{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,13]],"date-time":"2026-02-13T07:03:38Z","timestamp":1770966218180,"version":"3.50.1"},"reference-count":45,"publisher":"Cambridge University Press (CUP)","issue":"4","license":[{"start":{"date-parts":[[2009,2,27]],"date-time":"2009-02-27T00:00:00Z","timestamp":1235692800000},"content-version":"unspecified","delay-in-days":4928,"URL":"https:\/\/www.cambridge.org\/core\/terms"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["AIEDAM"],"published-print":{"date-parts":[[1995,9]]},"abstract":"<jats:title>Abstract<\/jats:title><jats:p>Collaborative design conflicts are an important type of process \u201cexception,\u201d that is, a real-life contingency such as a process change, execution error, or missed opportunity that leads to suboptimal performance of a collaborative process. This paper presents an integrated computational approach to collaborative process exception handling that avoids important weaknesses in current conflict management methods through the synergistic integration of conflict, workflow, and rationale technology. The approach is based upon an inclusive dependency language plus coordination services for dependency capture, process enactment, and exception handling. An initial implementation of this method called \u201ciDCSS\u201d is presented and challenges for future evolution of this technology are identified.<\/jats:p>","DOI":"10.1017\/s089006040000281x","type":"journal-article","created":{"date-parts":[[2010,3,31]],"date-time":"2010-03-31T13:46:45Z","timestamp":1270043205000},"page":"259-267","source":"Crossref","is-referenced-by-count":18,"title":["Conflict management as part of an integrated exception handling approach"],"prefix":"10.1017","volume":"9","author":[{"given":"Mark","family":"Klein","sequence":"first","affiliation":[]}],"member":"56","published-online":{"date-parts":[[2009,2,27]]},"reference":[{"key":"S089006040000281X_ref044","doi-asserted-by":"publisher","DOI":"10.1145\/99332.99347"},{"key":"S089006040000281X_ref045","unstructured":"Zlotkin G. , & Rosenschein J.S. (1990). Negotiation and conflict resolution in non-cooperative domains. AAAI-90, 100\u2013105."},{"key":"S089006040000281X_ref043","unstructured":"Winograd T. (1986). A language oblique action perspective on the design of cooperative work. In Proc. of CSCW '86."},{"key":"S089006040000281X_ref042","volume-title":"Planning and understanding","author":"Wilensky","year":"1983"},{"key":"S089006040000281X_ref038","doi-asserted-by":"publisher","DOI":"10.1145\/357442.357445"},{"key":"S089006040000281X_ref036","doi-asserted-by":"publisher","DOI":"10.1016\/0004-3702(81)90007-2"},{"key":"S089006040000281X_ref041","doi-asserted-by":"publisher","DOI":"10.1016\/0954-1810(87)90202-0"},{"key":"S089006040000281X_ref029","unstructured":"McCall R. (1987). PHIBIS: Procedurally hierarchical issue-based information systems. In Proc. Conf. Planning and Design in Architecture."},{"key":"S089006040000281X_ref025","doi-asserted-by":"publisher","DOI":"10.1207\/s15327051hci0603&4_2"},{"key":"S089006040000281X_ref021","unstructured":"Klein M. , & Lu S.C.Y. (1991). Detecting and resolving conflicts among cooperating human and machine-based design agents. Int. J. Artif. Intell. Eng. (July), 143\u2013162."},{"key":"S089006040000281X_ref019","doi-asserted-by":"crossref","unstructured":"Klein M. (1995). Integrated coordination in cooperative design. Int. J. Prod. Econ. Special Issue on Integration and Collaboration Systems.","DOI":"10.1016\/0925-5273(95)99066-E"},{"key":"S089006040000281X_ref031","doi-asserted-by":"crossref","DOI":"10.7551\/mitpress\/2768.001.0001","volume-title":"Enterprise Integration Modelling","author":"Petrie","year":"1992"},{"key":"S089006040000281X_ref007","unstructured":"Faragher-Horwell R. , Klein M. , & Zarley D. (1992). Overview and Functional Specifications for TCAPS Task Coordination and Planning System: A Computer-Supported Workflow Management System. Tech. Rep. BCS-G2010\u2013130, Boeing Computer Services Tech. Rep., The Boeing Company, December 1992."},{"key":"S089006040000281X_ref040","doi-asserted-by":"publisher","DOI":"10.1177\/1063293X9400200302"},{"key":"S089006040000281X_ref015","first-page":"355","volume-title":"Multi-user Interfaces and Applications","author":"Karbe","year":"1990"},{"key":"S089006040000281X_ref014","article-title":"The interplay of context, process, and conflict in concurrent engineering","volume":"11","author":"Kannapan","year":"1994","journal-title":"Concurrent Engineering Research and Applications: Special Issue on Conflict Management in Concurrent Engineering"},{"key":"S089006040000281X_ref006","doi-asserted-by":"publisher","DOI":"10.1177\/1063293X9400200307"},{"key":"S089006040000281X_ref020","doi-asserted-by":"publisher","DOI":"10.1016\/0954-1810(89)90013-7"},{"key":"S089006040000281X_ref016","article-title":"Supporting conflict resolution in cooperative design systems","volume":"21","author":"Klein","year":"1991","journal-title":"IEEE Systems Man and Cybernetics"},{"key":"S089006040000281X_ref012","doi-asserted-by":"publisher","DOI":"10.1145\/175222.175230"},{"key":"S089006040000281X_ref003","doi-asserted-by":"publisher","DOI":"10.1109\/2.179160"},{"key":"S089006040000281X_ref024","unstructured":"Lu S.C.Y. (1991). Integrated and cooperative knowledge processing technology for concurrent engineering. In Knowledge-Based Engineering Systems Research Laboratory Annual Report, ( Lu S.C.Y. , Ed.), University of Illinois."},{"key":"S089006040000281X_ref009","doi-asserted-by":"crossref","unstructured":"Fox M.S. , & Smith S.F. (1984). ISIS \u2014 A knowledge-based system for factory scheduling. Expert Systems (July).","DOI":"10.1111\/j.1468-0394.1984.tb00424.x"},{"key":"S089006040000281X_ref027","doi-asserted-by":"publisher","DOI":"10.1016\/0004-3702(89)90002-7"},{"key":"S089006040000281X_ref030","unstructured":"Mi P.W. , & Scacchi W. (1991). Modelling articulation work in software engineering processes. In Proc. First Int. Conf. Software Process, 188\u2013201."},{"key":"S089006040000281X_ref028","doi-asserted-by":"publisher","DOI":"10.1177\/1063293X9400200304"},{"key":"S089006040000281X_ref008","doi-asserted-by":"publisher","DOI":"10.1207\/s15327051hci0603&4_7"},{"key":"S089006040000281X_ref004","doi-asserted-by":"crossref","DOI":"10.1016\/0010-4485(85)90291-X","volume-title":"Failure handling in a design expert system","author":"Brown","year":"1985"},{"key":"S089006040000281X_ref002","volume-title":"Systems engineering and analysis","author":"Blanchard","year":"1981"},{"key":"S089006040000281X_ref037","article-title":"Equations aren't enough: Informal modeling in design","volume":"7","author":"Subrahmanian","year":"1993","journal-title":"AI EDAM"},{"key":"S089006040000281X_ref011","doi-asserted-by":"publisher","DOI":"10.1177\/1063293X9400200303"},{"key":"S089006040000281X_ref005","doi-asserted-by":"publisher","DOI":"10.1016\/0004-3702(85)90053-0"},{"key":"S089006040000281X_ref001","doi-asserted-by":"publisher","DOI":"10.1177\/1063293X9400200306"},{"key":"S089006040000281X_ref010","unstructured":"Goldstein I. (1975). Bargaining between goals. Proceedings of the IJCAI, 175\u2013180."},{"key":"S089006040000281X_ref023","doi-asserted-by":"publisher","DOI":"10.1207\/s15327051hci0603&4_3"},{"key":"S089006040000281X_ref017","doi-asserted-by":"crossref","unstructured":"Klein M. (1992). DRCS: An integrated system for capture of designs and their rationale. In Proc. of Second Internal. Conf. Artif. Intell. Design.","DOI":"10.1007\/978-94-011-2787-5_20"},{"key":"S089006040000281X_ref013","doi-asserted-by":"publisher","DOI":"10.1145\/214427.214432"},{"key":"S089006040000281X_ref018","doi-asserted-by":"publisher","DOI":"10.1109\/2.179154"},{"key":"S089006040000281X_ref034","doi-asserted-by":"publisher","DOI":"10.1109\/TC.1980.1675516"},{"key":"S089006040000281X_ref022","unstructured":"Lander S. , & Lesser V.R. Negotiation to resolve conflicts among design experts. Tech. Rep. Dept. of Computer and Information Science, August 1988."},{"key":"S089006040000281X_ref033","doi-asserted-by":"publisher","DOI":"10.1177\/1063293X9400200309"},{"key":"S089006040000281X_ref039","doi-asserted-by":"publisher","DOI":"10.1016\/0004-3702(80)90032-6"},{"key":"S089006040000281X_ref035","unstructured":"Smith K. , Karandikar H. , Rinderle J. , Navinchandra D. , & Reddy S. (1991). Representing and managing constraints for computer-based cooperative product development. In Third Annual Symposium on Concurrent Engineering, 475\u2013490."},{"key":"S089006040000281X_ref032","doi-asserted-by":"publisher","DOI":"10.1177\/1063293X9400200308"},{"key":"S089006040000281X_ref026","first-page":"39","article-title":"VT: An expert elevator designer","volume":"8","author":"Marcus","year":"1987","journal-title":"Artif. Intell. Magazine"}],"container-title":["Artificial Intelligence for Engineering Design, Analysis and Manufacturing"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/www.cambridge.org\/core\/services\/aop-cambridge-core\/content\/view\/S089006040000281X","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2020,6,3]],"date-time":"2020-06-03T12:02:51Z","timestamp":1591185771000},"score":1,"resource":{"primary":{"URL":"https:\/\/www.cambridge.org\/core\/product\/identifier\/S089006040000281X\/type\/journal_article"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[1995,9]]},"references-count":45,"journal-issue":{"issue":"4","published-print":{"date-parts":[[1995,9]]}},"alternative-id":["S089006040000281X"],"URL":"https:\/\/doi.org\/10.1017\/s089006040000281x","relation":{},"ISSN":["0890-0604","1469-1760"],"issn-type":[{"value":"0890-0604","type":"print"},{"value":"1469-1760","type":"electronic"}],"subject":[],"published":{"date-parts":[[1995,9]]}}}