{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,5,15]],"date-time":"2026-05-15T17:41:04Z","timestamp":1778866864753,"version":"3.51.4"},"reference-count":59,"publisher":"Elsevier BV","issue":"10","license":[{"start":{"date-parts":[[2019,10,1]],"date-time":"2019-10-01T00:00:00Z","timestamp":1569888000000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"},{"start":{"date-parts":[[2019,10,1]],"date-time":"2019-10-01T00:00:00Z","timestamp":1569888000000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/legal\/tdmrep-license"},{"start":{"date-parts":[[2019,9,26]],"date-time":"2019-09-26T00:00:00Z","timestamp":1569456000000},"content-version":"vor","delay-in-days":0,"URL":"http:\/\/creativecommons.org\/licenses\/by-nc-nd\/4.0\/"}],"content-domain":{"domain":["cell.com","elsevier.com","sciencedirect.com"],"crossmark-restriction":true},"short-container-title":["Heliyon"],"published-print":{"date-parts":[[2019,10]]},"DOI":"10.1016\/j.heliyon.2019.e02538","type":"journal-article","created":{"date-parts":[[2019,11,3]],"date-time":"2019-11-03T11:08:05Z","timestamp":1572779285000},"page":"e02538","update-policy":"https:\/\/doi.org\/10.1016\/elsevier_cm_policy","source":"Crossref","is-referenced-by-count":6,"title":["Optimal placement of phasor measurement units considering islanding contingency, communication infrastructure, and quality of service"],"prefix":"10.1016","volume":"5","author":[{"given":"M.M.H.","family":"Elroby","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"S.F.","family":"Mekhamer","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"H.E.A.","family":"Talaat","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"M.A.M.","family":"Hassan","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"78","reference":[{"key":"10.1016\/j.heliyon.2019.e02538_bib1","first-page":"1","article-title":"Mixed measurements state estimation based on wide-area measurement system and analysis","volume":"2005","author":"Ding","year":"2005","journal-title":"Proc. IEEE Power Eng. Soc. Transm. Distrib. Conf."},{"key":"10.1016\/j.heliyon.2019.e02538_bib2","first-page":"1","article-title":"IEEE guide for synchronization , calibration , testing , and installation of phasor measurement units ( PMUs ) for power system protection and control IEEE power and Energy society","author":"System","year":"2013","journal-title":"IEEE Std C37.242-2013"},{"key":"10.1016\/j.heliyon.2019.e02538_bib3","series-title":"Technical Report on Telecontrol Equipment and 29 Systems\u2014Part 6","year":"1995"},{"issue":"4","key":"10.1016\/j.heliyon.2019.e02538_bib4","doi-asserted-by":"crossref","first-page":"2381","DOI":"10.1109\/TPWRD.2005.855457","article-title":"Phasor measurement unit placement techniques for complete and incomplete observability","volume":"20","author":"Nuqui","year":"2005","journal-title":"IEEE Trans. Power Deliv."},{"issue":"2","key":"10.1016\/j.heliyon.2019.e02538_bib5","doi-asserted-by":"crossref","first-page":"391","DOI":"10.1016\/j.future.2011.04.014","article-title":"A\u00a0survey of communication\/networking in Smart Grids","volume":"28","author":"Gao","year":"2012","journal-title":"Future Gener. Comput. Syst."},{"issue":"6","key":"10.1016\/j.heliyon.2019.e02538_bib6","doi-asserted-by":"crossref","first-page":"2736","DOI":"10.1016\/j.rser.2011.02.039","article-title":"Smart meters for power grid: challenges, issues, advantages and status","volume":"15","author":"Depuru","year":"2011","journal-title":"Renew. Sustain. Energy Rev."},{"key":"10.1016\/j.heliyon.2019.e02538_bib7","first-page":"877","article-title":"A\u00a0survey on communication networks for electric system Automation","author":"Cagri","year":"2006","journal-title":"Comput. Network."},{"key":"10.1016\/j.heliyon.2019.e02538_bib8","series-title":"\u201cSurvey on Priorities and Communication Requirements for PMU-Based Applications in the Nordic Region,\u201d 2009 IEEE Bucharest PowerTech Innov. Ideas Towar. Electr. Grid Futur.","author":"Chenine","year":"2009"},{"issue":"1","key":"10.1016\/j.heliyon.2019.e02538_bib9","doi-asserted-by":"crossref","first-page":"20","DOI":"10.1109\/TSG.2010.2044815","article-title":"Synchronized phasor measurement applications in power systems","volume":"1","author":"De La Ree","year":"2010","journal-title":"IEEE Trans. Smart Grid"},{"issue":"2","key":"10.1016\/j.heliyon.2019.e02538_bib10","doi-asserted-by":"crossref","first-page":"1070","DOI":"10.1109\/TPWRS.2011.2179816","article-title":"Taxonomy of PMU placement methodologies","volume":"27","author":"Manousakis","year":"2012","journal-title":"IEEE Trans. Power Syst."},{"key":"10.1016\/j.heliyon.2019.e02538_bib11","series-title":"Electric Power Components and Systems A Brief Review of Phasor Measurement Units as Sensors for Smart Grid A Brief Review of Phasor Measurement Units as Sensors for Smart Grid","volume":"5008","author":"Mohanta","year":"2016"},{"issue":"2","key":"10.1016\/j.heliyon.2019.e02538_bib12","doi-asserted-by":"crossref","first-page":"707","DOI":"10.1109\/59.260810","article-title":"Power system observability with minimal phasor measurement placement","volume":"8","author":"Baldwin","year":"1993","journal-title":"IEEE Trans. Power Syst."},{"key":"10.1016\/j.heliyon.2019.e02538_bib13","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/j.epsr.2012.01.020","article-title":"A\u00a0new method for optimal placement of phasor measurement units to maintain full network observability under various contingencies","volume":"89","author":"Enshaee","year":"2012","journal-title":"Electr. Power Syst. Res."},{"key":"10.1016\/j.heliyon.2019.e02538_bib14","first-page":"0","article-title":"Optimal placement of phasor measurement units for state","author":"Bei","year":"2005","journal-title":"PSERC, Final Proj. Rep."},{"key":"10.1016\/j.heliyon.2019.e02538_bib15","series-title":"\u201cState Estimation and Voltage Security Monitoring Using Synchronized Phasor Measurements,\u201d Ph.D. Diss. Dept. Elect. Comput. Eng., Virginia Polytech. Inst. State Univ., Blacksburg, VA","first-page":"1","author":"Nuqui","year":"2001"},{"issue":"3","key":"10.1016\/j.heliyon.2019.e02538_bib16","doi-asserted-by":"crossref","first-page":"1099","DOI":"10.1109\/TPWRS.2008.926475","article-title":"Generalized integer linear programming formulation for optimal PMU placement","volume":"23","author":"Gou","year":"2008","journal-title":"IEEE Trans. Power Syst."},{"issue":"1","key":"10.1016\/j.heliyon.2019.e02538_bib17","first-page":"1472","article-title":"Observability analysis and measurement placement for systems with PMUs","volume":"2004","author":"Abur","year":"2004","journal-title":"IEEE PES Power Syst. Conf. Expo."},{"issue":"3","key":"10.1016\/j.heliyon.2019.e02538_bib18","doi-asserted-by":"crossref","first-page":"1035","DOI":"10.1109\/TPWRS.2003.814882","article-title":"Numerical observability analysis based on network graph theory","volume":"18","author":"Korres","year":"2003","journal-title":"IEEE Trans. Power Syst."},{"key":"10.1016\/j.heliyon.2019.e02538_bib19","series-title":"A\u00a0New PMU Placement Algorithm to Meet a Specified Synchrophasor Availability","first-page":"1","author":"Sarailoo","year":"2016"},{"key":"10.1016\/j.heliyon.2019.e02538_bib20","series-title":"Reliable Placement of Synchronized Phasor","author":"Emami","year":"2009"},{"issue":"1","key":"10.1016\/j.heliyon.2019.e02538_bib21","doi-asserted-by":"crossref","first-page":"101","DOI":"10.1109\/TPWRD.2006.881425","article-title":"An optimal PMU placement method against measurement loss and branch outage","volume":"22","author":"Rakpenthai","year":"2007","journal-title":"IEEE Trans. Power Deliv."},{"key":"10.1016\/j.heliyon.2019.e02538_bib22","series-title":"Impact of Network Sparsity on Strategic Placement of Phasor Measurement Units with Fixed Channel Capacity","first-page":"3445","author":"Korkal\u0131","year":"2010"},{"issue":"1","key":"10.1016\/j.heliyon.2019.e02538_bib23","first-page":"38","article-title":"Robust measurement design by placing synchronized phasor measurements on network branches","volume":"25","author":"Emami","year":"2010"},{"key":"10.1016\/j.heliyon.2019.e02538_bib24","doi-asserted-by":"crossref","first-page":"254","DOI":"10.1016\/j.ijepes.2017.08.025","article-title":"Electrical Power and Energy Systems an optimal joint placement of PMUs and flow measurements for ensuring power system observability under N-2 transmission contingencies","volume":"95","author":"Zhu","year":"2018","journal-title":"Int. J. Electr. Power Energy Syst."},{"key":"10.1016\/j.heliyon.2019.e02538_bib25","unstructured":"J. Q. Tort\u00f3s et\u00a0al., \u201cOptimal Placement of Phasor Measurement Units to Improve Parallel Power System Restoration,\u201d pp. 1\u20137."},{"issue":"2","key":"10.1016\/j.heliyon.2019.e02538_bib26","doi-asserted-by":"crossref","first-page":"684","DOI":"10.1109\/TSG.2011.2178080","article-title":"Co-optimal placement of measurement devices and their related communication infrastructure in wide area measurement systems","volume":"3","author":"Shahraeini","year":"2012","journal-title":"IEEE Trans. Smart Grid"},{"key":"10.1016\/j.heliyon.2019.e02538_bib27","first-page":"1","article-title":"Optimal PMU placement considering controlled islanding of power system","author":"Huang","year":"2013","journal-title":"IEEE Trans. Power Syst."},{"key":"10.1016\/j.heliyon.2019.e02538_bib28","doi-asserted-by":"crossref","first-page":"35","DOI":"10.1016\/j.ijepes.2013.02.007","article-title":"Optimal PMU placement for power system state estimation with random component outages","volume":"51","author":"Tai","year":"2013","journal-title":"Int. J. Electr. Power Energy Syst."},{"issue":"1","key":"10.1016\/j.heliyon.2019.e02538_bib29","doi-asserted-by":"crossref","first-page":"43","DOI":"10.5539\/emr.v2n1p43","article-title":"Max covering phasor measurement units placement for partial power system observability","volume":"2","author":"Khiabani","year":"2013","journal-title":"Eng. Manag. Res."},{"issue":"1","key":"10.1016\/j.heliyon.2019.e02538_bib30","doi-asserted-by":"crossref","first-page":"121","DOI":"10.1049\/iet-gtd.2013.0251","article-title":"Reliability-based phasor measurement unit placement in power systems considering transmission line outages and channel limits","volume":"8","author":"Gomez","year":"2014","journal-title":"IET Gener. Transm. Distrib."},{"issue":"1","key":"10.1016\/j.heliyon.2019.e02538_bib31","doi-asserted-by":"crossref","first-page":"516","DOI":"10.1109\/TPWRS.2009.2036470","article-title":"Contingency-constrained PMU placement in power networks","volume":"25","author":"Aminifar","year":"2010","journal-title":"IEEE Trans. Power Syst."},{"issue":"4","key":"10.1016\/j.heliyon.2019.e02538_bib32","doi-asserted-by":"crossref","first-page":"589","DOI":"10.1002\/etep.1848","article-title":"An optimal PMU placement method for power system observability under various contingencies","volume":"25","author":"Abiri","year":"2015","journal-title":"Int. Trans. Electr. Energy Syst."},{"key":"10.1016\/j.heliyon.2019.e02538_bib33","series-title":"Optimal Phasor Measurement Unit Placement for Numerical Observability in the Presence of Conventional Measurements Using Semi- Definite Programming","first-page":"1","author":"Korres","year":"2015"},{"issue":"3","key":"10.1016\/j.heliyon.2019.e02538_bib34","first-page":"1521","article-title":"Optimal placement of phasor measurement units via Convex relaxation","volume":"27","author":"Kekatos","year":"2012"},{"issue":"1","key":"10.1016\/j.heliyon.2019.e02538_bib35","doi-asserted-by":"crossref","first-page":"174","DOI":"10.1109\/TSG.2011.2167163","article-title":"Optimal PMU placement by an equivalent linear formulation for exhaustive search","volume":"3","author":"Azizi","year":"2012","journal-title":"IEEE Trans. Smart Grid"},{"key":"10.1016\/j.heliyon.2019.e02538_bib36","first-page":"214","article-title":"\u201cGenetic algorithm for instrument placement in smart grid,\u201d 2013 World Congr","volume":"2013","author":"Khiabani","year":"2013","journal-title":"Nat. Biol. Inspired Comput. NaBIC"},{"key":"10.1016\/j.heliyon.2019.e02538_bib37","article-title":"Genetic algorithms for optimal of SID placement of phasor measurement units in electrical networks","author":"Marin FJ","year":"2003","journal-title":"Electron. Lett."},{"key":"10.1016\/j.heliyon.2019.e02538_bib38","doi-asserted-by":"crossref","first-page":"3033","DOI":"10.1109\/CDC.1990.203341","article-title":"Phasor measurement placement for voltage stability analysis of power systems","volume":"6","author":"Mili","year":"1990","journal-title":"29th IEEE Conf. Decis. Control"},{"issue":"4","key":"10.1016\/j.heliyon.2019.e02538_bib39","doi-asserted-by":"crossref","first-page":"223","DOI":"10.1016\/j.ijepes.2005.05.005","article-title":"Optimal PMU placement for full network observability using Tabu search algorithm","volume":"28","author":"Peng","year":"2006","journal-title":"Int. J. Electr. Power Energy Syst."},{"key":"10.1016\/j.heliyon.2019.e02538_bib40","doi-asserted-by":"crossref","DOI":"10.1016\/j.eswa.2010.12.025","article-title":"Optimal PMU placement for power system observability using binary particle swarm optimization and considering measurement redundancy","author":"Ahmadi A","year":"2011","journal-title":"Expert Syst. Appl."},{"key":"10.1016\/j.heliyon.2019.e02538_bib41","series-title":"Power System Restoration Issues","first-page":"19","author":"Adibi","year":"1991"},{"issue":"3","key":"10.1016\/j.heliyon.2019.e02538_bib42","doi-asserted-by":"crossref","first-page":"1525","DOI":"10.1109\/TPWRS.2008.926723","article-title":"Optimal placement of PMUs by integer linear programming","volume":"23","author":"Gou","year":"2008","journal-title":"IEEE Trans. Power Syst."},{"key":"10.1016\/j.heliyon.2019.e02538_bib43","series-title":"Teaching Learning Based Optimization","author":"Satapathy","year":"2016"},{"issue":"6","key":"10.1016\/j.heliyon.2019.e02538_bib44","doi-asserted-by":"crossref","first-page":"958","DOI":"10.1134\/S0030400X16060096","article-title":"Binary teaching-learning-based optimization algorithm is used to investigate the superscattering plasmonic nanodisk","volume":"120","author":"Kaboli","year":"2016","journal-title":"Opt. Spectr."},{"key":"10.1016\/j.heliyon.2019.e02538_bib45","series-title":"Networks: an Introduction","author":"Newman","year":"2010"},{"key":"10.1016\/j.heliyon.2019.e02538_bib46","doi-asserted-by":"crossref","first-page":"269","DOI":"10.1007\/BF01386390","article-title":"A\u00a0note on two problems in connection with graphs","volume":"1","author":"Dijkstra","year":"1959","journal-title":"J.\u00a0Numer. Math."},{"issue":"3","key":"10.1016\/j.heliyon.2019.e02538_bib47","first-page":"599","article-title":"\u201cDijkstra\u2019s algorithm revisited: the dynamic programming connection","volume":"35","author":"Sniedovich","year":"2006","journal-title":"J.\u00a0Control Cybern."},{"key":"10.1016\/j.heliyon.2019.e02538_bib48","article-title":"Real-time wide area measurements for adaptive protection and control","author":"DG Hart","year":"2000","journal-title":"Proc. Nat. Sci."},{"issue":"4","key":"10.1016\/j.heliyon.2019.e02538_bib49","doi-asserted-by":"crossref","first-page":"1091","DOI":"10.1093\/ietcom\/e89-b.4.1091","article-title":"Node-based genetic algorithm for communication spanning tree problem","volume":"E89\u2013B","author":"Lin","year":"2006","journal-title":"IEICE Trans. Commun."},{"key":"10.1016\/j.heliyon.2019.e02538_bib50","doi-asserted-by":"crossref","unstructured":"Kim JR, Lee JU, Jo JB, \u201cHierarchical spanning tree network design with Nash genetic algorithm,Comp. Indus. Eng.\u201d vol. ol. 56, no. 1040\u20131052, p. no. 3, pp.","DOI":"10.1016\/j.cie.2008.09.030"},{"key":"10.1016\/j.heliyon.2019.e02538_bib51","first-page":"77","article-title":"Real time application of synchophasors for improving reliability","volume":"Oct. 2010","year":"2010","journal-title":"NERC Rep"},{"key":"10.1016\/j.heliyon.2019.e02538_bib52","article-title":"PMU traffic shaping in IP-based wide area communication","author":"Chenine","year":"2010","journal-title":"2010 5th Int. Conf. Crit. Infrastructure, Cris 2010 - Proc."},{"issue":"1","key":"10.1016\/j.heliyon.2019.e02538_bib53","doi-asserted-by":"crossref","first-page":"73","DOI":"10.1145\/1269899.1254891","article-title":"Understanding network delay changes caused by routing events","volume":"35","author":"Pucha","year":"2007","journal-title":"ACM SIGMETRICS Perform. Eval. Rev."},{"key":"10.1016\/j.heliyon.2019.e02538_bib54","doi-asserted-by":"crossref","first-page":"1253","DOI":"10.1109\/49.35570","article-title":"Topology design and bandwidth allocation in ATM nets","author":"Gerla","year":"1989","journal-title":"EEE J. Sel. Areas Commun."},{"key":"10.1016\/j.heliyon.2019.e02538_bib55","series-title":"The Cable and Telecommunications Professionals","author":"Hill","year":"2008"},{"key":"10.1016\/j.heliyon.2019.e02538_bib56","series-title":"IEEE Standard for Synchrophasor Data Transfer for Power Systems, IEEE Std C37.118.2-2011 (Revision IEEE Std C37.118-2005)","first-page":"1","volume":"2011","author":"System","year":"2011"},{"key":"10.1016\/j.heliyon.2019.e02538_bib57","series-title":"Reliability Evaluation of Engineering Systems: Concepts and Techniques","first-page":"469","author":"Billinton","year":"1992"},{"issue":"1","key":"10.1016\/j.heliyon.2019.e02538_bib58","doi-asserted-by":"crossref","first-page":"206","DOI":"10.1109\/TSG.2010.2091431","article-title":"Comparison between communication infrastructures of centralized and decentralized wide area measurement systems","volume":"2","author":"Shahraeini","year":"2011","journal-title":"EEE Trans. Smart Grid"},{"key":"10.1016\/j.heliyon.2019.e02538_bib59","doi-asserted-by":"crossref","first-page":"1607","DOI":"10.1109\/ACCESS.2015.2389659","article-title":"Synchrophasor measurement technology in power systems: panorama and state-of-the-art","volume":"2","author":"Aminifar","year":"2014","journal-title":"IEEE Access"}],"container-title":["Heliyon"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S2405844019361985?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S2405844019361985?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2025,11,15]],"date-time":"2025-11-15T08:24:42Z","timestamp":1763195082000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S2405844019361985"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2019,10]]},"references-count":59,"journal-issue":{"issue":"10","published-print":{"date-parts":[[2019,10]]}},"alternative-id":["S2405844019361985"],"URL":"https:\/\/doi.org\/10.1016\/j.heliyon.2019.e02538","relation":{},"ISSN":["2405-8440"],"issn-type":[{"value":"2405-8440","type":"print"}],"subject":[],"published":{"date-parts":[[2019,10]]},"assertion":[{"value":"Elsevier","name":"publisher","label":"This article is maintained by"},{"value":"Optimal placement of phasor measurement units considering islanding contingency, communication infrastructure, and quality of service","name":"articletitle","label":"Article Title"},{"value":"Heliyon","name":"journaltitle","label":"Journal Title"},{"value":"https:\/\/doi.org\/10.1016\/j.heliyon.2019.e02538","name":"articlelink","label":"CrossRef DOI link to publisher maintained version"},{"value":"article","name":"content_type","label":"Content Type"},{"value":"\u00a9 2019 The Authors. Published by Elsevier Ltd.","name":"copyright","label":"Copyright"}],"article-number":"e02538"}}