{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,1,19]],"date-time":"2026-01-19T04:32:00Z","timestamp":1768797120836,"version":"3.49.0"},"reference-count":30,"publisher":"Springer Science and Business Media LLC","issue":"3","license":[{"start":{"date-parts":[[2001,7,1]],"date-time":"2001-07-01T00:00:00Z","timestamp":993945600000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2001,7,1]],"date-time":"2001-07-01T00:00:00Z","timestamp":993945600000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Journal of Systems Integration"],"published-print":{"date-parts":[[2001,7]]},"DOI":"10.1023\/a:1011297726485","type":"journal-article","created":{"date-parts":[[2002,12,23]],"date-time":"2002-12-23T09:18:21Z","timestamp":1040635101000},"page":"189-206","source":"Crossref","is-referenced-by-count":21,"title":["Supply Chain Model for the Semiconductor Industry of Global Market"],"prefix":"10.1007","volume":"10","author":[{"given":"Young Hoon","family":"Lee","sequence":"first","affiliation":[]}],"member":"297","reference":[{"key":"337507_CR1","unstructured":"A. Azevedo and J. P. Sousa, \u201cOn the design of an order promise system for virtual enterprises,\u201d http:\/\/www.nimblesite.com\/xcittic, 1996."},{"issue":"1","key":"337507_CR2","doi-asserted-by":"crossref","first-page":"69","DOI":"10.1287\/inte.25.1.69","volume":"25","author":"B. C. Arntzen","year":"1995","unstructured":"B. C. Arntzen, G. G. Brown, T. P. Harrison, and L. L. Trafton, \u201cGlobal supply chain management at Digital Equipment Corporation,\u201d Interfaces 25(1), pp. 69\u201393, 1995.","journal-title":"Interfaces"},{"issue":"3","key":"337507_CR3","doi-asserted-by":"crossref","first-page":"377","DOI":"10.1287\/opre.36.3.377","volume":"36","author":"G. R. Bitran","year":"1988","unstructured":"G. R. Bitran and D. Tirupati, \u201cDevelopment and implementation of a scheduling system for a wafer fabrication facility,\u201d Operations Research 36(3), pp. 377\u2013395, 1988.","journal-title":"Operations Research"},{"key":"337507_CR4","unstructured":"J. L. Bouff, \u201cSemiconductor manufacturing: A supply chain management perspective,\u201d in Conference on Global Supply Chain Management, Singapore, 1997."},{"key":"337507_CR5","unstructured":"L. Demeester and C. Tang, \u201cReducing cycle time at an IBM wafer fabrication facility,\u201d Technical Paper, University of California at Los Angeles, 1994."},{"issue":"2","key":"337507_CR6","doi-asserted-by":"crossref","first-page":"101","DOI":"10.1109\/66.136270","volume":"5","author":"B. Ehteshami","year":"1992","unstructured":"B. Ehteshami, R. G. Petrakian, and P. M. Shabe, \u201cTrade-offs in cycle time management: Hot lots,\u201d IEEE Transactions on Semiconductor Manufacturing 5(2), pp. 101\u2013106, 1992.","journal-title":"IEEE Transactions on Semiconductor Manufacturing"},{"key":"337507_CR7","doi-asserted-by":"crossref","first-page":"219","DOI":"10.1016\/S0377-2217(98)90299-5","volume":"115","author":"S. S. Erenguc","year":"1999","unstructured":"S. S. Erenguc, N. C. Simpson, and A. J. Vakharia, \u201cIntegrated production\/distribution planning in supply chain: an invited review,\u201d European Journal of Operational Research 115, pp. 219\u2013236, 1999.","journal-title":"European Journal of Operational Research"},{"key":"337507_CR8","unstructured":"F. Frederix, \u201cPlanning and scheduling multi-site semiconductor production chains,\u201d Esprit Integration in Manufacturing Conference, Galway, Ireland, 2\u20134 October, 1996."},{"issue":"1","key":"337507_CR9","doi-asserted-by":"crossref","first-page":"36","DOI":"10.1109\/66.4371","volume":"1","author":"C. R. Glassey","year":"1988","unstructured":"C. R. Glassey and M. G. C. Resende, \u201cClosed-loop job release control for VSLI circuit manufacturing,\u201d IEEE Transactions on Semiconductor Manufacturing 1(1), pp 36\u201346, 1988.","journal-title":"IEEE Transactions on Semiconductor Manufacturing"},{"key":"337507_CR10","doi-asserted-by":"crossref","first-page":"213","DOI":"10.1016\/0167-6377(88)90033-8","volume":"7","author":"C. R. Glassey","year":"1988","unstructured":"C. R. Glassey and M. G. C. Resende, \u201cA scheduling rule for job release in semiconductor fabrication,\u201d Operations Research Letters 7, pp. 213\u2013217, 1988.","journal-title":"Operations Research Letters"},{"key":"337507_CR11","unstructured":"P. G. Glassey, \u201cA comparison of release rules using BLOCS\/M simulations,\u201d ESRC Report 90\u201315, 1990."},{"key":"337507_CR12","doi-asserted-by":"crossref","unstructured":"S. Jain, B. Gan, C. Lim, and Y. Low, \u201cCriticality of detailed modeling in semiconductor supply chain simulation,\u201d Proceedings of the 1999 Winter Simulation Conference, pp. 888\u2013896.","DOI":"10.1145\/324138.324547"},{"key":"337507_CR13","unstructured":"S. Jain, B. Gan, C. Lim, and Y. Low, \u201cBottleneck based modeling of semiconductor supply chains,\u201d Proceedings of the MASM 2000 Conference, pp. 340\u2013345."},{"key":"337507_CR14","unstructured":"S. Kim, S. Yea, and B. Kim, \u201cStepper scheduling in semiconductor wafer fabrication process,\u201d Proceedings of the International Conference on Modeling and Analysis of Semiconductor Manufacturing 2000, pp. 157\u2013162."},{"key":"337507_CR15","unstructured":"C. Kraft, \u201cDynamic kanban semiconductor inventory management system,\u201d Technical Paper, Texas Instruments Inc., 1993."},{"key":"337507_CR16","unstructured":"R. C. Leachman, \u201cThe competitive semiconductor manufacturing survey: Second report on results of the main phase,\u201d CSM-08 Report, 1994."},{"key":"337507_CR17","doi-asserted-by":"crossref","first-page":"835","DOI":"10.1287\/opre.41.5.835","volume":"41","author":"H. L. Lee","year":"1993","unstructured":"H. L. Lee and C. Billington, \u201cMaterial management in decentralized supply chains,\u201d Operations Research 41, pp. 835\u2013847, 1993.","journal-title":"Operations Research"},{"issue":"4","key":"337507_CR18","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1287\/inte.23.4.1","volume":"23","author":"H. L. Lee","year":"1993","unstructured":"H. L. Lee, C. Billington, and B. Carter, \u201cHewlett Packard gains control of inventory and service through design for localization,\u201d Interfaces 23(4), pp. 1\u201311, 1993.","journal-title":"Interfaces"},{"key":"337507_CR19","volume-title":"A modular production planning system for semiconductor manufacturing","author":"C. Liu","year":"1992","unstructured":"C. Liu, \u201cA modular production planning system for semiconductor manufacturing,\u201d Ph.D. Dissertation, University of California, Berkeley, 1992."},{"issue":"4","key":"337507_CR20","doi-asserted-by":"crossref","first-page":"159","DOI":"10.1109\/66.44620","volume":"2","author":"S. X. C. Lou","year":"1989","unstructured":"S. X. C. Lou and P.W. Kager, \u201cA robust production control policy for VLSI wafer fabrication,\u201d IEEE Transactions on Semiconductor Manufacturing 2(4), pp. 159\u2013164, 1989.","journal-title":"IEEE Transactions on Semiconductor Manufacturing"},{"key":"337507_CR21","unstructured":"C. Makatsoris, N. P. Leach, H. D. Richards, C. Besant, and M. Ristic, \u201cAddressing the planning control gaps in a semiconductor virtual enterprises,\u201d Esprit Integration in Manufacturing Conference, Galway, Ireland, 2\u20134 October, 1996."},{"key":"337507_CR22","unstructured":"S. V. Murty and J. W. Bienvenu, \u201cGlobal planning at Harris Semiconductor,\u201d IEEE International Symposium on Semiconductor Manufacturing, 1995."},{"key":"337507_CR23","unstructured":"I. M. Ovacik and W. Weng, \u201cA framework for supply chain management in semiconductor manufacturing industry,\u201d IEEE\/CPMT International Electronics Manufacturing Technology Symposium, 1995."},{"issue":"2","key":"337507_CR24","doi-asserted-by":"crossref","first-page":"102","DOI":"10.1287\/inte.23.2.102","volume":"23","author":"J. F. Shapiro","year":"1993","unstructured":"J. F. Shapiro, V. M. Singhal, and N. W. Wagner, \u201cOptimizing the value chain,\u201d Interfaces 23(2), pp. 102\u2013117, 1993.","journal-title":"Interfaces"},{"issue":"5","key":"337507_CR25","doi-asserted-by":"crossref","first-page":"879","DOI":"10.1080\/00207549008942761","volume":"28","author":"M. L. Spearman","year":"1990","unstructured":"M. L. Spearman, D. L. Woodruff, and W. J. Hopp, \u201cCONWIP: A pull alternative to kanban,\u201d International Journal of Production Research 28(5), pp. 879\u2013894, 1990.","journal-title":"International Journal of Production Research"},{"key":"337507_CR26","doi-asserted-by":"crossref","unstructured":"S. Umeda and A. Jones, \u201cAn integrated test-bed system for supply chain management,\u201d Proceedings of the 1998 winter simulation conference, pp. 1377\u20131385.","DOI":"10.1109\/WSC.1998.746005"},{"issue":"4","key":"337507_CR27","doi-asserted-by":"crossref","first-page":"47","DOI":"10.1080\/07408179208964233","volume":"24","author":"R. Uzsoy","year":"1992","unstructured":"R. Uzsoy, C. Y. Lee and L. A. Martin-Vega, \u201cA review of production planning and scheduling models in the semiconductor industry, Part I: System characteristics, performance evaluation, and production planning,\u201d IIE Transactions 24(4), pp. 47\u201360, 1992.","journal-title":"IIE Transactions"},{"issue":"5","key":"337507_CR28","doi-asserted-by":"crossref","first-page":"44","DOI":"10.1080\/07408179408966627","volume":"26","author":"R. Uzsoy","year":"1994","unstructured":"R. Uzsoy, C. Y. Lee, and L. A. Martin-Vega, \u201cA review of production planning and scheduling models in the semiconductor industry, Part II: Shop-floor control,\u201d IIE Transactions 26(5), pp. 44\u201355, 1994.","journal-title":"IIE Transactions"},{"issue":"3","key":"337507_CR29","doi-asserted-by":"crossref","first-page":"115","DOI":"10.1109\/66.4384","volume":"1","author":"L. M. Wein","year":"1988","unstructured":"L. M. Wein, \u201cScheduling semiconductor wafer fabrication,\u201d IEEE Transactions on Semiconductor Manufacturing 1(3), pp. 115\u2013129, 1988.","journal-title":"IEEE Transactions on Semiconductor Manufacturing"},{"key":"337507_CR30","doi-asserted-by":"crossref","first-page":"156","DOI":"10.1109\/66.136277","volume":"5","author":"L. M. Wein","year":"1992","unstructured":"L. M. Wein, \u201cOn the relationship between yield and cycle time in semiconductor wafer fabrication,\u201d IEEE Transactions on Semiconductor Manufacturing 5, pp. 156\u2013158, 1992.","journal-title":"IEEE Transactions on Semiconductor Manufacturing"}],"container-title":["Journal of Systems Integration"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1023\/A:1011297726485.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1023\/A:1011297726485\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1023\/A:1011297726485.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,7,4]],"date-time":"2025-07-04T12:56:04Z","timestamp":1751633764000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1023\/A:1011297726485"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2001,7]]},"references-count":30,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2001,7]]}},"alternative-id":["337507"],"URL":"https:\/\/doi.org\/10.1023\/a:1011297726485","relation":{},"ISSN":["0925-4676","1573-8787"],"issn-type":[{"value":"0925-4676","type":"print"},{"value":"1573-8787","type":"electronic"}],"subject":[],"published":{"date-parts":[[2001,7]]}}}