{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,28]],"date-time":"2026-02-28T16:57:07Z","timestamp":1772297827952,"version":"3.50.1"},"reference-count":23,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[1998,3,1]],"date-time":"1998-03-01T00:00:00Z","timestamp":888710400000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[1998,3,1]],"date-time":"1998-03-01T00:00:00Z","timestamp":888710400000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Discrete Event Dynamic Systems"],"published-print":{"date-parts":[[1998,3]]},"DOI":"10.1023\/a:1008256409920","type":"journal-article","created":{"date-parts":[[2002,12,22]],"date-time":"2002-12-22T08:47:34Z","timestamp":1040546854000},"page":"37-54","source":"Crossref","is-referenced-by-count":25,"title":["Optimal Production Planning in a Multi-Product Stochastic Manufacturing System with Long-Run Average Cost"],"prefix":"10.1007","volume":"8","author":[{"given":"S.P.","family":"Sethi","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"W.","family":"Suo","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"M.I.","family":"Taksar","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"H.","family":"Yan","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","reference":[{"key":"159027_CR1","first-page":"532","volume":"36","author":"T. Bielecki","year":"1998","unstructured":"Bielecki, T. and Kumar, P. R., 1998. Optimality of Zero\u2013Inventory Policies for Unreliable Manufacturing Systems, Operation Research, Vol. 36, pp. 532\u2013546.","journal-title":"Optimality of Zero\u2013Inventory Policies for Unreliable Manufacturing Systems"},{"key":"159027_CR2","doi-asserted-by":"crossref","first-page":"321","DOI":"10.1007\/BF00170212","volume":"3","author":"M. Caramanis","year":"1991","unstructured":"Caramanis, M. and Sharifnia, A., 1991. Optimal Manufacturing Flow Control Design, International Journal of Flexible Manufacturing Systems, Vol. 3, pp.321\u2013336.","journal-title":"International Journal of Flexible Manufacturing Systems"},{"key":"159027_CR3","volume-title":"Optimization and Nonsmooth Analysis","author":"F. Clarke","year":"1983","unstructured":"Clarke, F., 1983. Optimization and Nonsmooth Analysis, Wiley\u2013Interscience, New York, New York."},{"key":"159027_CR4","doi-asserted-by":"crossref","DOI":"10.1007\/978-1-4612-6380-7","volume-title":"Deterministic and Stochastic Controls","author":"W. H. Fleming","year":"1975","unstructured":"Fleming, W. H. and Rishel, R.W., 1975. Deterministic and Stochastic Controls, Springer\u2013Verlag, New York, New York."},{"key":"159027_CR5","volume-title":"Controlled Markov Processes and Viscosity Solutions","author":"W. H. Fleming","year":"1992","unstructured":"Fleming, W. H. and Soner, H. M., 1992. Controlled Markov Processes and Viscosity Solutions. Springer\u2013Verlag, New York, New York."},{"key":"159027_CR6","volume-title":"Manufacturing Systems Engineering","author":"S. B. Gershwin","year":"1994","unstructured":"Gershwin, S. B., 1994. Manufacturing Systems Engineering, Prentice\u2013Hall, Englewood Cliffs, NJ."},{"issue":"6","key":"159027_CR7","doi-asserted-by":"crossref","first-page":"1952","DOI":"10.1137\/S0363012996299302","volume":"35","author":"M. K. Ghosh","year":"1997","unstructured":"Ghosh, M. K., Arapostathis, A., and Marcus, S. I., 1997. Ergodic Control of Switching Diffusions, SIAM J. Control and Optimization, Vol. 35, No. 6, pp. 1952\u20131988.","journal-title":"SIAM J. Control and Optimization"},{"key":"159027_CR8","unstructured":"Liberopoulos, Q., 1992. Flow Control of Failure\u2013prone Manufacturing Systems: Controller Design Theory and Applications, Ph.D. Dissertation, Boston University."},{"key":"159027_CR9","first-page":"889","volume":"4","author":"G. Liberopoulos","year":"1993","unstructured":"Liberopoulos, G. and Caramanis, M., 1993.Production Control of Manufacturing Systems with Production Rate Dependent Failure Rates, IEEE Transaction on Automated Control, AC\u201338, 4, pp. 889\u2013895.","journal-title":"IEEE Transaction on Automated Control, AC\u201338"},{"issue":"2","key":"159027_CR10","doi-asserted-by":"crossref","first-page":"282","DOI":"10.1109\/9.341793","volume":"40","author":"G. Liberopoulos","year":"1995","unstructured":"Liberopoulos, G. and Hu, J.\u2013Q., 1995. On the Ordering of Optimal Hedging Points in a Class of Manufacturing Flow Control Models, IEEE on AC, Vol. 40, No. 2, pp. 282\u2013286.","journal-title":"IEEE on AC"},{"key":"159027_CR11","unstructured":"Presman, E., Sethi, S.P., and Suo, W., 1997. Optimal Feedback Production Planning in Stochastic Dynamic Jobshops, Lectures in Applied Mathematics (American Mathematical Society),. Mathematics of Stochastic Manufacturing Systems, Q. Zhang and G. Yin (eds), AMS\u2013SIAM Summer Seminar in Applied Mathematics, Vol. 33, pp.235\u2013252."},{"issue":"9","key":"159027_CR12","doi-asserted-by":"crossref","first-page":"1325","DOI":"10.1016\/0005-1098(95)00040-4","volume":"31","author":"E. Presman","year":"1995","unstructured":"Presman, E., Sethi, S.P. and Zhang, Q., 1995. Optimal Feedback Production Planning in a Stochastic N\u2013Machine Flowshop, Automatica, Vol. 31, 9, pp.1325\u20131332.","journal-title":"Automatica"},{"key":"159027_CR13","volume-title":"Convex Analysis","author":"R. Rockafellar","year":"1972","unstructured":"Rockafellar, R., 1972. Convex Analysis, Princeton University Press, Princeton, NJ."},{"key":"159027_CR14","doi-asserted-by":"crossref","first-page":"932","DOI":"10.1287\/moor.17.4.932","volume":"17","author":"S. P. Sethi","year":"1992","unstructured":"Sethi, S. P., Soner, H. M., Zhang, Q., and Jiang, J., 1992. Turnpike Sets and Their Analysis in Stochastic Production Planning Problems, Mathematics of Operations Research, Vol. 17, pp. 932\u2013950.","journal-title":"Mathematics of Operations Research"},{"key":"159027_CR15","doi-asserted-by":"crossref","first-page":"161","DOI":"10.1023\/A:1022696215389","volume":"92","author":"S.P. Sethi","year":"1997","unstructured":"Sethi, S.P., Suo, W., Taksar, M.I., and Zhang, Q., 1997. Optimal Production Planning in a Stochastic Manufacturing System with Long\u2013Run Average Cost, J. of Opt. Th. and Appl., Vol. 92, pp. 161\u2013188.","journal-title":"J. of Opt. Th. and Appl."},{"key":"159027_CR16","doi-asserted-by":"crossref","DOI":"10.1007\/978-1-4612-0285-1","volume-title":"Hierarchical Decision Making in Stochastic Manufacturing Systems","author":"S. P. Sethi","year":"1994","unstructured":"Sethi, S. P. and Zhang, Q., 1994. Hierarchical Decision Making in Stochastic Manufacturing Systems. Birkh\u00e4user Boston, Cambridge, MA."},{"key":"159027_CR17","doi-asserted-by":"crossref","first-page":"620","DOI":"10.1109\/9.1270","volume":"AC\u201333","author":"A. Sharifnia","year":"1988","unstructured":"Sharifnia, A., 1988. Production Control of a Manufacturing System with Multiple Machine States, IEEE Transactions on Automatic Control, AC\u201333, pp.620\u2013625.","journal-title":"IEEE Transactions on Automatic Control"},{"key":"159027_CR18","volume-title":"Synthesis of Optimal Policies in Stochastic Manufacturing Systems","author":"N. Srivatsan","year":"1993","unstructured":"Srivatsan, N., 1993. Synthesis of Optimal Policies in Stochastic Manufacturing Systems, Ph.D. Dissertation, O.R. Center, MIT."},{"key":"159027_CR19","doi-asserted-by":"crossref","unstructured":"Srivatsan, N., and Dallery, Y., 1998. Partial Characterization of Optimal Hedging Point Policies in Unreliable Two\u2013Part\u2013Type Manufacturing Systems, Operations Research, Vol. 46, No. 1.","DOI":"10.1287\/opre.46.1.36"},{"key":"159027_CR20","doi-asserted-by":"crossref","first-page":"201","DOI":"10.1007\/BF00939913","volume":"75","author":"R. Sznadjer","year":"1992","unstructured":"Sznadjer, R., and Filar, J.A., 1992. Some Comments on a Theorem of Hardy and Littlewood, J. of Opt. Th. and Appl., Vol. 75, pp. 201\u2013208.","journal-title":"J. of Opt. Th. and Appl."},{"key":"159027_CR21","unstructured":"Veatch, M., 1992. Queueing Control Problems for Production\/Inventory Systems, Ph.D. Dissertation, O.R. Center, MIT, 1992."},{"key":"159027_CR22","unstructured":"Wein, L., 1991. Dynamic Scheduling of a Multiclass Make\u2013to\u2013Stock Queue, Working Paper, School of Management, MIT."},{"issue":"3","key":"159027_CR23","doi-asserted-by":"crossref","first-page":"511","DOI":"10.1007\/BF02207640","volume":"83","author":"H. Yan","year":"1994","unstructured":"Yan, H., Yin, G., and Lou, S.X.C., 1994. Using Stochastic Optimization to Determine Threshold Values for Control of Unreliable Manufacturing Systems, Journal of Optimization Theory and Applications, Vol. 83, No. 3, pp. 511\u2013539.","journal-title":"Journal of Optimization Theory and Applications"}],"container-title":["Discrete Event Dynamic Systems"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1023\/A:1008256409920.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1023\/A:1008256409920\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1023\/A:1008256409920.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,7,29]],"date-time":"2025-07-29T04:17:37Z","timestamp":1753762657000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1023\/A:1008256409920"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[1998,3]]},"references-count":23,"journal-issue":{"issue":"1","published-print":{"date-parts":[[1998,3]]}},"alternative-id":["159027"],"URL":"https:\/\/doi.org\/10.1023\/a:1008256409920","relation":{},"ISSN":["0924-6703","1573-7594"],"issn-type":[{"value":"0924-6703","type":"print"},{"value":"1573-7594","type":"electronic"}],"subject":[],"published":{"date-parts":[[1998,3]]}}}