{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,1,16]],"date-time":"2026-01-16T18:47:58Z","timestamp":1768589278885,"version":"3.49.0"},"reference-count":51,"publisher":"Elsevier BV","issue":"3","license":[{"start":{"date-parts":[[2011,3,1]],"date-time":"2011-03-01T00:00:00Z","timestamp":1298937600000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"},{"start":{"date-parts":[[2011,3,1]],"date-time":"2011-03-01T00:00:00Z","timestamp":1298937600000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/legal\/tdmrep-license"}],"content-domain":{"domain":["elsevier.com","sciencedirect.com"],"crossmark-restriction":true},"short-container-title":["Cement and Concrete Research"],"published-print":{"date-parts":[[2011,3]]},"DOI":"10.1016\/j.cemconres.2010.12.003","type":"journal-article","created":{"date-parts":[[2011,1,15]],"date-time":"2011-01-15T04:16:43Z","timestamp":1295065003000},"page":"365-372","update-policy":"https:\/\/doi.org\/10.1016\/elsevier_cm_policy","source":"Crossref","is-referenced-by-count":46,"title":["Probabilistic evaluation of initiation time in RC bridge beams with load-induced cracks exposed to de-icing salts"],"prefix":"10.1016","volume":"41","author":[{"given":"Zhao-Hui","family":"Lu","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Yan-Gang","family":"Zhao","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Zhi-Wu","family":"Yu","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Fa-Xing","family":"Ding","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"78","reference":[{"key":"10.1016\/j.cemconres.2010.12.003_bb0005","series-title":"The Mathematics of Diffusion","author":"Crank","year":"1975"},{"key":"10.1016\/j.cemconres.2010.12.003_bb0010","first-page":"157","article-title":"The kinetics of chloride ions penetration in concrete","volume":"4","author":"Collepardi","year":"1970","journal-title":"Il cemento"},{"issue":"1","key":"10.1016\/j.cemconres.2010.12.003_bb0015","doi-asserted-by":"crossref","first-page":"34","DOI":"10.1061\/(ASCE)0733-947X(1984)110:1(34)","article-title":"Deterioration rates of concrete bridge decks","volume":"110","author":"Cady","year":"1984","journal-title":"ASCE Journal of Transport Engineering"},{"key":"10.1016\/j.cemconres.2010.12.003_bb0020","series-title":"Concrete in Marine Environment, Sp-109","first-page":"381","article-title":"Quality and Cover Thickness of Concrete Based on the Estimation of Chloride Penetration in Marine Environments","author":"Takewaka","year":"1988"},{"key":"10.1016\/j.cemconres.2010.12.003_bb0025","doi-asserted-by":"crossref","first-page":"338","DOI":"10.1007\/BF02473426","article-title":"Prediction of long term chloride concentration in concrete","volume":"27","author":"Mangat","year":"1994","journal-title":"Materials and Structures"},{"issue":"6","key":"10.1016\/j.cemconres.2010.12.003_bb0030","first-page":"602","article-title":"Service life prediction of existing concrete structures exposed to marine environment","volume":"93","author":"Maage","year":"1996","journal-title":"ACI Materials Journal"},{"issue":"2","key":"10.1016\/j.cemconres.2010.12.003_bb0035","doi-asserted-by":"crossref","first-page":"89","DOI":"10.1680\/macr.1999.51.2.87","article-title":"The derivation of input data for modeling chloride ingress from eight year U.K. coastal exposure trials","volume":"51","author":"Bamforth","year":"1999","journal-title":"Magazine of Concrete Research"},{"key":"10.1016\/j.cemconres.2010.12.003_bb0040","series-title":"Life-365: Computer Program for Predicting the Service Life and Life-cycle Costs of Reinforced Concrete Exposed to Chlorides","author":"Thomas","year":"2000"},{"issue":"1","key":"10.1016\/j.cemconres.2010.12.003_bb0045","doi-asserted-by":"crossref","first-page":"139","DOI":"10.1016\/S0008-8846(01)00644-5","article-title":"Chloride-induced corrosion of reinforced concrete bridge decks","volume":"32","author":"Kassir","year":"2002","journal-title":"Cement and Concrete Research"},{"issue":"6","key":"10.1016\/j.cemconres.2010.12.003_bb0050","doi-asserted-by":"crossref","first-page":"359","DOI":"10.1680\/macr.2004.56.6.359","article-title":"A semi-closed-form solution for chloride diffusion in concrete with time-varying parameters","volume":"56","author":"Maheswaran","year":"2004","journal-title":"Magazine of Concrete Research"},{"issue":"1","key":"10.1016\/j.cemconres.2010.12.003_bb0055","doi-asserted-by":"crossref","first-page":"37","DOI":"10.1016\/S0008-8846(99)00201-X","article-title":"Influence of cracking on the diffusion properties of cement-based materials Part I: influence of continuous cracks on the steady-state regime","volume":"30","author":"G\u00e9rard","year":"2000","journal-title":"Cement and Concrete Research"},{"issue":"1","key":"10.1016\/j.cemconres.2010.12.003_bb0060","first-page":"38","article-title":"Prediction of chloride ions ingress in uncracked and cracked concrete","volume":"100","author":"Boulfiza","year":"2003","journal-title":"ACI Materials Journal"},{"issue":"6","key":"10.1016\/j.cemconres.2010.12.003_bb0065","doi-asserted-by":"crossref","first-page":"877","DOI":"10.1016\/j.cemconres.2007.10.007","article-title":"Influence of traversing crack on chloride diffusion into concrete","volume":"38","author":"Djerbi","year":"2008","journal-title":"Cement and Concrete Research"},{"issue":"11","key":"10.1016\/j.cemconres.2010.12.003_bb0070","doi-asserted-by":"crossref","first-page":"960","DOI":"10.1016\/S0141-0296(97)00190-9","article-title":"Probabilistic analysis of resistance degradation of reinforced concrete bridge beams under corrosion","volume":"20","author":"Enright","year":"1998","journal-title":"Engineering Structures"},{"issue":"4","key":"10.1016\/j.cemconres.2010.12.003_bb0075","doi-asserted-by":"crossref","first-page":"313","DOI":"10.1016\/S0167-4730(00)00018-7","article-title":"Structural reliability of concrete bridges including improved chloride-induced corrosion models","volume":"22","author":"Vu","year":"2000","journal-title":"Structural Safety"},{"issue":"8","key":"10.1016\/j.cemconres.2010.12.003_bb0080","doi-asserted-by":"crossref","first-page":"1189","DOI":"10.1016\/S0008-8846(02)00760-3","article-title":"Impact of specification changes on chloride-induced corrosion service life of bridge decks","volume":"32","author":"Kirkpatrick","year":"2002","journal-title":"Cement and Concrete Research"},{"issue":"5","key":"10.1016\/j.cemconres.2010.12.003_bb0085","first-page":"391","article-title":"Probabilistic modeling of service life for structures subjected to chlorides","volume":"100","author":"Bentz","year":"2003","journal-title":"ACI Materials Journal"},{"issue":"8","key":"10.1016\/j.cemconres.2010.12.003_bb0090","doi-asserted-by":"crossref","first-page":"1605","DOI":"10.1016\/j.conbuildmat.2006.08.002","article-title":"Reliability of RC beams under chloride-ingress","volume":"21","author":"Duprat","year":"2007","journal-title":"Construction and Building Materials"},{"issue":"3","key":"10.1016\/j.cemconres.2010.12.003_bb0095","doi-asserted-by":"crossref","first-page":"364","DOI":"10.1016\/j.ress.2006.12.010","article-title":"Probabilistic evaluation of initiation time of chloride-induced corrosion","volume":"93","author":"Val","year":"2008","journal-title":"Reliability Engineering and System Safety"},{"issue":"8","key":"10.1016\/j.cemconres.2010.12.003_bb0100","first-page":"1251","article-title":"Numerical solution of mass transport equations in concrete structures","volume":"30","author":"Mart\u00edn-P\u00e9rez","year":"2000","journal-title":"Cement and Concrete Research"},{"issue":"9","key":"10.1016\/j.cemconres.2010.12.003_bb0105","doi-asserted-by":"crossref","first-page":"1487","DOI":"10.1016\/S0008-8846(03)00065-6","article-title":"Relationship between free chloride and total chloride contents in concrete","volume":"33","author":"Mohammed","year":"2003","journal-title":"Cement and Concrete Research"},{"key":"10.1016\/j.cemconres.2010.12.003_bb0110","doi-asserted-by":"crossref","first-page":"279","DOI":"10.1680\/macr.1994.46.169.279","article-title":"Prediction of free chloride concentration in concrete using routine inspection data","volume":"46","author":"Mangat","year":"1994","journal-title":"Magazine of Concrete Research"},{"issue":"5","key":"10.1016\/j.cemconres.2010.12.003_bb0115","first-page":"441","article-title":"Analysis of chloride diffusion into partially saturated concrete","volume":"90","author":"Saetta","year":"1993","journal-title":"ACI Materials Journal"},{"key":"10.1016\/j.cemconres.2010.12.003_bb0120","first-page":"97","article-title":"Service Life Prediction for Concrete Structures Under Seawater by a Numerical Approach","volume":"Volume One","author":"Tang","year":"1996"},{"key":"10.1016\/j.cemconres.2010.12.003_bb0125","first-page":"165","article-title":"Mathematical Modelling of Chloride Effect on Concrete Durability and Protection Measures, Concrete Repair, Rehabilitation and Protection","author":"Papadakis","year":"1996"},{"issue":"4","key":"10.1016\/j.cemconres.2010.12.003_bb0130","doi-asserted-by":"crossref","first-page":"146","DOI":"10.1061\/(ASCE)1076-0342(1998)4:4(146)","article-title":"Structural safety and serviceability of concrete bridges subject to corrosion","volume":"4","author":"Stewart","year":"1998","journal-title":"ASCE Journal of Infrastructure Systems"},{"key":"10.1016\/j.cemconres.2010.12.003_bb0135","series-title":"Proceedings of the Japan Society of Civil Engineers No. 760\/V-63","first-page":"109","article-title":"Quantification of Chloride Diffusion Process into Concrete Under Marine Environment","author":"Maeda","year":"2004"},{"key":"10.1016\/j.cemconres.2010.12.003_bb0140","series-title":"Eurocode 2, Design of Concrete Structures \u2014 Part 1-1: General Rules and Rules for Buildings (EN 1992-1-1)","year":"2004"},{"key":"10.1016\/j.cemconres.2010.12.003_bb0145","unstructured":"E.J. Wallbank, The performance of concrete in bridges: a survey of 200 highway bridges, In: Mansell & Partners, editors, Department of Transport, HSMO, London, 1989."},{"key":"10.1016\/j.cemconres.2010.12.003_bb0150","series-title":"Sructural Safety & Reliability, Proceedings of ICOSSAR'93","first-page":"957","article-title":"Predicting Critical Chloride Levels in Concrete Bridge Decks","author":"Hoffman","year":"1994"},{"key":"10.1016\/j.cemconres.2010.12.003_bb0155","doi-asserted-by":"crossref","first-page":"1122","DOI":"10.1016\/j.cemconres.2009.08.006","article-title":"Critical chloride content in reinforced concrete \u2014 a review","volume":"39","author":"Angst","year":"2009","journal-title":"Cement and Concrete Research"},{"issue":"7","key":"10.1016\/j.cemconres.2010.12.003_bb0160","doi-asserted-by":"crossref","first-page":"1047","DOI":"10.1016\/S0008-8846(00)00265-9","article-title":"Chloride threshold values to depassivate reinforcing bars embedded in a standardized OPC mortar","volume":"30","author":"Alonso","year":"2000","journal-title":"Cement and Concrete Research"},{"key":"10.1016\/j.cemconres.2010.12.003_bb0165","series-title":"Lund Institute of Technology, Division of Building Materials, Report TVBM-3068, Lund, Sweden","article-title":"Critical Evaluation of Factors Affecting Chloride Initiated Reinforcement Corrosion in Concrete","author":"Sandberg","year":"1995"},{"issue":"5","key":"10.1016\/j.cemconres.2010.12.003_bb0170","doi-asserted-by":"crossref","first-page":"777","DOI":"10.1016\/0008-8846(91)90173-F","article-title":"Effect of cement composition on chloride binding and corrosion of reinforcing steel in concrete","volume":"21","author":"Rasheeduzzafar","year":"1991","journal-title":"Cement and Concrete Research"},{"key":"10.1016\/j.cemconres.2010.12.003_bb0175","doi-asserted-by":"crossref","first-page":"63","DOI":"10.1007\/BF02473172","article-title":"Chloride attack of reinforced concrete: an overview","volume":"28","author":"Neville","year":"1995","journal-title":"Materials and Structures"},{"key":"10.1016\/j.cemconres.2010.12.003_bb0180","series-title":"Chloride Profiles in Salty Concrete","first-page":"29","author":"West","year":"1985"},{"key":"10.1016\/j.cemconres.2010.12.003_bb0185","series-title":"Proc. 3rd RILEM Int. Workshop \u201cTesting and Modelling the Chloride Ingress into Concrete\u201d, Madrid","article-title":"Comparison Between Chloride Ion Threshold and Electrochemical Measurements for Reinforcement Corrosion","author":"de Rincon","year":"2002"},{"key":"10.1016\/j.cemconres.2010.12.003_bb0190","doi-asserted-by":"crossref","first-page":"3469","DOI":"10.1016\/S0013-4686(02)00283-9","article-title":"Chloride threshold dependence of pitting potential of reinforcements","volume":"47","author":"Alonso","year":"2002","journal-title":"Electrochimica Acta"},{"key":"10.1016\/j.cemconres.2010.12.003_bb0195","doi-asserted-by":"crossref","first-page":"235","DOI":"10.1680\/macr.1995.47.172.235","article-title":"The ratio of Cl\u2212\/OH\u2212 in chloride contaminated concrete \u2014 a most important criterion","volume":"47","author":"Kayyali","year":"1995","journal-title":"Magazine of Concrete Research"},{"issue":"7","key":"10.1016\/j.cemconres.2010.12.003_bb0200","doi-asserted-by":"crossref","first-page":"1543","DOI":"10.1016\/0008-8846(95)00148-6","article-title":"Factors affecting threshold chloride for reinforcement corrosion in concrete","volume":"25","author":"Hussain","year":"1995","journal-title":"Cement and Concrete Research"},{"issue":"6","key":"10.1016\/j.cemconres.2010.12.003_bb0205","first-page":"534","article-title":"Chloride threshold for corrosion of reinforcement in concrete","volume":"94","author":"Hussain","year":"1996","journal-title":"ACI Materials Journal"},{"issue":"2","key":"10.1016\/j.cemconres.2010.12.003_bb0210","doi-asserted-by":"crossref","first-page":"117","DOI":"10.1680\/macr.2003.55.2.117","article-title":"Experimental investigation of the threshold chloride concentration for corrosion initiation in reinforced concrete structures","volume":"55","author":"Oh","year":"2003","journal-title":"Magazine of Concrete Research"},{"key":"10.1016\/j.cemconres.2010.12.003_bb0215","series-title":"Building Code Requirements for Structural Concrete (ACI 318-05) and Commentary (ACI 318R-05)","author":"ACI","year":"2005"},{"key":"10.1016\/j.cemconres.2010.12.003_bb0220","first-page":"233","article-title":"Corrosion of steel bars in concrete with various steel surface conditions","volume":"103","author":"Mohammed","year":"2006","journal-title":"ACI Materials Journal"},{"issue":"5","key":"10.1016\/j.cemconres.2010.12.003_bb0225","doi-asserted-by":"crossref","first-page":"1902","DOI":"10.1016\/j.conbuildmat.2008.09.011","article-title":"Influence of detection methods on chloride threshold value for the corrosion of steel reinforcement","volume":"23","author":"Xu","year":"2009","journal-title":"Construction and Building Materials"},{"key":"10.1016\/j.cemconres.2010.12.003_bb0230","series-title":"Understanding Corrosion and Cathodic Protection of Reinforced Concrete Structures","author":"Daily","year":"1997"},{"key":"10.1016\/j.cemconres.2010.12.003_bb0235","series-title":"Structural Reliability Analysis and Prediction","author":"Melchers","year":"1999"},{"key":"10.1016\/j.cemconres.2010.12.003_bb0240","doi-asserted-by":"crossref","first-page":"357","DOI":"10.1016\/S0167-4730(99)00030-2","article-title":"Reliability analysis of deteriorating structures \u2014 the experience and needs of practicing engineers","volume":"21","author":"Sarveswaran","year":"1999","journal-title":"Structural Safety"},{"issue":"2","key":"10.1016\/j.cemconres.2010.12.003_bb0245","first-page":"158","article-title":"Statistical analysis of compressive strength of concrete in structures","volume":"93","author":"Bartlett","year":"1996","journal-title":"ACI Material Journal"},{"issue":"2","key":"10.1016\/j.cemconres.2010.12.003_bb0250","first-page":"61","article-title":"Bridge deck cover depth specifications","volume":"25","author":"Weyers","year":"2003","journal-title":"Concrete International"},{"key":"10.1016\/j.cemconres.2010.12.003_bb0255","series-title":"Model Code for Service Life Design","author":"CEB-FIP","year":"2006"}],"container-title":["Cement and Concrete Research"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0008884610002760?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0008884610002760?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2025,9,13]],"date-time":"2025-09-13T23:37:17Z","timestamp":1757806637000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S0008884610002760"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2011,3]]},"references-count":51,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2011,3]]}},"alternative-id":["S0008884610002760"],"URL":"https:\/\/doi.org\/10.1016\/j.cemconres.2010.12.003","relation":{},"ISSN":["0008-8846"],"issn-type":[{"value":"0008-8846","type":"print"}],"subject":[],"published":{"date-parts":[[2011,3]]},"assertion":[{"value":"Elsevier","name":"publisher","label":"This article is maintained by"},{"value":"Probabilistic evaluation of initiation time in RC bridge beams with load-induced cracks exposed to de-icing salts","name":"articletitle","label":"Article Title"},{"value":"Cement and Concrete Research","name":"journaltitle","label":"Journal Title"},{"value":"https:\/\/doi.org\/10.1016\/j.cemconres.2010.12.003","name":"articlelink","label":"CrossRef DOI link to publisher maintained version"},{"value":"article","name":"content_type","label":"Content Type"},{"value":"Copyright \u00a9 2010 Elsevier Ltd. All rights reserved.","name":"copyright","label":"Copyright"}]}}