"O wykorzystaniu sieci typu GERT w planowaniu proces\u00f3w budowlanych","volume":"19","author":"Kamburowski","year":"1984","journal-title":"Problemy Rozwoju Budownictwa (Problems of Development of Construction)"},{"key":"10.1016\/j.autcon.2017.08.003_bb0095","first-page":"57","article-title":"Study on stochastic model for the construction of concrete longitudinal cofferdam in the Three Gorges Project","volume":"8","author":"Hougui","year":"1997","journal-title":"J. Hydraul. Eng."},{"issue":"1","key":"10.1016\/j.autcon.2017.08.003_bb0100","doi-asserted-by":"crossref","DOI":"10.1061\/(ASCE)0733-9364(2001)127:1(1)","article-title":"Dynamic planning and control methodology for design\/build fast-track construction projects","volume":"127","author":"Pe\u00f1a-Mora","year":"2001","journal-title":"J. Constr. Eng. Manag."},{"issue":"4","key":"10.1016\/j.autcon.2017.08.003_bb0105","doi-asserted-by":"crossref","first-page":"409","DOI":"10.1016\/S0926-5805(01)00073-5","article-title":"Principles of the NNM method applied in the analysis of process realization","volume":"11","author":"Wi\u0119ckowski","year":"2002","journal-title":"Autom. Constr."},{"key":"10.1016\/j.autcon.2017.08.003_bb0110","unstructured":"A. Wo\u017aniak, Grafy i sieci w technikach decyzyjnych (Graphs and Networks in Decision-making Techniques), PAN (Polish Academy of Sciences), (1732\u20135587, 2010 ISSN)."},{"key":"10.1016\/j.autcon.2017.08.003_bb0115","series-title":"IEEE Conference Anthology","isbn-type":"print","article-title":"Schedule risk management at early stages of large construction projects based on the GERT model","author":"Gao","year":"2013","ISBN":"https:\/\/id.crossref.org\/isbn\/9781479916603"},{"issue":"2","key":"10.1016\/j.autcon.2017.08.003_bb0120","doi-asserted-by":"crossref","first-page":"137","DOI":"10.25103\/jestr.072.22","article-title":"Critical quality source diagnosis for dam concrete construction based on quality gain-loss function","volume":"7","author":"Wang","year":"2014","journal-title":"J. Eng. Sci. Tech. Rev."},{"issue":"2","key":"10.1016\/j.autcon.2017.08.003_bb0125","doi-asserted-by":"crossref","first-page":"99","DOI":"10.1016\/0165-0114(84)90094-0","article-title":"Fuzzy network technique for technological forecasting","volume":"14","author":"Itakura","year":"1984","journal-title":"Fuzzy Sets Syst."},{"issue":"3","key":"10.1016\/j.autcon.2017.08.003_bb0130","doi-asserted-by":"crossref","first-page":"338","DOI":"10.1016\/S0019-9958(65)90241-X","article-title":"Fuzzy sets","volume":"8","author":"Zadeh","year":"1965","journal-title":"Inf. Control."},{"issue":"1","key":"10.1016\/j.autcon.2017.08.003_bb0135","doi-asserted-by":"crossref","first-page":"5","DOI":"10.3846\/13923730.2011.554172","article-title":"Fuzzy control of the partnering relations of a construction enterprise","volume":"17","author":"Radziszewska-Zielina","year":"2011","journal-title":"J. Civ. Eng. Manag."},{"issue":"3","key":"10.1016\/j.autcon.2017.08.003_bb0140","doi-asserted-by":"crossref","first-page":"89","DOI":"10.1515\/ace-2015-0027","article-title":"Controlling partnering relations in construction operations using fuzzy reasoning","volume":"61","author":"Radziszewska-Zielina","year":"2015","journal-title":"Arch. Civ. Eng."},{"issue":"12","key":"10.1016\/j.autcon.2017.08.003_bb0145","doi-asserted-by":"crossref","first-page":"1910","DOI":"10.1016\/0026-2714(94)90286-0","article-title":"Fuzzy consecutive-k-out-of-n: F system reliability","volume":"34","author":"Cheng","year":"1994","journal-title":"Microelectron. Reliab."},{"issue":"10","key":"10.1016\/j.autcon.2017.08.003_bb0150","doi-asserted-by":"crossref","first-page":"1557","DOI":"10.1016\/0026-2714(95)00200-6","article-title":"Fuzzy repairable reliability-based on fuzzy GERT","volume":"36","author":"Cheng","year":"1996","journal-title":"Microelectron. Reliab."},{"issue":"2","key":"10.1016\/j.autcon.2017.08.003_bb0155","first-page":"156","article-title":"Model formulation and development of fuzzy GERT network","volume":"21","author":"Liu","year":"2004","journal-title":"J. Chinese Inst. Ind. Eng."},{"key":"10.1016\/j.autcon.2017.08.003_bb0160","series-title":"IEEE International Engineering Management Conference, Singapore: IEEE Computer Society Press","isbn-type":"print","doi-asserted-by":"crossref","first-page":"820","DOI":"10.1109\/IEMC.2004.1407495","article-title":"New fuzzy GERT method for research projects scheduling","author":"Gavareshki","year":"2004","ISBN":"https:\/\/id.crossref.org\/isbn\/0780385195"},{"issue":"11","key":"10.1016\/j.autcon.2017.08.003_bb0165","first-page":"17","article-title":"Fuzzy completion time for alternative stochastic networks","volume":"6","author":"Hashemin","year":"2010","journal-title":"J. Ind. Eng. Int."},{"key":"10.1016\/j.autcon.2017.08.003_bb0170","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1155\/2015\/809216","article-title":"Developing a mathematical model for scheduling and determining success probability of research projects considering complex-fuzzy networks","author":"Norouzi","year":"2015","journal-title":"J. Appl. Math."},{"issue":"4","key":"10.1016\/j.autcon.2017.08.003_bb0175","first-page":"111","article-title":"Redukcja rozmytych graf\u00f3w przedsi\u0119wzi\u0119\u0107","volume":"3","author":"Kutschenreiter-Praszkiewicz","year":"2007","journal-title":"Badania Operacyjne (Op.Res.)"},{"issue":"1","key":"10.1016\/j.autcon.2017.08.003_bb0180","doi-asserted-by":"crossref","first-page":"923","DOI":"10.1016\/j.eswa.2010.07.074","article-title":"Evaluating the manufacturing capability of a lithographic area by using a novel vague GERT","volume":"38","author":"Wang","year":"2011","journal-title":"Expert Syst. Appl."},{"issue":"7","key":"10.1016\/j.autcon.2017.08.003_bb0185","doi-asserted-by":"crossref","first-page":"531","DOI":"10.1007\/s00500-005-0483-y","article-title":"The reliability of general vague fault-tree analysis on weapon systems fault diagnosis","volume":"10","author":"Chang","year":"2006","journal-title":"Soft. Comput."},{"issue":"7","key":"10.1016\/j.autcon.2017.08.003_bb0190","doi-asserted-by":"crossref","first-page":"920","DOI":"10.1109\/JRPROC.1956.275147","article-title":"Feedback theory, further properties of signal flow graphs","volume":"44","author":"Mason","year":"1956","journal-title":"Proc. IRE"},{"issue":"2","key":"10.1016\/j.autcon.2017.08.003_bb0195","doi-asserted-by":"crossref","first-page":"610","DOI":"10.1109\/21.229476","article-title":"Vague sets","volume":"23","author":"Gau","year":"1993","journal-title":"IEEE Trans. Syst. Man Cybern."},{"key":"10.1016\/j.autcon.2017.08.003_bb0200","series-title":"P.E.R.T.\/C.P.M.: Programme Evaluation Review Technique, Critical Path Method, Australian Executive Development Foundation","author":"Toal","year":"1967"},{"key":"10.1016\/j.autcon.2017.08.003_bb0205","unstructured":"K.M. Jaworski, Metodologia projektowania realizacji budowy (Design Methodology of the Process of Construction), Polskie Wydawnictwo Naukowe (Polish Scientific Publishers), Warszawa (Warsaw), (978-83-01-16021-0, 2009 ISBN)."},{"key":"10.1016\/j.autcon.2017.08.003_bb0210","unstructured":"G. \u015aladowski, E. Radziszewska-Zielina, The Issue of Restoration of Selected Buildings on Wawel Royal Castle, Integrated Approaches to the Design and Management of Buildings Reconstruction, International University Text Book, Technical University of Kosice, Kosice, (978-90-818529-9-9, 2014 ISBN)."},{"key":"10.1016\/j.autcon.2017.08.003_bb0215","unstructured":"L. Rutkowski, Metody i techniki sztucznej inteligencji (Methods and Techniques of Artificial Intelligence), Polskie Wydawnictwo Naukowe (Polish Scientific Publishers), Warszawa (Warsaw), (978-83-01-15731-9, 2012 ISBN)."},{"key":"10.1016\/j.autcon.2017.08.003_bb0220","first-page":"139","article-title":"Rozmyte modelowanie czas\u00f3w wykonania robot budowlanych w warunkach niepewno\u015bci","author":"Ibadov","year":"2010","journal-title":"Czasopismo Techniczne (Techn. Trans.) 1B"}],"container-title":["Automation in Construction"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0926580517307197?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0926580517307197?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2019,10,3]],"date-time":"2019-10-03T16:12:15Z","timestamp":1570119135000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S0926580517307197"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2017,12]]},"references-count":44,"alternative-id":["S0926580517307197"],"URL":"https:\/\/doi.org\/10.1016\/j.autcon.2017.08.003","relation":{},"ISSN":["0926-5805"],"issn-type":[{"value":"0926-5805","type":"print"}],"subject":[],"published":{"date-parts":[[2017,12]]},"assertion":[{"value":"Elsevier","name":"publisher","label":"This article is maintained by"},{"value":"Planning the reconstruction of a historical building by using a fuzzy stochastic network","name":"articletitle","label":"Article Title"},{"value":"Automation in Construction","name":"journaltitle","label":"Journal Title"},{"value":"https:\/\/doi.org\/10.1016\/j.autcon.2017.08.003","name":"articlelink","label":"CrossRef DOI link to publisher maintained version"},{"value":"article","name":"content_type","label":"Content Type"},{"value":"\u00a9 2017 Elsevier B.V. All rights reserved.","name":"copyright","label":"Copyright"}]}}