{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,10,25]],"date-time":"2026-10-25T00:38:03Z","timestamp":1792888683385,"version":"4.5.0"},"reference-count":15,"publisher":"Elsevier BV","license":[{"start":{"date-parts":[[2012,1,1]],"date-time":"2012-01-01T00:00:00Z","timestamp":1325376000000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"},{"start":{"date-parts":[[2013,7,16]],"date-time":"2013-07-16T00:00:00Z","timestamp":1373932800000},"content-version":"vor","delay-in-days":562,"URL":"http:\/\/creativecommons.org\/licenses\/by-nc-nd\/3.0\/"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Procedia - Social and Behavioral Sciences"],"published-print":{"date-parts":[[2012]]},"DOI":"10.1016\/j.sbspro.2012.02.138","type":"journal-article","created":{"date-parts":[[2012,4,10]],"date-time":"2012-04-10T03:37:03Z","timestamp":1334029023000},"page":"689-696","source":"Crossref","is-referenced-by-count":45,"special_numbering":"C","title":["Factors Influencing the Construction Cost of Industrialised Building System (IBS) Projects"],"prefix":"10.1016","volume":"35","author":[{"given":"Nor Azmi Ahmad","family":"Bari","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Rosnah","family":"Yusuff","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Napsiah","family":"Ismail","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Aini","family":"Jaapar","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Rizan","family":"Ahmad","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"78","reference":[{"key":"10.1016\/j.sbspro.2012.02.138_bib0005","unstructured":"Abd Shukor, A.S., Mohammad, M.F., Mahbub,R. And Ismail, F., (2011), Supply Chain Integration in Industrialised Building System in the Malaysian Construction Industry, The Built Environment Review, Vol. 4, Special Issue 1."},{"key":"10.1016\/j.sbspro.2012.02.138_bib0010","unstructured":"Ashworth, A., (1995). Cost Studies of Building, Second Edition, Longman Scientific and Technical, Harlow."},{"key":"10.1016\/j.sbspro.2012.02.138_bib0015","unstructured":"Bubshait A.A. and Al-Juwairah, Y.A. (2002), Factors Contributing to Construction Costs in Saudi Arabia, Cost Engineering, Vol. 44(5), pp. 30-34."},{"key":"10.1016\/j.sbspro.2012.02.138_bib0020","unstructured":"Chan, S.L. and Park M., (2005), Project Cost Estimation Using Principal Component Regression, Construction, Management & Economics, Vol. 23 (3), pp 295-304."},{"key":"10.1016\/j.sbspro.2012.02.138_bib0025","doi-asserted-by":"crossref","unstructured":"Chan, D.W.M. and Kumaraswamy,M.M. (1997). A Comparative Study of Causes of Time Overruns in Hong Kong Construction Projects, International Journal of Project Management, Vol. 15(1), pp. 55-63.","DOI":"10.1016\/S0263-7863(96)00039-7"},{"key":"10.1016\/j.sbspro.2012.02.138_bib0030","doi-asserted-by":"crossref","unstructured":"Eastman, C.M. (2008), Relative Productivity in the AEC Industries in the United States for on-site Activities, Journal of Construction Engineering and Management, Vol. 134 (7), pp. 517-526.","DOI":"10.1061\/(ASCE)0733-9364(2008)134:7(517)"},{"key":"10.1016\/j.sbspro.2012.02.138_bib0035","unstructured":"Egan, J. (1998), Rethinking Construction: The Report of the Construction Task Force, Department of Transport and Regions (DETR), UK, London."},{"key":"10.1016\/j.sbspro.2012.02.138_bib0040","doi-asserted-by":"crossref","unstructured":"Elhag, T.M.S., Boussabaine, A.H., and Ballal, T.M.A., (2005). Critical Determinants of construction tendering costs: Quantity Surveyor's standpoint. International Journal of Project Management, Vol. 23, pp. 538-545.","DOI":"10.1016\/j.ijproman.2005.04.002"},{"key":"10.1016\/j.sbspro.2012.02.138_bib0045","doi-asserted-by":"crossref","unstructured":"Kaming, P.F., Olomolaiye,P.O., Holt,G.D., and Harris,F.C., (1997).Factors Influencing Construction Time and Cost Overrun on High-rise Projects in Indonesia, Construction Management and Economics, Vol. 15, pp. 83-94.","DOI":"10.1080\/014461997373132"},{"key":"10.1016\/j.sbspro.2012.02.138_bib0050","doi-asserted-by":"crossref","unstructured":"Karshenas, S., (1984) Pre-design Cost Estimating Method for Multistory Buildings, Journal of Construction Engineering and Management, Vol. 110 (1), pp. 79-86.","DOI":"10.1061\/(ASCE)0733-9364(1984)110:1(79)"},{"key":"10.1016\/j.sbspro.2012.02.138_bib0055","unstructured":"Memon, A.H., Abdul Rahman, I., Abdullah, M.R., and Abdu Azis, A.A. (2010), Factors Affecting Construction Cost in Mara Large Construction Project: Perspective of Project Management Consultant, International Journal of Sustainable Construction Engineering & Technology, Vol. 1 (2), pp. 41-54."},{"key":"10.1016\/j.sbspro.2012.02.138_bib0060","doi-asserted-by":"crossref","unstructured":"Seeley, I.H., (1996). Building Economics. Fourth Edition, Macmillan Building and Surveying Series, London.","DOI":"10.1007\/978-1-349-13757-2"},{"key":"10.1016\/j.sbspro.2012.02.138_bib0065","doi-asserted-by":"crossref","unstructured":"Stoy, C. and Schalcher, H.R. (2007) Residential Building Projects: Building Cost Indicators and Drivers, Journal of Construction Engineering and Management, Vol. 133 (2), pp. 139-145.","DOI":"10.1061\/(ASCE)0733-9364(2007)133:2(139)"},{"key":"10.1016\/j.sbspro.2012.02.138_bib0070","doi-asserted-by":"crossref","unstructured":"Sonmez, R., (2004). Conceptual Cost Estimation of Building Projects with Regression Analysis and Neural Networks. Canadian Journal of Civil Engineering, Vol. 31, pp. 677-683.","DOI":"10.1139\/l04-029"},{"key":"10.1016\/j.sbspro.2012.02.138_bib0075","doi-asserted-by":"crossref","unstructured":"Xiao, H. and Proverbs, D. (2002). The Performance of Contractors in Japan, the UK and the USA: A Comparative Evaluation of Construction Cost. Construction Management and Economics, Vol. 22, pp. 425-435.","DOI":"10.1080\/01446190210145859"}],"container-title":["Procedia - Social and Behavioral Sciences"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S1877042812004508?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S1877042812004508?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2018,11,24]],"date-time":"2018-11-24T06:52:15Z","timestamp":1543042335000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S1877042812004508"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2012]]},"references-count":15,"alternative-id":["S1877042812004508"],"URL":"https:\/\/doi.org\/10.1016\/j.sbspro.2012.02.138","relation":{},"ISSN":["1877-0428"],"issn-type":[{"value":"1877-0428","type":"print"}],"subject":[],"published":{"date-parts":[[2012]]}}}