{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,25]],"date-time":"2026-02-25T21:14:17Z","timestamp":1772054057329,"version":"3.50.1"},"reference-count":44,"publisher":"Elsevier BV","license":[{"start":{"date-parts":[[2019,1,1]],"date-time":"2019-01-01T00:00:00Z","timestamp":1546300800000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"}],"content-domain":{"domain":["elsevier.com","sciencedirect.com"],"crossmark-restriction":true},"short-container-title":["Journal of Building Engineering"],"published-print":{"date-parts":[[2019,1]]},"DOI":"10.1016\/j.jobe.2018.10.023","type":"journal-article","created":{"date-parts":[[2018,10,29]],"date-time":"2018-10-29T17:34:15Z","timestamp":1540834455000},"page":"173-185","update-policy":"https:\/\/doi.org\/10.1016\/elsevier_cm_policy","source":"Crossref","is-referenced-by-count":68,"special_numbering":"C","title":["Estimation of environmental emissions and impacts of building construction \u2013 A decision making tool for contractors"],"prefix":"10.1016","volume":"21","author":[{"given":"Malindu","family":"Sandanayake","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-3503-7431","authenticated-orcid":false,"given":"Guomin","family":"Zhang","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Sujeeva","family":"Setunge","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"78","reference":[{"issue":"2","key":"10.1016\/j.jobe.2018.10.023_bib1","doi-asserted-by":"crossref","first-page":"93","DOI":"10.1061\/(ASCE)1076-0342(2005)11:2(93)","article-title":"Comparison of environmental effects of steel-and concrete-framed buildings","volume":"11","author":"Guggemos","year":"2005","journal-title":"J. Infrastruct. Syst."},{"key":"10.1016\/j.jobe.2018.10.023_bib2","unstructured":"A. Alcorn, Embodied energy and CO coefficients for NZ building materials: The Centre, 2003."},{"issue":"18","key":"10.1016\/j.jobe.2018.10.023_bib3","doi-asserted-by":"crossref","first-page":"1840","DOI":"10.1016\/j.jclepro.2006.10.004","article-title":"Environmental impacts of building materials and building services components for commercial buildings in Hong Kong","volume":"15","author":"Chau","year":"2007","journal-title":"J. Clean. Prod."},{"issue":"0","key":"10.1016\/j.jobe.2018.10.023_bib4","doi-asserted-by":"crossref","first-page":"22","DOI":"10.1016\/j.resconrec.2012.01.001","article-title":"Assessment of CO2 emissions reduction in high-rise concrete office buildings using different material use options","volume":"61","author":"Chau","year":"2012","journal-title":"Resour. Conserv. Recycl."},{"issue":"1\u20134","key":"10.1016\/j.jobe.2018.10.023_bib5","doi-asserted-by":"crossref","first-page":"319","DOI":"10.1016\/0960-1481(96)88869-0","article-title":"Use of a hybrid energy analysis method for evaluating the embodied energy of building materials","volume":"8","author":"Alcorn","year":"1996","journal-title":"Renew. Energy"},{"issue":"3","key":"10.1016\/j.jobe.2018.10.023_bib6","doi-asserted-by":"crossref","first-page":"249","DOI":"10.1016\/j.enbuild.2006.07.001","article-title":"Energy use in the life cycle of conventional and low-energy buildings: a review article","volume":"39","author":"Sartori","year":"2007","journal-title":"Energy Build."},{"issue":"0","key":"10.1016\/j.jobe.2018.10.023_bib7","doi-asserted-by":"crossref","first-page":"379","DOI":"10.1016\/j.rser.2013.05.001","article-title":"Life cycle assessment in the construction sector: a review","volume":"26","author":"Buyle","year":"2013","journal-title":"Renew. Sustain. Energy Rev."},{"key":"10.1016\/j.jobe.2018.10.023_bib8","unstructured":"LEED, LEED for new construction. US Green Building Council, 2007."},{"key":"10.1016\/j.jobe.2018.10.023_bib9","unstructured":"Y. Roderick, et al. Comparison of energy performance assessment between LEED, BREEAM and Green Star. in Proceedings of the Eleventh International IBPSA Conference. Citeseer, 2009."},{"key":"10.1016\/j.jobe.2018.10.023_bib10","unstructured":"GBCA. Green Star [cited 2015 1\/06], 2015. Available from: \u3008http:\/\/www.gbca.org.au\/green-star\/\u3009."},{"key":"10.1016\/j.jobe.2018.10.023_bib11","series-title":"Environmental Impacts of On-site Construction Processes: Focus on Structural Frames","author":"Guggemos","year":"2003"},{"key":"10.1016\/j.jobe.2018.10.023_bib12","series-title":"Analysis of Environmental Impacts in the Construction Phase of Concrete Frame Buildings","author":"Chen","year":"2008"},{"issue":"3","key":"10.1016\/j.jobe.2018.10.023_bib13","doi-asserted-by":"crossref","first-page":"199","DOI":"10.1061\/(ASCE)IS.1943-555X.0000022","article-title":"Life-cycle assessment modeling of construction processes for buildings","volume":"16","author":"Bilec","year":"2009","journal-title":"J. Infrastruct. Syst."},{"key":"10.1016\/j.jobe.2018.10.023_bib14","doi-asserted-by":"crossref","first-page":"189","DOI":"10.1016\/j.buildenv.2015.09.002","article-title":"Environmental emissions at foundation construction stage of buildings \u2013 Two case studies","volume":"95","author":"Sandanayake","year":"2016","journal-title":"Build. Environ."},{"key":"10.1016\/j.jobe.2018.10.023_bib15","doi-asserted-by":"crossref","unstructured":"M. Sandanayake, et al., Environmental Emissions of Construction Equipment Usage in Pile Foundation Construction Process\u2014A Case Study, in Proceedings of the 19th International Symposium on Advancement of Construction Management and Real Estate, L. Shen, K. Ye, and C. Mao, Editors, Springer Berlin Heidelberg. p. 327-339.","DOI":"10.1007\/978-3-662-46994-1_28"},{"key":"10.1016\/j.jobe.2018.10.023_bib16","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/j.eiar.2017.09.003","article-title":"A comparative method of air emission impact assessment for building construction activities","volume":"68","author":"Sandanayake","year":"2018","journal-title":"Environ. Impact Assess. Rev."},{"key":"10.1016\/j.jobe.2018.10.023_bib17","doi-asserted-by":"crossref","first-page":"319","DOI":"10.1016\/j.jclepro.2017.03.041","article-title":"Estimation and comparison of environmental emissions and impacts at foundation and structure construction stages of a building \u2013 A case study","volume":"151","author":"Sandanayake","year":"2017","journal-title":"J. Clean. Prod."},{"key":"10.1016\/j.jobe.2018.10.023_bib18","doi-asserted-by":"crossref","DOI":"10.1016\/j.jenvman.2016.10.068","article-title":"Selection of emission factor standards for estimating emissions from diesel construction equipment in building construction in the Australian context","author":"Zhang","year":"2017","journal-title":"J. Environ. Manag."},{"key":"10.1016\/j.jobe.2018.10.023_bib19","doi-asserted-by":"crossref","first-page":"128","DOI":"10.1016\/j.enbuild.2016.05.007","article-title":"Models and method for estimation and comparison of direct emissions in building construction in Australia and a case study","volume":"126","author":"Sandanayake","year":"2016","journal-title":"Energy Build."},{"issue":"0","key":"10.1016\/j.jobe.2018.10.023_bib20","doi-asserted-by":"crossref","first-page":"165","DOI":"10.1016\/j.enbuild.2013.07.033","article-title":"Comparative study of greenhouse gas emissions between off-site prefabrication and conventional construction methods: two case studies of residential projects","volume":"66","author":"Mao","year":"2013","journal-title":"Energy Build."},{"issue":"4","key":"10.1016\/j.jobe.2018.10.023_bib21","doi-asserted-by":"crossref","first-page":"949","DOI":"10.1016\/j.buildenv.2009.09.014","article-title":"Greenhouse gas emissions in building construction: a case study of One Peking in Hong Kong","volume":"45","author":"Yan","year":"2010","journal-title":"Build. Environ."},{"issue":"4","key":"10.1016\/j.jobe.2018.10.023_bib22","doi-asserted-by":"crossref","first-page":"157","DOI":"10.1061\/(ASCE)1076-0342(2003)9:4(157)","article-title":"Life-cycle environmental effects of an office building","volume":"9","author":"Junnila","year":"2003","journal-title":"J. Infrastruct. Syst."},{"key":"10.1016\/j.jobe.2018.10.023_bib23","doi-asserted-by":"crossref","unstructured":"P. Forsythe, G. Ding, Greenhouse Gas Emissions from Excavation on Residential Construction Sites. 2014, 2014. 14(4): p. 10.","DOI":"10.5130\/AJCEB.v14i4.4195"},{"issue":"10","key":"10.1016\/j.jobe.2018.10.023_bib24","doi-asserted-by":"crossref","first-page":"1115","DOI":"10.1061\/(ASCE)0733-9364(2005)131:10(1115)","article-title":"Time-cost optimization of construction projects with generalized activity constraints","volume":"131","author":"Chassiakos","year":"2005","journal-title":"J. Constr. Eng. Manag."},{"key":"10.1016\/j.jobe.2018.10.023_bib25","series-title":"Construction Scheduling, Cost Optimization and Management","author":"Adeli","year":"2014"},{"issue":"2","key":"10.1016\/j.jobe.2018.10.023_bib26","doi-asserted-by":"crossref","first-page":"168","DOI":"10.1061\/(ASCE)0733-9364(2004)130:2(168)","article-title":"Applying a genetic algorithm-based multiobjective approach for time-cost optimization","volume":"130","author":"Zheng","year":"2004","journal-title":"J. Constr. Eng. Manag."},{"issue":"5","key":"10.1016\/j.jobe.2018.10.023_bib27","doi-asserted-by":"crossref","first-page":"570","DOI":"10.1061\/(ASCE)0733-9445(1998)124:5(570)","article-title":"Cost optimization of concrete structures","volume":"124","author":"Sarma","year":"1998","journal-title":"J. Struct. Eng."},{"key":"10.1016\/j.jobe.2018.10.023_bib28","unstructured":"P. Consultants, SimaPro software. Website: \u3008http:\/\/www\u3009. pre-sustainability. com\/simapro-lca-software (accessed December 2013), 2008."},{"issue":"2","key":"10.1016\/j.jobe.2018.10.023_bib29","doi-asserted-by":"crossref","first-page":"81","DOI":"10.1007\/BF02977842","article-title":"Using GaBi 3 to perform life cycle assessment and life cycle engineering","volume":"6","author":"Spatari","year":"2001","journal-title":"Int. J. Life Cycle Assess."},{"issue":"2","key":"10.1016\/j.jobe.2018.10.023_bib30","doi-asserted-by":"crossref","first-page":"76","DOI":"10.1007\/BF02977841","article-title":"Using BEES to select cost-effective green products","volume":"6","author":"Lippiatt","year":"2001","journal-title":"Int. J. Life Cycle Assess."},{"key":"10.1016\/j.jobe.2018.10.023_bib31","unstructured":"Envest, 2017."},{"key":"10.1016\/j.jobe.2018.10.023_bib32","unstructured":"C. Eldridge, Lcaid\u2122 Software: Measuring Environmental Performance of Buildings. in Proceedings of the 9th International Conference on Durability of Building Materials and Components, 2002."},{"issue":"1","key":"10.1016\/j.jobe.2018.10.023_bib33","doi-asserted-by":"crossref","first-page":"10","DOI":"10.1061\/(ASCE)1076-0342(2006)12:1(10)","article-title":"Life-cycle assessment of office buildings in Europe and the United States","volume":"12","author":"Junnila","year":"2006","journal-title":"J. Infrastruct. Syst."},{"key":"10.1016\/j.jobe.2018.10.023_bib34","unstructured":"G.P. Hammond, C.I. Jones. ICE database. [cited 2015 24\/06], 2011. Available from: \u3008http:\/\/www.ecocem.ie\/downloads\/Inventory_of_Carbon_and_Energy.pdf\u3009."},{"key":"10.1016\/j.jobe.2018.10.023_bib35","unstructured":"M.M. Bilec, K.J. Ketchman, Greenhouse Gas Inventory of University of Pittsburgh for FY 2011. 2013."},{"issue":"2","key":"10.1016\/j.jobe.2018.10.023_bib36","doi-asserted-by":"crossref","first-page":"51","DOI":"10.1061\/(ASCE)EI.1943-5541.0000053","article-title":"Intelligent sustainable design: integration of carbon accounting and building information modeling","volume":"137","author":"Stadel","year":"2011","journal-title":"J. Prof. Issues Eng. Educ. Pract."},{"issue":"1","key":"10.1016\/j.jobe.2018.10.023_bib37","doi-asserted-by":"crossref","first-page":"24","DOI":"10.1061\/(ASCE)CO.1943-7862.0000560","article-title":"Building information modeling in support of sustainable design and construction","volume":"139","author":"Bynum","year":"2012","journal-title":"J. Constr. Eng. Manag."},{"key":"10.1016\/j.jobe.2018.10.023_bib38","doi-asserted-by":"crossref","first-page":"156","DOI":"10.1016\/j.autcon.2015.06.003","article-title":"Enhancing environmental sustainability over building life cycles through green BIM: a review","volume":"57","author":"Wong","year":"2015","journal-title":"Autom. Constr."},{"key":"10.1016\/j.jobe.2018.10.023_bib39","series-title":"Green BIM: Successful Sustainable Design with Building Information Modeling","author":"Krygiel","year":"2008"},{"key":"10.1016\/j.jobe.2018.10.023_bib40","unstructured":"G. Zhang, M. Sandanayake, Analysis of emissions reduction options in building construction by various resource optimisation\u2013two Australian case studies. in Proceedings of the 3rd International Conference on Civil and Architectural Engineering, 18th-19th January 2017, Bangkok, Thailand. Innovative Research Publication, 2017."},{"key":"10.1016\/j.jobe.2018.10.023_bib41","unstructured":"USEPA, Crankcase Emission Factors for Non-Road Engine Modeling-Compression-Ignition, in Environmental Protection Agency. Air and Radiation Office. USA., Office of Transportation and Air Quality, 2010."},{"key":"10.1016\/j.jobe.2018.10.023_bib42","unstructured":"AGGA. Australian National Greenhouse Gas accounts., 2013. Available from: \u3008http:\/\/www.climatechange.gov.au\/\u3009."},{"key":"10.1016\/j.jobe.2018.10.023_bib43","unstructured":"M. Goedkoop, et al., ReCiPe 2008. A life cycle impact assessment method which comprises harmonised category indicators at the midpoint and the endpoint level. 1, 2009."},{"key":"10.1016\/j.jobe.2018.10.023_bib44","unstructured":"J.C. Bare, TRACI 2. 2011."}],"container-title":["Journal of Building Engineering"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S235271021830247X?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S235271021830247X?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2020,11,14]],"date-time":"2020-11-14T07:36:45Z","timestamp":1605339405000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S235271021830247X"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2019,1]]},"references-count":44,"alternative-id":["S235271021830247X"],"URL":"https:\/\/doi.org\/10.1016\/j.jobe.2018.10.023","relation":{},"ISSN":["2352-7102"],"issn-type":[{"value":"2352-7102","type":"print"}],"subject":[],"published":{"date-parts":[[2019,1]]},"assertion":[{"value":"Elsevier","name":"publisher","label":"This article is maintained by"},{"value":"Estimation of environmental emissions and impacts of building construction \u2013 A decision making tool for contractors","name":"articletitle","label":"Article Title"},{"value":"Journal of Building Engineering","name":"journaltitle","label":"Journal Title"},{"value":"https:\/\/doi.org\/10.1016\/j.jobe.2018.10.023","name":"articlelink","label":"CrossRef DOI link to publisher maintained version"},{"value":"article","name":"content_type","label":"Content Type"},{"value":"Crown Copyright \u00a9 2018 Published by Elsevier Ltd. All rights reserved.","name":"copyright","label":"Copyright"}]}}