{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2022,3,31]],"date-time":"2022-03-31T11:18:20Z","timestamp":1648725500862},"reference-count":20,"publisher":"Cambridge University Press (CUP)","issue":"3","license":[{"start":{"date-parts":[[2009,2,27]],"date-time":"2009-02-27T00:00:00Z","timestamp":1235692800000},"content-version":"unspecified","delay-in-days":5689,"URL":"https:\/\/www.cambridge.org\/core\/terms"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["AIEDAM"],"published-print":{"date-parts":[[1993,8]]},"abstract":"<jats:p>When model-based planning systems are scaled up to deal with full-sized industrial projects, the resulting complexity in the project-specific model and production plan can create serious problems, not only in dealing with such complexity computationally, but also in user-acceptance. In the model-based planning system described in this paper, activities are dynamically generated, inherently at the detailed level of individual physical components. However, it is possible to intelligently group together collections of components which would be common to realistic work packages, and hence schedule on the basis of virtual components existing within an abstraction hierarchy. This paper describes a technique of project planning within an integrated design\/planning system, which exploits fundamental knowledge of engineered systems and provides powerful and flexible planning functionality.<\/jats:p>","DOI":"10.1017\/s0890060400000895","type":"journal-article","created":{"date-parts":[[2010,3,31]],"date-time":"2010-03-31T13:47:38Z","timestamp":1270043258000},"page":"209-228","source":"Crossref","is-referenced-by-count":0,"title":["Activity aggregation in model-based AI planning systems"],"prefix":"10.1017","volume":"7","author":[{"given":"Graham","family":"Winstanley","sequence":"first","affiliation":[]},{"given":"Kunito","family":"Hoshi","sequence":"additional","affiliation":[]}],"member":"56","published-online":{"date-parts":[[2009,2,27]]},"reference":[{"key":"S0890060400000895_ref020","volume-title":"Knowledge-based Process Planning for Construction and Manufacturing","author":"Zozoya-Gorostiza","year":"1989"},{"key":"S0890060400000895_ref019","unstructured":"Winstanley G. , Chacon M. and Levitt R. E. 1992. The application of model-based planning technology to full-scale projects. CIFE Technical Report #66, Center for Integrated Facility Engineering, University of Stanford, CA."},{"key":"S0890060400000895_ref017","volume-title":"Proceedings of the ACME Research Conference","author":"Winstanley","year":"1990"},{"key":"S0890060400000895_ref015","volume-title":"Department of Artificial Intelligence Research Report No","author":"Tate","year":"1976"},{"key":"S0890060400000895_ref012","volume-title":"Advance Papers, IJCAI-75","author":"Sacerdoti","year":"1975"},{"key":"S0890060400000895_ref009","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0887-3801(1990)4:2(155)"},{"key":"S0890060400000895_ref004","unstructured":"Fischer M. A. 1991. Constructability input to preliminary design of reinforced concrete structures, CIFE Technical Report #64, Center for Integrated Facility Engineering, Stanford University, CA."},{"key":"S0890060400000895_ref008","volume-title":"CIFE Working Paper #7","author":"Ito","year":"1989"},{"key":"S0890060400000895_ref016","volume-title":"Practical Planning: Extending The Classical AI Planning Paradigm","author":"Wilkins","year":"1988"},{"key":"S0890060400000895_ref006","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0887-3801(1987)1:4(253)"},{"key":"S0890060400000895_ref011","volume-title":"Proceedings of IJCAI-73","author":"Sacerdoti","year":"1973"},{"key":"S0890060400000895_ref007","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0887-3801(1989)3:1(18)"},{"key":"S0890060400000895_ref018","volume-title":"POP-11 Comes of Age: The Advancement of an AI Language","author":"Winstanley","year":"1989"},{"key":"S0890060400000895_ref001","doi-asserted-by":"publisher","DOI":"10.1016\/0004-3702(87)90092-0"},{"key":"S0890060400000895_ref002","doi-asserted-by":"publisher","DOI":"10.1017\/S0890060400000639"},{"key":"S0890060400000895_ref003","doi-asserted-by":"publisher","DOI":"10.1016\/0004-3702(71)90010-5"},{"key":"S0890060400000895_ref005","volume-title":"Blackboard Systems","author":"Hayes-Roth","year":"1987"},{"key":"S0890060400000895_ref010","doi-asserted-by":"publisher","DOI":"10.1049\/ip-d.1987.0047"},{"key":"S0890060400000895_ref013","doi-asserted-by":"publisher","DOI":"10.1016\/0004-3702(81)90007-2"},{"key":"S0890060400000895_ref014","doi-asserted-by":"publisher","DOI":"10.1016\/0004-3702(81)90008-4"}],"container-title":["Artificial Intelligence for Engineering Design, Analysis and Manufacturing"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/www.cambridge.org\/core\/services\/aop-cambridge-core\/content\/view\/S0890060400000895","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,15]],"date-time":"2019-05-15T22:17:47Z","timestamp":1557958667000},"score":1,"resource":{"primary":{"URL":"https:\/\/www.cambridge.org\/core\/product\/identifier\/S0890060400000895\/type\/journal_article"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[1993,8]]},"references-count":20,"journal-issue":{"issue":"3","published-print":{"date-parts":[[1993,8]]}},"alternative-id":["S0890060400000895"],"URL":"https:\/\/doi.org\/10.1017\/s0890060400000895","relation":{},"ISSN":["0890-0604","1469-1760"],"issn-type":[{"value":"0890-0604","type":"print"},{"value":"1469-1760","type":"electronic"}],"subject":[],"published":{"date-parts":[[1993,8]]}}}