{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,8,2]],"date-time":"2025-08-02T19:06:38Z","timestamp":1754161598486,"version":"3.41.2"},"reference-count":19,"publisher":"Springer Science and Business Media LLC","issue":"4","license":[{"start":{"date-parts":[[1998,12,1]],"date-time":"1998-12-01T00:00:00Z","timestamp":912470400000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[1998,12,1]],"date-time":"1998-12-01T00:00:00Z","timestamp":912470400000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Discrete Event Dynamic Systems"],"published-print":{"date-parts":[[1998,12]]},"DOI":"10.1023\/a:1008345132480","type":"journal-article","created":{"date-parts":[[2002,12,22]],"date-time":"2002-12-22T09:41:38Z","timestamp":1040550098000},"page":"353-364","source":"Crossref","is-referenced-by-count":0,"title":["Scheduling Under Common Due Date, A Single Resource and Precedence Constraints\u2014A Dynamic Approach"],"prefix":"10.1007","volume":"8","author":[{"given":"Konstantin","family":"Kogan","sequence":"first","affiliation":[]}],"member":"297","reference":[{"key":"184718_CR1","doi-asserted-by":"crossref","first-page":"789","DOI":"10.1057\/jors.1989.141","volume":"40","author":"I. Arizono","year":"1989","unstructured":"Arizono, I., Yokoi, S., and Ohta, H. 1989. The effects of varying production rates on inventory control. Journal of Operational Research Society 40: 789-796.","journal-title":"Journal of Operational Research Society"},{"key":"184718_CR2","first-page":"41","volume":"37","author":"C. I. Bell","year":"1990","unstructured":"Bell, C. I., and Park, K. 1990. Solving resource constrained project scheduling problems by \u039b* search. Naval Research Logistics 37: 41-84.","journal-title":"Naval Research Logistics"},{"key":"184718_CR3","doi-asserted-by":"crossref","first-page":"158","DOI":"10.1287\/mnsc.43.2.158","volume":"43-2","author":"O. Berman","year":"1997","unstructured":"Berman, O., Larson, R., and Pinker, E. 1997. Scheduling workforce and workflow in a high volume factory. Management Science 43-2: 158-172.","journal-title":"Management Science"},{"key":"184718_CR4","volume-title":"Applied Optimal Control","author":"A. E. Bryson","year":"1969","unstructured":"Bryson, A. E., and Ho, Y.-C. 1969. Applied Optimal Control. Waltham: Ginn and Company."},{"key":"184718_CR5","doi-asserted-by":"crossref","unstructured":"Buzacott, J. A., and Ozcarahan, I. A. 1983. One-and two-stage scheduling of two products with distributed inserted idle times: the benefits of a controllable production rate. Naval Research Logistics Quarterly 657-696.","DOI":"10.1002\/nav.3800300413"},{"key":"184718_CR6","doi-asserted-by":"publisher","first-page":"262","DOI":"10.1016\/0377-2217(87)90240-2","volume":"29","author":"N. Christofides","year":"1987","unstructured":"Christofides, N., Alvarez-Valdes, R., and Tamarit, J. M. 1987. Project scheduling with re source constraints: A branch and bound approach. European Journal of Operational Research 29: 262\u2013273.","journal-title":"European Journal of Operational Research"},{"key":"184718_CR7","doi-asserted-by":"crossref","first-page":"1803","DOI":"10.1287\/mnsc.38.12.1803","volume":"38","author":"E. Demeulemeester","year":"1992","unstructured":"Demeulemeester, E., and Herroelen, W. 1992. Abranch and bound procedure for the multiple resource constrained project scheduling problem. Management Science 38: 1803-1818.","journal-title":"Management Science"},{"key":"184718_CR8","doi-asserted-by":"crossref","first-page":"1149","DOI":"10.1080\/00207178308933136","volume":"38-6","author":"A. Janiak","year":"1983","unstructured":"Janiak, A., and Stankiewicz, A. 1983. The equivalence of local and global time-optimal control of a complex of operations. International Journal of Control 38-6: 1149-1165.","journal-title":"International Journal of Control"},{"key":"184718_CR9","doi-asserted-by":"crossref","first-page":"353","DOI":"10.1080\/05695558308974659","volume":"15-4","author":"J. G. Kimemia","year":"1983","unstructured":"Kimemia, J. G., and Gershwin, S. B. 1983. An algorithm for the computer control of a flexible manufacturing system. IEE Transactions 15-4: 353-362.","journal-title":"IEE Transactions"},{"key":"184718_CR10","doi-asserted-by":"crossref","first-page":"343","DOI":"10.1007\/BF01439152","volume":"5","author":"E. Khmelnisky","year":"1995","unstructured":"Khmelnisky, E., Kogan, K., and Maimon, O. 1995. A maximum principle based combined method for scheduling in a flexible manufacturing system. Discrete Event Dynamic Systems 5: 343-355.","journal-title":"Discrete Event Dynamic Systems"},{"key":"184718_CR11","doi-asserted-by":"crossref","first-page":"715","DOI":"10.1080\/00207549608904930","volume":"34-3","author":"K. Kogan","year":"1996","unstructured":"Kogan, K., and Khmelnisky, E. 1996. An optimal control model for continuous-time production and setup scheduling. International Journal of Production Research 34-3: 715-725.","journal-title":"International Journal of Production Research"},{"key":"184718_CR12","doi-asserted-by":"crossref","first-page":"161","DOI":"10.1287\/mnsc.28.2.161","volume":"28","author":"I. S. Kurtulus","year":"1982","unstructured":"Kurtulus, I. S., and Davis, E. W. 1982. Multi project scheduling: Categorization of heuristic rule performance. Management Science 28: 161-172.","journal-title":"Management Science"},{"key":"184718_CR13","doi-asserted-by":"crossref","first-page":"31","DOI":"10.1080\/07408179008964155","volume":"22-1","author":"R. C. Leachman","year":"1990","unstructured":"Leachman, R. C., Dincerler, A., and Kim, S. 1990. Resource-constrained scheduling of projects with variable intensity activities. IIE Transactions 22-1: 31-39.","journal-title":"IIE Transactions"},{"key":"184718_CR14","doi-asserted-by":"crossref","first-page":"2459","DOI":"10.1080\/00207549108948096","volume":"29","author":"I. Moon","year":"1991","unstructured":"Moon, I., Gallego, G., and Simchi-Levi, D. 1991. Controllable production rates in a family context. International Journal of Production Research 29: 2459-2470.","journal-title":"International Journal of Production Research"},{"key":"184718_CR15","doi-asserted-by":"crossref","first-page":"574","DOI":"10.1080\/07408179508936773","volume":"27","author":"L. Ozdamar","year":"1995","unstructured":"Ozdamar, L., and Ulusoy, G. 1995. A survey on the resource-constrained project scheduling problem. IIE Transactions 27: 574-586.","journal-title":"IIE Transactions"},{"key":"184718_CR16","volume-title":"Convex Functions","author":"A. W. Roberts","year":"1973","unstructured":"Roberts, A. W., and Varberg, D. E. 1973. Convex Functions. New York: Academic Press."},{"key":"184718_CR17","doi-asserted-by":"crossref","first-page":"252","DOI":"10.1080\/05695557808975212","volume":"10","author":"J. P. Stinson","year":"1978","unstructured":"Stinson, J. P., Davis, E.W., and Khumawala, B.W. 1978. Multiple-resource constrained scheduling using branch and bound. AIIE Transactions 10: 252-259.","journal-title":"AIIE Transactions"},{"key":"184718_CR18","doi-asserted-by":"crossref","first-page":"1040","DOI":"10.1287\/mnsc.27.9.1040","volume":"27-9","author":"J. Weglarz","year":"1981","unstructured":"Weglarz, J. 1981. Project scheduling with continuously-divisible, doubly constrained resources. Management Science 27-9: 1040-1053.","journal-title":"Management Science"},{"key":"184718_CR19","doi-asserted-by":"crossref","first-page":"644","DOI":"10.1109\/TSMC.1979.4310093","volume":"9","author":"J. Weglarz","year":"1979","unstructured":"Weglarz, J. 1979. Project scheduling with discrete and continuous resources. IEEE Trans. Systems, Man and Cybernetics 9: 644-650.","journal-title":"IEEE Trans. Systems, Man and Cybernetics"}],"container-title":["Discrete Event Dynamic Systems"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1023\/A:1008345132480.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1023\/A:1008345132480\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1023\/A:1008345132480.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,7,29]],"date-time":"2025-07-29T04:05:32Z","timestamp":1753761932000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1023\/A:1008345132480"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[1998,12]]},"references-count":19,"journal-issue":{"issue":"4","published-print":{"date-parts":[[1998,12]]}},"alternative-id":["184718"],"URL":"https:\/\/doi.org\/10.1023\/a:1008345132480","relation":{},"ISSN":["0924-6703","1573-7594"],"issn-type":[{"type":"print","value":"0924-6703"},{"type":"electronic","value":"1573-7594"}],"subject":[],"published":{"date-parts":[[1998,12]]}}}