{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,8,29]],"date-time":"2026-08-29T07:57:40Z","timestamp":1787990260897,"version":"build-2784847793"},"reference-count":21,"publisher":"Elsevier BV","license":[{"start":{"date-parts":[[2024,11,1]],"date-time":"2024-11-01T00:00:00Z","timestamp":1730419200000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"},{"start":{"date-parts":[[2024,11,1]],"date-time":"2024-11-01T00:00:00Z","timestamp":1730419200000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/legal\/tdmrep-license"}],"funder":[{"DOI":"10.13039\/100012725","name":"Tecnol\u00f3gico Nacional de M\u00e9xico","doi-asserted-by":"publisher","id":[{"id":"10.13039\/100012725","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":["elsevier.com","sciencedirect.com"],"crossmark-restriction":true},"short-container-title":["Chemical Engineering Research and Design"],"published-print":{"date-parts":[[2024,11]]},"DOI":"10.1016\/j.cherd.2024.09.028","type":"journal-article","created":{"date-parts":[[2024,9,20]],"date-time":"2024-09-20T15:52:28Z","timestamp":1726847548000},"page":"1-8","update-policy":"https:\/\/doi.org\/10.1016\/elsevier_cm_policy","source":"Crossref","is-referenced-by-count":5,"special_numbering":"C","title":["A mathematical programming model for the supply chain of lithium in a macroscopic system: The case-study of Mexico"],"prefix":"10.1016","volume":"211","author":[{"given":"Luis R.","family":"Barajas-Villarruel","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Wendy G.","family":"Flores-Guerrero","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Vicente","family":"Rico-Ramirez","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Edgar O.","family":"Castrej\u00f3n-Gonz\u00e1lez","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"78","reference":[{"key":"10.1016\/j.cherd.2024.09.028_bib1","unstructured":"Argentinean Secretary of Mining (2021). Informe Litio. Retrieved in November 20, 2023, from: \u3008https:\/\/www.argentina.gob.ar\/sites\/default\/files\/informe_litio_2021_final.pdf\u3009."},{"issue":"7","key":"10.1016\/j.cherd.2024.09.028_bib2","doi-asserted-by":"crossref","first-page":"604","DOI":"10.3390\/min10070604","article-title":"Assessment of the supply chain under uncertainty: The Case of lithium","volume":"10","author":"Calisaya-Azpilcueta","year":"2020","journal-title":"Minerals"},{"key":"10.1016\/j.cherd.2024.09.028_bib3","doi-asserted-by":"crossref","first-page":"1312","DOI":"10.3390\/met10101312","article-title":"Literature review and thermodynamic modelling of roasting processes for lithium extraction from spodumene","volume":"10","author":"Fosu","year":"2020","journal-title":"Metals"},{"key":"10.1016\/j.cherd.2024.09.028_bib4","unstructured":"INEGI (2023). Administrative registry of the light vehicle automotive industry. Retrieved in December 15, 2023, from: \u3008https:\/\/www.inegi.org.mx\/datosprimarios\/iavl\/\u3009."},{"key":"10.1016\/j.cherd.2024.09.028_bib5","unstructured":"King, N. (2023). EVs Forecast to Account for Two Thirds of Global Light-Vehicle Sales in 2035. The electric vehicle world sales database. Retrieved in December 10, 2023 from: \u3008https:\/\/www.ev-volumes.com\/\u3009."},{"issue":"2","key":"10.1016\/j.cherd.2024.09.028_bib6","doi-asserted-by":"crossref","first-page":"123","DOI":"10.1080\/08827508.2019.1668387","article-title":"Review of lithium production and recovery from minerals, brines, and lithium-ion batteries","volume":"42","author":"Meng","year":"2021","journal-title":"Miner. Process. Extr. Metall. Rev."},{"key":"10.1016\/j.cherd.2024.09.028_bib7","unstructured":"Metallurgists (2017). Recovering lithium from clays. Retrieved in December 2, 2023 from: \u3008https:\/\/www.911metallurgist.com\/recovering-lithium-clays\/\u3009."},{"key":"10.1016\/j.cherd.2024.09.028_bib8","unstructured":"Mexican Geological Agency (2020). Depositos de Litio en Mexico. Retrieved in March 14, 2023, from: \u3008https:\/\/www.geomin.com.mx\/pdf\/panel\/litio\/PRESENTA_LITIO_MEXICO_AIMMGMNov2020_Corregida.pdf\u3009."},{"key":"10.1016\/j.cherd.2024.09.028_bib9","unstructured":"Mexican Secretary of Communications and Transportation (2023). Traza tu ruta. Retrieved in December 1, 2023 From: \u3008https:\/\/app.sct.gob.mx\/sibuac_internet\/ControllerUI?action=cmdEscogeRuta\u3009."},{"key":"10.1016\/j.cherd.2024.09.028_bib10","unstructured":"Mexican Secretary of Economy (2020). Perfil del Mercado de Litio. Retrieved in February 28, 2023, from: \u3008https:\/\/www.gob.mx\/cms\/uploads\/attachment\/file\/624816\/15Perfil_Litio_2020__T_.pdf\u3009."},{"key":"10.1016\/j.cherd.2024.09.028_bib11","unstructured":"National Renewable Energy Laboratory (2021). Techno-economic analysis of Lithium extraction from geothermal brines. Technical Report NREL\/TP-5700-79178. Retrieved in June 20, 2023 from: \u3008https:\/\/www.nrel.gov\/docs\/fy21osti\/79178.pdf\u3009."},{"key":"10.1016\/j.cherd.2024.09.028_bib12","unstructured":"NS Energy (2023). European Lithium estimates capex of $866m for Wolfsberg lithium project. Retrieved in December 1, 2023, from: \u3008https:\/\/www.nsenergybusiness.com\/news\/european-lithium-estimates-capex-of-866m-for-wolfsberg-lithium-project\/\u3009."},{"key":"10.1016\/j.cherd.2024.09.028_bib13","doi-asserted-by":"crossref","first-page":"229","DOI":"10.1016\/j.joule.2017.08.019","article-title":"Lithium-ion battery supply chain considerations: analysis of potential bottlenecks in critical metals","volume":"1","author":"Olivetti","year":"2017","journal-title":"Joule"},{"key":"10.1016\/j.cherd.2024.09.028_bib14","doi-asserted-by":"crossref","first-page":"131","DOI":"10.1016\/j.procir.2023.02.023","article-title":"Comparison of lithium-ion battery supply chains\u2013a life cycle sustainability assessment","volume":"116","author":"Popien","year":"2023","journal-title":"Procedia CIRP"},{"key":"10.1016\/j.cherd.2024.09.028_bib15","first-page":"253","article-title":"Decentralized master production and recycling scheduling of lithium\u2011ion batteries: a techno\u2011economic optimization model","volume":"91","author":"Scheller","year":"2021","journal-title":"J. Bus. Econ."},{"key":"10.1016\/j.cherd.2024.09.028_bib16","doi-asserted-by":"crossref","unstructured":"United States Geological Survey (2022), Mineral Commodity Summaries 2022, p. 100-101. Retrieved in December 2, 2023 from \u3008https:\/\/pubs.usgs.gov\/publication\/mcs2022\u3009. https:\/\/doi.org\/10.3133\/mcs2022.","DOI":"10.3133\/mcs2022"},{"key":"10.1016\/j.cherd.2024.09.028_bib17","unstructured":"United States International Trade Administration (2023). Mexico Country Commercial Guide: Automotive industry. Retrieved in November 5, 2024 from: \u3008https:\/\/www.trade.gov\/country-commercial-guides\/mexico-automotive-industry\u3009."},{"key":"10.1016\/j.cherd.2024.09.028_bib18","doi-asserted-by":"crossref","first-page":"418","DOI":"10.3390\/pr11020418","article-title":"Lithium in a Sustainable Circular Economy: A Comprehensive Review","volume":"11","author":"Vega-Garcia","year":"2023","journal-title":"Processes"},{"issue":"2","key":"10.1016\/j.cherd.2024.09.028_bib19","doi-asserted-by":"crossref","first-page":"209","DOI":"10.1007\/s12613-022-2544-y","article-title":"A review of lithium extraction from natural resources","volume":"30","author":"Yubo","year":"2023","journal-title":"Int. J. Miner."},{"key":"10.1016\/j.cherd.2024.09.028_bib20","doi-asserted-by":"crossref","first-page":"1260","DOI":"10.1016\/j.procs.2022.01.160","article-title":"Closed-loop supply chain models of lithium-ion battery considering corporate social responsibility","volume":"199","author":"Yue","year":"2022","journal-title":"Procedia Comput. Sci."},{"key":"10.1016\/j.cherd.2024.09.028_bib21","doi-asserted-by":"crossref","DOI":"10.1016\/j.mineng.2019.105868","article-title":"Systematic review of lithium extraction from salt lake brines via precipitation approaches","volume":"139","author":"Zhang","year":"2019","journal-title":"Miner. Eng."}],"container-title":["Chemical Engineering Research and Design"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0263876224005604?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0263876224005604?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2024,11,13]],"date-time":"2024-11-13T13:34:35Z","timestamp":1731504875000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S0263876224005604"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2024,11]]},"references-count":21,"alternative-id":["S0263876224005604"],"URL":"https:\/\/doi.org\/10.1016\/j.cherd.2024.09.028","relation":{},"ISSN":["0263-8762"],"issn-type":[{"value":"0263-8762","type":"print"}],"subject":[],"published":{"date-parts":[[2024,11]]},"assertion":[{"value":"Elsevier","name":"publisher","label":"This article is maintained by"},{"value":"A mathematical programming model for the supply chain of lithium in a macroscopic system: The case-study of Mexico","name":"articletitle","label":"Article Title"},{"value":"Chemical Engineering Research and Design","name":"journaltitle","label":"Journal Title"},{"value":"https:\/\/doi.org\/10.1016\/j.cherd.2024.09.028","name":"articlelink","label":"CrossRef DOI link to publisher maintained version"},{"value":"article","name":"content_type","label":"Content Type"},{"value":"\u00a9 2024 Institution of Chemical Engineers. Published by Elsevier Ltd. All rights are reserved, including those for text and data mining, AI training, and similar technologies.","name":"copyright","label":"Copyright"}]}}