{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,11,13]],"date-time":"2025-11-13T21:54:57Z","timestamp":1763070897354,"version":"build-2065373602"},"reference-count":13,"publisher":"Elsevier BV","license":[{"start":{"date-parts":[[2015,11,1]],"date-time":"2015-11-01T00:00:00Z","timestamp":1446336000000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"},{"start":{"date-parts":[[2015,11,1]],"date-time":"2015-11-01T00:00:00Z","timestamp":1446336000000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/legal\/tdmrep-license"},{"start":{"date-parts":[[2015,11,17]],"date-time":"2015-11-17T00:00:00Z","timestamp":1447718400000},"content-version":"vor","delay-in-days":16,"URL":"http:\/\/creativecommons.org\/licenses\/by-nc-nd\/4.0\/"}],"content-domain":{"domain":["elsevier.com","sciencedirect.com"],"crossmark-restriction":true},"short-container-title":["Energy Procedia"],"published-print":{"date-parts":[[2015,11]]},"DOI":"10.1016\/j.egypro.2015.11.782","type":"journal-article","created":{"date-parts":[[2015,12,29]],"date-time":"2015-12-29T22:37:38Z","timestamp":1451428658000},"page":"3210-3215","update-policy":"https:\/\/doi.org\/10.1016\/elsevier_cm_policy","source":"Crossref","is-referenced-by-count":21,"special_numbering":"C","title":["Energy Assessment of A Pcm\u2013Embedded Plaster: Embodied Energy Versus Operational Energy"],"prefix":"10.1016","volume":"78","author":[{"given":"Corrado","family":"Carbonaro","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Ylenia","family":"Cascone","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Stefano","family":"Fantucci","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Valentina","family":"Serra","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Marco","family":"Perino","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Marco","family":"Dutto","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"78","reference":[{"key":"10.1016\/j.egypro.2015.11.782_bib0005","doi-asserted-by":"crossref","unstructured":"Bianco L, Serra V, Fantucci S, Dutto M, Massolino M. Thermal insulating plaster as a solution for refurbishing historic building envelopes: First experimental results. Energy Build 2015; 95:86-91; doi:10.1016\/j.enbuild.2014.11.016.","DOI":"10.1016\/j.enbuild.2014.11.016"},{"key":"10.1016\/j.egypro.2015.11.782_bib0010","unstructured":"E N ISO 12667. Thermal Performance of Building Materials and Products \u2013 Determination of Thermal Resistance by Means of Guarded Hot Plate and HeatFlow Meter Methods \u2013 Products of High and Medium Thermal Resistance; 2001."},{"key":"10.1016\/j.egypro.2015.11.782_bib0015","unstructured":"E N ISO 13786. Thermal performance of building components - Dynamic thermal characteristics - Calculation methods; 2007."},{"key":"10.1016\/j.egypro.2015.11.782_bib0020","doi-asserted-by":"crossref","first-page":"183","DOI":"10.1016\/j.enbuild.2014.11.068","article-title":"Thermal properties of smart microencapsulated paraffinplaster composites for the thermal regulation of buildings","volume":"88","author":"Karkri","year":"2015","journal-title":"Energ Buildings"},{"key":"10.1016\/j.egypro.2015.11.782_bib0025","unstructured":"U.S. Department of Energy. EnergyPlus Engineering Reference. Office of Energy Efficiency and Renewable Energy, United States; 2014."},{"key":"10.1016\/j.egypro.2015.11.782_bib0030","unstructured":"EN ISO 13790. Energy performance of buildings - Calculation of energy use for space heating and cooling; 2008."},{"key":"10.1016\/j.egypro.2015.11.782_bib0035","first-page":"990","volume":"113","author":"Ascione","year":"2014","journal-title":"Energy refurbishment of existing buildings through the use of phase change materials: Energy savings and indoor comfort in the cooling season. Appl Energ;"},{"key":"10.1016\/j.egypro.2015.11.782_bib0040","unstructured":"E N ISO 14040\/44. Environmental Management \u2013 Life cycle assessment; 2006."},{"key":"10.1016\/j.egypro.2015.11.782_bib0045","doi-asserted-by":"crossref","first-page":"534","DOI":"10.1016\/j.apenergy.2011.11.020","article-title":"Evaluation of the environmental impact of experimental cubicles using Life Cycle Assessment: A highlight on the manufacturing phase","volume":"92","author":"Menoufi","year":"2012","journal-title":"Appl Energ"},{"key":"10.1016\/j.egypro.2015.11.782_bib0050","unstructured":"www.bath.ac.uk\/mech-eng\/sert\/embodied."},{"key":"10.1016\/j.egypro.2015.11.782_bib0055","article-title":"Eco-design approach for Innovating building product. In: Proceeding in LCA case study Symposium;","volume":"13","author":"Carbonaro","year":"2013","journal-title":"Rome. Italy Nov 11"},{"key":"10.1016\/j.egypro.2015.11.782_bib0060","first-page":"1517","volume":"42","author":"De Gracia","year":"2010","journal-title":"Life Cycle Assessment of the inclusion of phase change materials (PCM) in experimental buildings. Energ Buildings;"},{"key":"10.1016\/j.egypro.2015.11.782_bib0065","doi-asserted-by":"crossref","first-page":"115","DOI":"10.1016\/j.solener.2013.07.023","article-title":"Life cycle assessment of a ventilated facade with PCM in its air chamber","volume":"104","author":"De Gracia","year":"2014","journal-title":"Sol Energy"}],"container-title":["Energy Procedia"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S187661021502514X?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S187661021502514X?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2025,10,29]],"date-time":"2025-10-29T18:38:58Z","timestamp":1761763138000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S187661021502514X"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2015,11]]},"references-count":13,"alternative-id":["S187661021502514X"],"URL":"https:\/\/doi.org\/10.1016\/j.egypro.2015.11.782","relation":{},"ISSN":["1876-6102"],"issn-type":[{"type":"print","value":"1876-6102"}],"subject":[],"published":{"date-parts":[[2015,11]]},"assertion":[{"value":"Elsevier","name":"publisher","label":"This article is maintained by"},{"value":"Energy Assessment of A Pcm\u2013Embedded Plaster: Embodied Energy Versus Operational Energy","name":"articletitle","label":"Article Title"},{"value":"Energy Procedia","name":"journaltitle","label":"Journal Title"},{"value":"https:\/\/doi.org\/10.1016\/j.egypro.2015.11.782","name":"articlelink","label":"CrossRef DOI link to publisher maintained version"},{"value":"article","name":"content_type","label":"Content Type"},{"value":"Copyright \u00a9 2015 The Authors. Published by Elsevier Ltd.","name":"copyright","label":"Copyright"}]}}