{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,5,19]],"date-time":"2025-05-19T04:02:11Z","timestamp":1747627331369,"version":"3.40.5"},"reference-count":22,"publisher":"Springer Science and Business Media LLC","issue":"1-4","license":[{"start":{"date-parts":[[2001,10,1]],"date-time":"2001-10-01T00:00:00Z","timestamp":1001894400000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2001,10,1]],"date-time":"2001-10-01T00:00:00Z","timestamp":1001894400000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Annals of Operations Research"],"published-print":{"date-parts":[[2001,10]]},"DOI":"10.1023\/a:1014942830746","type":"journal-article","created":{"date-parts":[[2002,12,28]],"date-time":"2002-12-28T21:55:50Z","timestamp":1041112550000},"page":"83-100","source":"Crossref","is-referenced-by-count":2,"title":["Short-Term Capacity Adjustment with Offline Production for a Flexible Manufacturing System under Abnormal Disturbances"],"prefix":"10.1007","volume":"107","author":[{"given":"Renato","family":"de Matta","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Vernon","family":"Ning Hsu","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Chang-Xue","family":"Feng","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","reference":[{"key":"399510_CR1","doi-asserted-by":"crossref","first-page":"319","DOI":"10.1007\/BF02023747","volume":"3","author":"J.C. Ammons","year":"1985","unstructured":"J.C. Ammons, C.B. Lofgren and L.F. McGinnis, A large scale work station loading problem, Annals of Operations Research 3 (1985) 319\u2013332.","journal-title":"Annals of Operations Research"},{"key":"399510_CR2","doi-asserted-by":"crossref","first-page":"1316","DOI":"10.1287\/mnsc.32.10.1316","volume":"23","author":"M. Berrada","year":"1986","unstructured":"M. Berrada and K.E. Stecke, A branch and bound approach for machine load balancing in flexible manufacturing systems, Management Science 23 (1986) pp. 1316\u20131335.","journal-title":"Management Science"},{"key":"399510_CR3","unstructured":"A.K. Chakravarty and A. Shtub, Selecting parts and loading flexible manufacturing systems, in: Proceedings of the First ORSA\/TIMS Special Interest Conference on Flexible Manufacturing Systems, eds. K.E. Stecke and R. Suri, Ann Arbor, MI (August 1984) 284-289."},{"key":"399510_CR4","doi-asserted-by":"crossref","first-page":"1104","DOI":"10.1287\/opre.38.6.1104","volume":"38","author":"M. Daskin","year":"1990","unstructured":"M. Daskin, P. Jones and T. Lowe, Rationalizing tool selection in a flexible manufacturing system for sheet-metal products, Operations Research 38 (1990) 1104\u20131115.","journal-title":"Operations Research"},{"key":"399510_CR5","doi-asserted-by":"crossref","first-page":"992","DOI":"10.1287\/opre.26.6.992","volume":"26","author":"D. Erlenkotter","year":"1978","unstructured":"D. Erlenkotter, A dual based procedure for uncapacitated facility location, Operations Research 26 (1978) 992\u20131009.","journal-title":"Operations Research"},{"key":"399510_CR6","doi-asserted-by":"crossref","first-page":"269","DOI":"10.1007\/BF02241754","volume":"28","author":"D. Fayard","year":"1982","unstructured":"D. Fayard and G. Plateau, An algorithm for the solution of the 0-1 knapsack problem, Computing 28 (1982) 269\u2013287.","journal-title":"Computing"},{"key":"399510_CR7","volume-title":"Computers and Intractability: A Guide to the Theory of NP-Completeness","author":"M.R. Garey","year":"1979","unstructured":"M.R. Garey and D.S. Johnson, Computers and Intractability: A Guide to the Theory of NP-Completeness (Freeman, New York, 1979)."},{"key":"399510_CR8","doi-asserted-by":"crossref","first-page":"82","DOI":"10.1007\/BFb0120690","volume":"2","author":"A.M. Geoffrion","year":"1974","unstructured":"A.M. Geoffrion, Lagrangian relaxation approaches for integer programming, Mathematical Programming Study, 2 (1974) 82\u2013114.","journal-title":"Mathematical Programming Study"},{"key":"399510_CR9","first-page":"67","volume":"1","author":"S. Graves","year":"1988","unstructured":"S. Graves, Safety stocks in manufacturing systems, Journal of Manufacturing and Operations Management 1 (1988) 67\u2013101.","journal-title":"Journal of Manufacturing and Operations Management"},{"key":"399510_CR10","doi-asserted-by":"crossref","first-page":"62","DOI":"10.1007\/BF01580223","volume":"6","author":"M. Held","year":"1974","unstructured":"M. Held, P. Wolfe and H.P. Crowder, Validation of subgradient optimization, Mathematical Programming 6 (1974) 62\u201388.","journal-title":"Mathematical Programming"},{"key":"399510_CR11","doi-asserted-by":"crossref","first-page":"417","DOI":"10.1080\/07408179508936758","volume":"27","author":"V.N. Hsu","year":"1995","unstructured":"V.N. Hsu, M. Daskin, P.C. Jones and T.J. Lowe, Tool selection for optimal part production: a Lagrangian relaxation approach, IIE Transactions 27 (1995) 417\u2013426.","journal-title":"IIE Transactions"},{"key":"399510_CR12","doi-asserted-by":"crossref","first-page":"31","DOI":"10.1023\/A:1007925809798","volume":"9","author":"V.N. Hsu","year":"1997","unstructured":"V.N. Hsu and R. de Matta, An efficient approach to recognize the infeasibility of a loading problem, The International Journal of Flexible Manufacturing Systems 9 (1997) 31\u201350.","journal-title":"The International Journal of Flexible Manufacturing Systems"},{"key":"399510_CR13","doi-asserted-by":"crossref","unstructured":"L. Huang, J.Q. Hu and P. Vakili, Optimal control of a failure prone manufacturing system with the possibility of temporary increase in production capacity, in: Recent Advances in Control and Optimization of Manufacturing Systems (Springer, 1996) pp. 31-60.","DOI":"10.1007\/BFb0015113"},{"key":"399510_CR14","doi-asserted-by":"crossref","unstructured":"U.S. Karmarkar, Manufacturing lead time, order release and capacity loading, in: Logistics of Production and Inventory (North-Holland, 1993) pp. 287-329.","DOI":"10.1016\/S0927-0507(05)80186-0"},{"key":"399510_CR15","doi-asserted-by":"crossref","first-page":"361","DOI":"10.1007\/BF01324801","volume":"6","author":"Y. Kim","year":"1994","unstructured":"Y. Kim and C.A. Yano, A new branch and bound algorithm for loading problems in flexible manufacturing systems, International Journal of Flexible Manufacturing Systems 6 (1994) 361\u2013381.","journal-title":"International Journal of Flexible Manufacturing Systems"},{"key":"399510_CR16","doi-asserted-by":"crossref","first-page":"666","DOI":"10.1287\/opre.39.4.666","volume":"39","author":"P. Kouvelis","year":"1991","unstructured":"P. Kouvelis and H.L. Lee, Block angular structures and the loading problem in flexible manufacturing systems, Operations Research 39 (1991) pp. 666\u2013676.","journal-title":"Operations Research"},{"key":"399510_CR17","unstructured":"Optimization Subroutine Library (1992) (SC23-0519-03), IBM Corporation."},{"key":"399510_CR18","doi-asserted-by":"crossref","first-page":"1081","DOI":"10.1080\/00207548708919897","volume":"7","author":"S.C. Sarin","year":"1987","unstructured":"S.C. Sarin and C.S. Chen, The machine loading and tool allocation problem in a flexible manufacturing system, International Journal of Production Research 7 (1987) 1081\u20131094.","journal-title":"International Journal of Production Research"},{"key":"399510_CR19","doi-asserted-by":"crossref","first-page":"273","DOI":"10.1287\/mnsc.29.3.273","volume":"29","author":"K.E. Stecke","year":"1983","unstructured":"K.E. Stecke, Formulation and solution of nonlinear integer production planning problems for flexible manufacturing systems, Management Science 29 (1983) 273\u2013288.","journal-title":"Management Science"},{"key":"399510_CR20","doi-asserted-by":"crossref","first-page":"369","DOI":"10.1016\/0377-2217(86)90030-5","volume":"24","author":"K.E. Stecke","year":"1985","unstructured":"K.E. Stecke, A hierarchical approach to solving machine grouping and loading problems of flexible manufacturing systems, European Journal of Operational Research 24 (1985) 369\u2013378.","journal-title":"European Journal of Operational Research"},{"key":"399510_CR21","doi-asserted-by":"crossref","first-page":"273","DOI":"10.1016\/0377-2217(92)90357-F","volume":"61","author":"K.E. Stecke","year":"1992","unstructured":"K.E. Stecke, Planning and scheduling approaches to operate a particular FMS, European Journal of Operational Research 61 (1992) 273\u2013291.","journal-title":"European Journal of Operational Research"},{"key":"399510_CR22","doi-asserted-by":"crossref","first-page":"481","DOI":"10.1080\/00207548108956679","volume":"19","author":"K.E. Stecke","year":"1981","unstructured":"K.E. Stecke and J.J. Solberg, Loading and control policies for a flexible manufacturing system, International Journal of Production Research 19 (1981) 481\u2013490.","journal-title":"International Journal of Production Research"}],"container-title":["Annals of Operations Research"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1023\/A:1014942830746.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1023\/A:1014942830746\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1023\/A:1014942830746.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,5,18]],"date-time":"2025-05-18T14:20:13Z","timestamp":1747578013000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1023\/A:1014942830746"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2001,10]]},"references-count":22,"journal-issue":{"issue":"1-4","published-print":{"date-parts":[[2001,10]]}},"alternative-id":["399510"],"URL":"https:\/\/doi.org\/10.1023\/a:1014942830746","relation":{},"ISSN":["0254-5330","1572-9338"],"issn-type":[{"type":"print","value":"0254-5330"},{"type":"electronic","value":"1572-9338"}],"subject":[],"published":{"date-parts":[[2001,10]]}}}