{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,25]],"date-time":"2026-03-25T07:02:25Z","timestamp":1774422145096,"version":"3.50.1"},"reference-count":22,"publisher":"Elsevier BV","issue":"3","license":[{"start":{"date-parts":[[2006,1,1]],"date-time":"2006-01-01T00:00:00Z","timestamp":1136073600000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"},{"start":{"date-parts":[[2006,1,1]],"date-time":"2006-01-01T00:00:00Z","timestamp":1136073600000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/legal\/tdmrep-license"}],"content-domain":{"domain":["elsevier.com","sciencedirect.com"],"crossmark-restriction":true},"short-container-title":["IFAC Proceedings Volumes"],"published-print":{"date-parts":[[2006]]},"DOI":"10.3182\/20060517-3-fr-2903.00216","type":"journal-article","created":{"date-parts":[[2010,9,1]],"date-time":"2010-09-01T12:47:31Z","timestamp":1283345251000},"page":"407-412","update-policy":"https:\/\/doi.org\/10.1016\/elsevier_cm_policy","source":"Crossref","is-referenced-by-count":0,"title":["WELD REALLOCATION IN AN AUTOMOTIVE ROBOTIC LINE DUE TO ROBOTS\u2019 FAILURES"],"prefix":"10.3182","volume":"39","author":[{"given":"Tomer","family":"Kahan","sequence":"first","affiliation":[]},{"given":"Yossi","family":"Bukchin","sequence":"additional","affiliation":[]},{"given":"Roland","family":"Menassa","sequence":"additional","affiliation":[]},{"given":"Irad","family":"Ben-Gal","sequence":"additional","affiliation":[]}],"member":"78","reference":[{"key":"10.3182\/20060517-3-FR-2903.00216_bib1","first-page":"4","article-title":"COMSOAL: A computer method of sequencing operations for assembly lines","author":"Arcus","year":"1966","journal-title":"International Journal of Production Research"},{"key":"10.3182\/20060517-3-FR-2903.00216_bib2","doi-asserted-by":"crossref","first-page":"666","DOI":"10.1016\/j.ejor.2004.07.022","article-title":"State-of-the-art exact and heuristic solution procedures for simple assembly line balancing","volume":"168","author":"Becker","year":"2006","journal-title":"European Journal of Operational Research"},{"key":"10.3182\/20060517-3-FR-2903.00216_bib3","doi-asserted-by":"crossref","first-page":"694","DOI":"10.1016\/j.ejor.2004.07.023","article-title":"A survey on problems and methods in generalized assembly line balancing","volume":"168","author":"Becker","year":"2006","journal-title":"European Journal of Operational Research"},{"key":"10.3182\/20060517-3-FR-2903.00216_bib4","doi-asserted-by":"crossref","first-page":"2703","DOI":"10.1080\/002075499190482","article-title":"Probabilistic sequential methodology for designing a factorial system with multiple responses","volume":"37","author":"Ben-Gal","year":"1999","journal-title":"International Journal of Production Research"},{"key":"10.3182\/20060517-3-FR-2903.00216_bib5","doi-asserted-by":"crossref","first-page":"405","DOI":"10.1016\/S0360-8352(01)00065-1","article-title":"Mixed model assembly line design in a make-to-order environment","volume":"41","author":"Bukchin","year":"2002","journal-title":"Computers & Industrial Engineering"},{"key":"10.3182\/20060517-3-FR-2903.00216_bib6","doi-asserted-by":"crossref","DOI":"10.1016\/j.ejor.2005.01.055","article-title":"\u201cA branch-and-bound based solution approach for the mixed-model assembly line-balancing problem for minimizing stations and task duplication costs\u201d. To appear in","author":"Bukchin","year":"2006","journal-title":"European Journal of Operational Research"},{"key":"10.3182\/20060517-3-FR-2903.00216_bib7","doi-asserted-by":"crossref","first-page":"73","DOI":"10.1080\/07408170304429","article-title":"A weighted approach for assembly line design with station paralleling and equipment selection","volume":"35","author":"Bukchin","year":"2003","journal-title":"IIE Transactions"},{"key":"10.3182\/20060517-3-FR-2903.00216_bib8","doi-asserted-by":"crossref","first-page":"585","DOI":"10.1080\/07408170008967418","article-title":"Design of flexible assembly line to minimize equipment cost","volume":"32","author":"Bukchin","year":"2000","journal-title":"IIE Transactions"},{"key":"10.3182\/20060517-3-FR-2903.00216_bib9","doi-asserted-by":"crossref","first-page":"87","DOI":"10.1023\/B:JIMS.0000010077.27141.be","article-title":"A comprehensive survey and future trend of simulation study on FMS simulation","volume":"15","author":"Chan","year":"2004","journal-title":"Journal of Intelligent Manufacturing"},{"key":"10.3182\/20060517-3-FR-2903.00216_bib10","first-page":"763","volume":"40","author":"Chandra","year":"2002","journal-title":"Optimization based parts-machines matching in flexible manufacturing systems. International Journal of Production Research"},{"key":"10.3182\/20060517-3-FR-2903.00216_bib11","series-title":"Manufacturing Systems Engineering","author":"Gershwin","year":"1994"},{"key":"10.3182\/20060517-3-FR-2903.00216_bib12","unstructured":"Graves, G. (1993). Balancing for material flow. In: Proceeding of the Material Handling Institute, Working Paper, 1993."},{"key":"10.3182\/20060517-3-FR-2903.00216_bib13","article-title":"Throughput of multiple part-type systems: A subjective linear measure. To appear in","author":"Herbon","year":"2006","journal-title":"The International Journal for Manufacturing Science and Production"},{"key":"10.3182\/20060517-3-FR-2903.00216_bib14","series-title":"Scheduling flexible machining systems when machines are prone to fFailure","author":"Hildebrant","year":"1980"},{"key":"10.3182\/20060517-3-FR-2903.00216_bib15","doi-asserted-by":"crossref","unstructured":"Hildebrant, R.R., (1980b). Scheduling flexible machining systems using mean value analysis. In: Proceeding of the 19th IEEE Conference on Decision and Control, Albuquerque, New Mexico, pp. 701-706.","DOI":"10.1109\/CDC.1980.271892"},{"key":"10.3182\/20060517-3-FR-2903.00216_bib16","doi-asserted-by":"crossref","first-page":"518","DOI":"10.1287\/opre.5.4.518","article-title":"Networks of waiting lines","volume":"5","author":"Jackson","year":"1957","journal-title":"Operations Research"},{"key":"10.3182\/20060517-3-FR-2903.00216_bib17","unstructured":"Kahan, T., Bukchin, Y., Menassa, R. and Ben-Gal. I., (2006). Backup strategy for robots\u2019 failures in An automotive assembly system, Working paper, Dept. of Industrial engineering, Tel-Aviv University."},{"key":"10.3182\/20060517-3-FR-2903.00216_bib18","doi-asserted-by":"crossref","first-page":"299","DOI":"10.1080\/00207549308956726","article-title":"A new classification scheme for flexible manufacturing systems","volume":"31","author":"Maccarthy","year":"1993","journal-title":"International Journal of Production Research"},{"key":"10.3182\/20060517-3-FR-2903.00216_bib19","series-title":"Scheduling - theory, algorithms, and systems","author":"Pinedo","year":"1995"},{"key":"10.3182\/20060517-3-FR-2903.00216_bib20","doi-asserted-by":"crossref","first-page":"127","DOI":"10.1023\/A:1010091220143","article-title":"The Cross-Entropy for combinatorial and continuous optimisation","volume":"1","author":"Rubinstein","year":"1999","journal-title":"Methodology and Computing in Applied Probability"},{"key":"10.3182\/20060517-3-FR-2903.00216_bib21","doi-asserted-by":"crossref","first-page":"593","DOI":"10.1287\/mnsc.16.9.593","article-title":"Mixed model line balancing with smoothed station assignments","volume":"16","author":"Thomopoulos","year":"1970","journal-title":"Management Science"},{"key":"10.3182\/20060517-3-FR-2903.00216_bib22","doi-asserted-by":"crossref","first-page":"B59","DOI":"10.1287\/mnsc.14.2.B59","article-title":"Line balancing - sequencing for mixed-model assembly","volume":"14","author":"Thomopoulos","year":"1967","journal-title":"Management Science"}],"container-title":["IFAC Proceedings Volumes"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S147466701535936X?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S147466701535936X?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2025,10,26]],"date-time":"2025-10-26T10:59:13Z","timestamp":1761476353000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S147466701535936X"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2006]]},"references-count":22,"aliases":["10.1016\/b978-008044654-7\/50201-6"],"journal-issue":{"issue":"3","published-print":{"date-parts":[[2006]]}},"alternative-id":["S147466701535936X"],"URL":"https:\/\/doi.org\/10.3182\/20060517-3-fr-2903.00216","relation":{},"ISSN":["1474-6670"],"issn-type":[{"value":"1474-6670","type":"print"}],"subject":[],"published":{"date-parts":[[2006]]},"assertion":[{"value":"Elsevier","name":"publisher","label":"This article is maintained by"},{"value":"WELD REALLOCATION IN AN AUTOMOTIVE ROBOTIC LINE DUE TO ROBOTS\u2019 FAILURES","name":"articletitle","label":"Article Title"},{"value":"IFAC Proceedings Volumes","name":"journaltitle","label":"Journal Title"},{"value":"https:\/\/doi.org\/10.3182\/20060517-3-FR-2903.00216","name":"articlelink","label":"CrossRef DOI link to publisher maintained version"},{"value":"article","name":"content_type","label":"Content Type"},{"value":"Copyright \u00a9 2006 IFAC. Published by Elsevier Ltd. All rights reserved.","name":"copyright","label":"Copyright"}]}}