{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,5,18]],"date-time":"2025-05-18T14:40:06Z","timestamp":1747579206716,"version":"3.40.5"},"reference-count":18,"publisher":"Springer Science and Business Media LLC","issue":"1-4","license":[{"start":{"date-parts":[[2002,10,1]],"date-time":"2002-10-01T00:00:00Z","timestamp":1033430400000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2002,10,1]],"date-time":"2002-10-01T00:00:00Z","timestamp":1033430400000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Annals of Operations Research"],"published-print":{"date-parts":[[2002,10]]},"DOI":"10.1023\/a:1021372029962","type":"journal-article","created":{"date-parts":[[2003,3,21]],"date-time":"2003-03-21T01:22:32Z","timestamp":1048209752000},"page":"113-126","source":"Crossref","is-referenced-by-count":26,"title":["Redefining Event Variables for Efficient Modeling of Continuous-Time Batch Processing"],"prefix":"10.1007","volume":"116","author":[{"given":"Siqun","family":"Wang","sequence":"first","affiliation":[]},{"given":"Monique","family":"Guignard","sequence":"additional","affiliation":[]}],"member":"297","reference":[{"issue":"3","key":"5101683_CR1","doi-asserted-by":"crossref","first-page":"245","DOI":"10.1016\/S0166-3615(98)00075-X","volume":"36","author":"F. Bl\u00f6mer","year":"1998","unstructured":"F. Bl\u00f6mer and H.-O. G\u00fcnther, Scheduling of a multi-product batch process in the chemical industry, Comput. Indust. 36(3) (1998) 245-259.","journal-title":"Comput. Indust."},{"key":"5101683_CR2","unstructured":"R.E. Burkard, T. Fortuna and C.A.J. Hurkens, An event-driven model for chemical batch processes, SFB194, Technical University of Graz (2000)."},{"key":"5101683_CR3","unstructured":"M. Guignard and S. Wang, An integer programming model for continuous-time batch processing, OPIM Department Report 00-05-02, University of Pennsylvania (May 2000)."},{"key":"5101683_CR4","doi-asserted-by":"crossref","first-page":"4341","DOI":"10.1021\/ie970927g","volume":"37","author":"M.G. Ierapetritou","year":"1998","unstructured":"M.G. Ierapetritou and C.A. Floudas, Effective continuous-time formulation for short-term scheduling, 1. Multipurpose batch processes, Indust. Engrg. Chem. Res. 37 (1998) 4341-4359.","journal-title":"Indust. Engrg. Chem. Res."},{"key":"5101683_CR5","doi-asserted-by":"crossref","first-page":"4360","DOI":"10.1021\/ie9709289","volume":"37","author":"M.G. Ierapetritou","year":"1998","unstructured":"M.G. Ierapetritou and C.A. Floudas, Effective continuous-time formulation for short-term scheduling, 2. Continuous and semicontinuous processes, Indust. Engrg. Chem. Res. 37 (1998) 4360-4374.","journal-title":"Indust. Engrg. Chem. Res."},{"key":"5101683_CR6","doi-asserted-by":"crossref","first-page":"211","DOI":"10.1016\/0098-1354(93)80015-F","volume":"17","author":"E. Kondili","year":"1993","unstructured":"E. Kondili, C.C. Pantelides and R.W.H. Sargent, A general algorithm for short-term scheduling of batch operations-I. MILP formulation, Comput. Chem. Engrg. 17 (1993) 211-227.","journal-title":"Comput. Chem. Engrg."},{"key":"5101683_CR7","doi-asserted-by":"crossref","first-page":"665","DOI":"10.1016\/S0098-1354(01)00663-9","volume":"25","author":"X. Lin","year":"2001","unstructured":"X. Lin and C.A. Floudas, Design, synthesis and scheduling of multipurpose batch plants via an effective continuous-time formulation, Comput. Chem. Engrg. 25 (2001) 665-674.","journal-title":"Comput. Chem. Engrg."},{"key":"5101683_CR8","unstructured":"Y.-C. Luo and M. Guignard, A job shop problem in the process industry, OPIM Department Report 97-08-05, University of Pennsylvania (August 1997)."},{"key":"5101683_CR9","doi-asserted-by":"crossref","first-page":"1147","DOI":"10.1016\/S0098-1354(96)00325-0","volume":"21","author":"L. Mockus","year":"1997","unstructured":"L. Mockus and G.V. Reklaitis, Mathematical programming formulation for scheduling of batch operations based on nonuniform time discretization, Comput. Chem. Engrg. 21 (1997) 1147-1156.","journal-title":"Comput. Chem. Engrg."},{"issue":"1","key":"5101683_CR10","doi-asserted-by":"crossref","first-page":"55","DOI":"10.1111\/j.1475-3995.1997.tb00062.x","volume":"4","author":"L. Mockus","year":"1997","unstructured":"L. Mockus and G. Reklaitis, Bayesian approach to batch process scheduling, Internat. Trans. Oper. Res. 4(1) (1997) 55-65.","journal-title":"Internat. Trans. Oper. Res."},{"key":"5101683_CR11","unstructured":"H. Qian, Oral communication (November 2000)."},{"key":"5101683_CR12","unstructured":"S. Wang, Short term scheduling for chemical industries, OPIM Department Summer Research Paper, University of Pennsylvania (August 1998)."},{"key":"5101683_CR13","unstructured":"S. Wang and M. Guignard, A continuous time model for short term scheduling in batch processing, OPIM Department Report 99-11-01, University of Pennsylvania (November 1999)."},{"key":"5101683_CR14","unstructured":"S. Wang and M. Guignard, Integer programming approaches for batch sizing and scheduling, OPIM Department Report 01-11-02, University of Pennsylvania (November 2001)."},{"key":"5101683_CR15","series-title":"Working paper","volume-title":"Formulation of a job shop problem in process industry","author":"H. Westenberger","year":"1994","unstructured":"H. Westenberger and J. Kallrath, Formulation of a job shop problem in process industry, Working paper, Bayer AG, Leverkusen and BASF AG, Ludwigshafen, Germany (1994)."},{"key":"5101683_CR16","unstructured":"Z. Xueya and R.W.H. Sargent, A new unified formulation for process scheduling, in: AIChE Annual Meeting, St. Louis, MO (1993)."},{"key":"5101683_CR17","unstructured":"H. Yan, M. Guignard, K. Spielberg and Y.C. Luo, A job shop problem in the process industry, in: INFORMS Meeting, Dallas (1997)."},{"key":"5101683_CR18","unstructured":"M.G. Zentner and G.V. Reklaitis, An interval-based mathematical model for the scheduling of resource-constrained batch chemical processes, in: Proceedings of NATO ASI on Batch Processing Systems Engineering, Antalya, Turkey (1992)."}],"container-title":["Annals of Operations Research"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1023\/A:1021372029962.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1023\/A:1021372029962\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1023\/A:1021372029962.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,5,18]],"date-time":"2025-05-18T14:09:43Z","timestamp":1747577383000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1023\/A:1021372029962"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2002,10]]},"references-count":18,"journal-issue":{"issue":"1-4","published-print":{"date-parts":[[2002,10]]}},"alternative-id":["5101683"],"URL":"https:\/\/doi.org\/10.1023\/a:1021372029962","relation":{},"ISSN":["0254-5330","1572-9338"],"issn-type":[{"type":"print","value":"0254-5330"},{"type":"electronic","value":"1572-9338"}],"subject":[],"published":{"date-parts":[[2002,10]]}}}