{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,10,25]],"date-time":"2026-10-25T00:38:03Z","timestamp":1792888683379,"version":"4.5.0"},"reference-count":8,"publisher":"Elsevier BV","license":[{"start":{"date-parts":[[2015,1,1]],"date-time":"2015-01-01T00:00:00Z","timestamp":1420070400000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"},{"start":{"date-parts":[[2015,6,26]],"date-time":"2015-06-26T00:00:00Z","timestamp":1435276800000},"content-version":"vor","delay-in-days":176,"URL":"http:\/\/creativecommons.org\/licenses\/by-nc-nd\/4.0\/"}],"content-domain":{"domain":["elsevier.com","sciencedirect.com"],"crossmark-restriction":true},"short-container-title":["Procedia Engineering"],"published-print":{"date-parts":[[2015]]},"DOI":"10.1016\/j.proeng.2015.06.162","type":"journal-article","created":{"date-parts":[[2015,7,9]],"date-time":"2015-07-09T07:08:02Z","timestamp":1436425682000},"page":"387-393","update-policy":"https:\/\/doi.org\/10.1016\/elsevier_cm_policy","source":"Crossref","is-referenced-by-count":9,"special_numbering":"C","title":["Methodology of Cost Parameter Estimation for Modern Methods of Construction Based on Wood"],"prefix":"10.1016","volume":"108","author":[{"given":"M\u00e1ria","family":"Kozlovsk\u00e1","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Zuzana","family":"Strukov\u00e1","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Pavol","family":"Kaleja","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"78","reference":[{"key":"10.1016\/j.proeng.2015.06.162_bib0005","unstructured":"Engstrom, S., Stehn, L., Sarden, Y. Competitive impact of industrialised building \u2013 in search for explanations to the current state. In: Proceeding of the 25th Annual ARCOM Conference, Nottingham, UK, Association of Researchers in Construction Management; 2009, p. 413-424."},{"key":"10.1016\/j.proeng.2015.06.162_bib0010","doi-asserted-by":"crossref","first-page":"146","DOI":"10.1080\/09613210302000","article-title":"Re-engineering through pre-assembly: client expectations and drivers","volume":"31","author":"Gibb","year":"2003","journal-title":"Building Research and Information"},{"key":"10.1016\/j.proeng.2015.06.162_bib0015","doi-asserted-by":"crossref","first-page":"121","DOI":"10.1080\/01446190500184444","article-title":"Benefit evaluation for off-site production in construction","volume":"24","author":"Blismas","year":"2006","journal-title":"Construction Management and Economics"},{"key":"10.1016\/j.proeng.2015.06.162_bib0020","doi-asserted-by":"crossref","first-page":"233","DOI":"10.1080\/17452007.2005.9684595","article-title":"Perceptions of Precast Concrete Cladding in the UK Market","volume":"1","author":"Glass","year":"2006","journal-title":"Journal of architectural engineering and design management"},{"key":"10.1016\/j.proeng.2015.06.162_bib0025","doi-asserted-by":"crossref","first-page":"1896","DOI":"10.1016\/j.renene.2008.12.015","article-title":"The study on the carbon dioxide sequestration by applying wooden structure on eco-technological and leisure facilities","volume":"34","author":"Huang","year":"2009","journal-title":"Renewable Energy"},{"key":"10.1016\/j.proeng.2015.06.162_bib0030","first-page":"5","article-title":"Modern wood construction architecture and its possibilities in China","volume":"3","author":"Liu","year":"2005","journal-title":"Jiangsu Architecture"},{"key":"10.1016\/j.proeng.2015.06.162_bib0035","unstructured":"Roos, A., Woxblom, L., McCluskey, D. Architects\u2019, and Building Engineers, and Stakeholders\u2019 Perceptions to Wood in Construction \u2013 Results from a Qualitative Study. In: Berg seng E., Belbeck G, and Hoen H., editors. Proceedings of the biennal meeting of the Scandinavian Society of Forest Economics, Lom, Norway: Scandinavian Forest Economic; 2008, p. 184-194."},{"key":"10.1016\/j.proeng.2015.06.162_bib0040","first-page":"3","article-title":"Introduction to Cross Laminated Timber","volume":"22","author":"Gagnon","year":"2012","journal-title":"Wood Design Focus"}],"container-title":["Procedia Engineering"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S1877705815011169?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S1877705815011169?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2018,9,20]],"date-time":"2018-09-20T21:59:23Z","timestamp":1537480763000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S1877705815011169"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2015]]},"references-count":8,"alternative-id":["S1877705815011169"],"URL":"https:\/\/doi.org\/10.1016\/j.proeng.2015.06.162","relation":{},"ISSN":["1877-7058"],"issn-type":[{"value":"1877-7058","type":"print"}],"subject":[],"published":{"date-parts":[[2015]]},"assertion":[{"value":"Elsevier","name":"publisher","label":"This article is maintained by"},{"value":"Methodology of Cost Parameter Estimation for Modern Methods of Construction Based on Wood","name":"articletitle","label":"Article Title"},{"value":"Procedia Engineering","name":"journaltitle","label":"Journal Title"},{"value":"https:\/\/doi.org\/10.1016\/j.proeng.2015.06.162","name":"articlelink","label":"CrossRef DOI link to publisher maintained version"},{"value":"article","name":"content_type","label":"Content Type"},{"value":"Copyright \u00a9 2015 The Authors. Published by Elsevier Ltd.","name":"copyright","label":"Copyright"}]}}