{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,6,5]],"date-time":"2026-06-05T22:07:13Z","timestamp":1780697233386,"version":"3.54.1"},"reference-count":21,"publisher":"Elsevier BV","issue":"3","license":[{"start":{"date-parts":[[2004,5,1]],"date-time":"2004-05-01T00:00:00Z","timestamp":1083369600000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Tunnelling and Underground Space Technology"],"published-print":{"date-parts":[[2004,5]]},"DOI":"10.1016\/j.tust.2004.01.001","type":"journal-article","created":{"date-parts":[[2004,2,14]],"date-time":"2004-02-14T05:28:31Z","timestamp":1076736511000},"page":"217-237","source":"Crossref","is-referenced-by-count":255,"title":["Guidelines for tunnelling risk management: International Tunnelling Association, Working Group No. 2"],"prefix":"10.1016","volume":"19","author":[{"given":"S\u00f8ren","family":"Degn Eskesen","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Per","family":"Tengborg","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"J\u00f8rgen","family":"Kampmann","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Trine","family":"Holst Veicherts","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"78","reference":[{"key":"10.1016\/j.tust.2004.01.001_BIB1","article-title":"Probability concepts in engineering planning and design","volume":"vol. II","author":"Ang","year":"1984"},{"key":"10.1016\/j.tust.2004.01.001_BIB2","unstructured":"The Engineering Council, 1993. Guidelines on Risk Issues. London, ISBN 0-9516611-7-5"},{"key":"10.1016\/j.tust.2004.01.001_BIB3","series-title":"Probability, Statistics and Decision for Civil Engineers","author":"Benjamin","year":"1970"},{"key":"10.1016\/j.tust.2004.01.001_BIB4","unstructured":"Crystal Ball \u2013 User manual, Decisioneering Inc"},{"issue":"4","key":"10.1016\/j.tust.2004.01.001_BIB5","doi-asserted-by":"crossref","first-page":"814","DOI":"10.1061\/(ASCE)0733-9364(1992)118:4(814)","article-title":"Risk analysis approach to selection of contractor, Evaluation Method","volume":"118","author":"Jaselskis","year":"1992","journal-title":"Journal of construction Engineering and Management"},{"key":"10.1016\/j.tust.2004.01.001_BIB6","doi-asserted-by":"crossref","unstructured":"Lichtenberg, S., 1989. The Successive Principle \u2013 a New Decision Tool for the Conception Phase, Proceedings. Project Management Institute\/INTERNET Symposium, Atlanta","DOI":"10.1016\/0263-7863(89)90054-9"},{"key":"10.1016\/j.tust.2004.01.001_BIB7","series-title":"Proactive Management of Uncertainty Using the Successive Principle","author":"Lichtenberg","year":"2000"},{"key":"10.1016\/j.tust.2004.01.001_BIB8","unstructured":"Sturk, R., 1998. Engineering geological information \u2013 Its value and impact on tunnelling. Doctoral Thesis at Royal Institute of Technology, Stockholm"},{"key":"10.1016\/j.tust.2004.01.001_FR1","unstructured":"Bielecki, R., 1998. The safety concept for construction of the 4th tube of the Elbe Tunnel in Hamburg. In: Russian Tunnelling Society: Underground City; Geotechnology and Architecture. Conference September 8\u201310, 1998, St. Petersburg, pp. 82\u201389"},{"issue":"2","key":"10.1016\/j.tust.2004.01.001_FR2","doi-asserted-by":"crossref","first-page":"141","DOI":"10.1016\/0886-7798(96)00014-4","article-title":"Risk and risk analysis in rock engineering","volume":"11","author":"Einstein","year":"1996","journal-title":"Tunnelling and Underground Space Technology"},{"key":"10.1016\/j.tust.2004.01.001_FR3","unstructured":"Eskesen S.D., Kampmann J., 2000. Risk reduction strategy in urban tunnelling: experience from the Copenhagen Metro. In: ITA World Tunnel Congress, Tunnels under Pressure, Durban, 2000"},{"key":"10.1016\/j.tust.2004.01.001_FR4","unstructured":"Godfrey, P.S., 1996. Control of Risk \u2013 A Guide to the Systematic Management of Risk from Construction. Construction Industry Research and Information Association, CIRIA"},{"key":"10.1016\/j.tust.2004.01.001_FR5","unstructured":"Holst Olsen, T., Lauritzen, E.K., Holm, N., Ladefoged, L., 1997. Practical risk management in construction \u2013 experiences from the \u00d8resund fixed link, Danish Landworks, Society for Risk Analysis \u2013 Europe Conference, New Risk Frontiers, Stockholm"},{"key":"10.1016\/j.tust.2004.01.001_FR6","unstructured":"Isaksson, M.T., Reilly, J.J., Anderson, J.M., 1999. Risk mitigation for tunnel projects \u2013 A structured approach. In: Alten, et al., (Eds.), Proceedings Challenges for the 21st Century. Balkema, Rotterdam"},{"key":"10.1016\/j.tust.2004.01.001_FR7","unstructured":"Kampmann, J., Eskesen, S.D., Summers, J.W., 1998. Risk assessment helps select the contractor for the Copenhagen Metro System. In:d ITA World Tunnel Congress, Tunnels and Metropolises, Sao Paulo, Balkema"},{"issue":"1","key":"10.1016\/j.tust.2004.01.001_FR8","doi-asserted-by":"crossref","first-page":"31","DOI":"10.1016\/S0886-7798(00)00026-2","article-title":"The management process for complex underground and tunnelling projects","volume":"15","author":"Reilly","year":"2000","journal-title":"Tunnelling and Underground Space Technology"},{"key":"10.1016\/j.tust.2004.01.001_FR9","unstructured":"Norwegian Tunnelling Society, 1992. ITA Recommendations of Contractual Sharing of Risks. second ed., March, 1992"},{"key":"10.1016\/j.tust.2004.01.001_FR10","unstructured":"Smith, D.J., 1997. Reliability Maintainability and Risk. Butterworth Heinemann, Donald Lamont, ISBN0 07506 37528"},{"key":"10.1016\/j.tust.2004.01.001_FR11","unstructured":"Stille, H., Sturk, R., Olsson, L., 1998. Quality systems and risk analysis \u2013 New philosophies in underground construction industry. In: Franz\u00e9n, T., Bergdahl, S.-G., Nordmark, A., (Eds.), Proc. Underground Construction in Modern Infrastructure, Stockholm, June 1998. Rotterdam, Balkema"},{"key":"10.1016\/j.tust.2004.01.001_FR12","unstructured":"Tengborg, P., Olsson, L., Johansson, J., Brantmark, J., 1998. System analysis of the Hvalfj\u00f6rdur tunnel. In: Franz\u00e9n, T., Bergdahl, S.-G., Nordmark, A., (Eds.), Proc. Underground Construction in Modern Infrastructure, Stockholm, June 1998. Rotterdam, Balkema"},{"issue":"1","key":"10.1016\/j.tust.2004.01.001_FR13","doi-asserted-by":"crossref","first-page":"33","DOI":"10.1016\/S0886-7798(02)00002-0","article-title":"Multiobjective optimization under uncertainty in tunnelling: application to the design of tunnel support\/reinforcement with case histories","volume":"17","author":"Tonon","year":"2002","journal-title":"Tunnelling and Underground Space Technology"}],"container-title":["Tunnelling and Underground Space Technology"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0886779804000021?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0886779804000021?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2019,2,14]],"date-time":"2019-02-14T22:20:17Z","timestamp":1550182817000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S0886779804000021"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2004,5]]},"references-count":21,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2004,5]]}},"alternative-id":["S0886779804000021"],"URL":"https:\/\/doi.org\/10.1016\/j.tust.2004.01.001","relation":{},"ISSN":["0886-7798"],"issn-type":[{"value":"0886-7798","type":"print"}],"subject":[],"published":{"date-parts":[[2004,5]]}}}