{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,10,3]],"date-time":"2026-10-03T21:02:15Z","timestamp":1791061335930,"version":"4.1.0"},"reference-count":36,"publisher":"EDP Sciences","issue":"4","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["RAIRO-Oper. Res."],"published-print":{"date-parts":[[2012,10]]},"DOI":"10.1051\/ro\/2012020","type":"journal-article","created":{"date-parts":[[2012,12,10]],"date-time":"2012-12-10T10:49:57Z","timestamp":1355136597000},"page":"335-353","source":"Crossref","is-referenced-by-count":19,"title":["New algorithms for coupled tasks scheduling \u2013 a survey"],"prefix":"10.1051","volume":"46","author":[{"given":"Jacek","family":"Blazewicz","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Grzegorz","family":"Pawlak","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Michal","family":"Tanas","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Wojciech","family":"Wojciechowicz","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"250","published-online":{"date-parts":[[2012,12,10]]},"reference":[{"key":"R1","unstructured":"Ageev A.A. and Baburin A.E., Approximation algorithms for uet scheduling problems with exact delays.Oper. Res. Lett.35(2007) 533\u2013540."},{"key":"R2","unstructured":"Ahr D., Bekesi J., Galambos G., Oswald M. and Reinelt G., An exact algorithm for scheduling identical coupled tasks.Math. Methods Oper. Res.59(2004) 193\u2013203."},{"key":"R3","unstructured":"K. Baker,Introduction to Sequencing and Scheduling. J. Wiley, New York (1974)."},{"key":"R4","unstructured":"Baptiste P., A note on scheduling identical coupled tasks in logarithmic time.Disc. Appl. Math.158(2010) 583\u2013587."},{"key":"R5","unstructured":"Bekesi J., Galambos G., Oswald M. and Reinelt G., Improved analysis of an algorithm for the coupled task problem with uet jobs.Oper. Res. Lett.37(2009) 93\u201396."},{"key":"R6","unstructured":"Blazewicz J., Dell\u2019Olmo P., Drozdowski M. and Speranza M.G., Scheduling multiprocessor tasks on three dedicated processors.Inform. Process. Lett.41(1992) 275\u2013280."},{"key":"R7","unstructured":"Blazewicz J., Drabowski M. and Weglarz J., Scheduling independent 2-processors tasks to minimize schedule length.Inf. Process. Lett.18(1984) 267\u2013273."},{"key":"R8","doi-asserted-by":"crossref","unstructured":"Blazewicz J., Ecker K., Kis T., Potts C.N., Tanas M. and Whitehead J., Scheduling of coupled tasks with unit processing times.J. sched.13(2010) 453\u2013461.","DOI":"10.1007\/s10951-010-0167-z"},{"key":"R9","doi-asserted-by":"crossref","unstructured":"Blazewicz J., Ecker K., Kis T. and Tanas M., A note on the complexity of scheduling coupled tasks on a single processor.J. Brazil. Comput. Soc.7(2002) 23\u201327.","DOI":"10.1590\/S0104-65002001000200004"},{"key":"R10","unstructured":"J. Blazewicz, K. Ecker, E. Pesch, G. Schmidt and J. Weglarz,Handbook of Scheduling. From Theory to Applications.Springer Verlag (2007)."},{"key":"R11","doi-asserted-by":"crossref","unstructured":"Blazewicz J., Pawlak G. and Walter B., Scheduling production tasks in a two stage FMS.Int. J. Prod. Res.40(2002) 4341\u20134352.","DOI":"10.1080\/00207540210159608"},{"key":"R12","unstructured":"Brauner N., Finke G., Lehoux-Lebacque V., Potts C. and Whitehead J., Scheduling of coupled tasks and one-machine no-wait robotic cells.Comput. Oper. Res.36(2009) 301\u2013307."},{"key":"R13","doi-asserted-by":"crossref","unstructured":"P. Brucker,Scheduling Algorithms. Springer Verlag, Berlin, 3rd edition (2001).","DOI":"10.1007\/978-3-662-04550-3"},{"key":"R14","doi-asserted-by":"crossref","unstructured":"Brucker P. and Knust S., Complexity results for single-machine problems with positive finish-start time-lags.Osnabr\u00fcck Schriften zur Mathematik202(1998) 299\u2013316.","DOI":"10.1007\/s006070050036"},{"key":"R15","unstructured":"Ecker K. and Tanas M., Complexity of scheduling of coupled tasks with chains precedence constraints and constant even length of the gap.Found. Comput. Decision Sci.32(2007) 199\u2013212."},{"key":"R16","doi-asserted-by":"crossref","unstructured":"Ecker K. and Tanas M., Complexity of scheduling of coupled tasks with chains precedence constraints and constant even length of the gap.J. Oper. Res. Soc.63(2012) 524\u2013529.","DOI":"10.1057\/jors.2011.32"},{"key":"R17","unstructured":"Elshafei M., Sherali H.D. and Smith J.C., Radar pulse interleaving for multi-target tracking.Naval Res. Logist.51(2004) 79\u201394."},{"key":"R18","doi-asserted-by":"crossref","unstructured":"Farina A. and Neri P., Multitarget interleaved tracking for phased array radar.IEEE Proc. Part F : Comm. Radar Signal Process127(1980) 312\u2013318.","DOI":"10.1049\/ip-f-1.1980.0046"},{"key":"R19","doi-asserted-by":"crossref","unstructured":"Graham R.L., Lawler E.L., Lenstra J.K. and Rinnooy Kan A.H.G., Optimization and approximation in deterministic sequencing and scheduling : A survey.Ann. Discrete Math.5(1979) 287\u2013326.","DOI":"10.1016\/S0167-5060(08)70356-X"},{"key":"R20","unstructured":"J.N.D. Gupta,Single facility scheduling with two operations per job and time-lags. Technical Paper (1994)."},{"key":"R21","doi-asserted-by":"crossref","unstructured":"Gupta J.N.D., Comparative evaluation of heuristic algorithms for the single machine scheduling problem with two operations per job and time-lags.J. Glob. Optim.9(1996) 239\u201350.","DOI":"10.1007\/BF00121674"},{"key":"R22","unstructured":"Heinselman P.L., Preignitz D.L., Manross K.L. and Smith T.M. and Adams R.W., Rapid sampling of severe storms by the national weather radar testbed phased array radar.Weather Forecast.23(2008) 808\u2013824."},{"key":"R23","doi-asserted-by":"crossref","unstructured":"A. Izquierdo-Fuente and J.R. Casar-Corredera. Optimal radar pulse scheduling using neural networks. InIEEE International Conference on Neural Networks7(1994) 4588\u20134591.","DOI":"10.1109\/ICNN.1994.375014"},{"key":"R24","unstructured":"Lehoux-Lebacque V., Brauner N. and Finke G., Identical coupled tasks scheduling : polynomial complexity of the cyclic case.Les Cahiers Leibnitz179(2009)."},{"key":"R25","doi-asserted-by":"crossref","unstructured":"J. Leung, editor.Handbook of Scheduling. Chapman and Hall (2004).","DOI":"10.1201\/9780203489802"},{"key":"R26","unstructured":"McNaughton R., Scheduling with deadlines and loss functions.Manage. Sci.6(1959) 1\u201312."},{"key":"R27","unstructured":"Orman A.J. and Potts C.N., On the complexity of coupled tasks scheduling.Disc. Appl. Math.72(1997) 141\u2013154."},{"key":"R28","doi-asserted-by":"crossref","unstructured":"Orman A.J., Potts C.N., Shahani A.K. and Moore A.R., Scheduling for the control of a multifunctional radar system.Eur. J. Oper. Res.90(1996) 13\u201325.","DOI":"10.1016\/0377-2217(95)00307-X"},{"key":"R29","unstructured":"Orman A.J., Shahani A.K. and Moore A.R., Modelling for the control of a complex radar system.Comput. Oper. Res.25(1998) 239\u2013249."},{"key":"R30","doi-asserted-by":"crossref","unstructured":"Potts C.N. and Whitehead J.D., Heuristics for a coupled-operation scheduling problem.J. Oper. Res. Soc.58(2007) 1375\u20131388.","DOI":"10.1057\/palgrave.jors.2602272"},{"key":"R31","doi-asserted-by":"crossref","unstructured":"Shapiro R.D., Scheduling coupled tasks.Nav. Res. Logist. Quart.27(1980) 477\u2013481.","DOI":"10.1002\/nav.3800270311"},{"key":"R32","unstructured":"M.I. Skolnik,Introduction to Radar Systems. McGraw Hill, London (1980)."},{"key":"R33","unstructured":"M. Tanas,Scheduling of Coupled Tasks. PhD thesis, Technische Universitat Clausthal (2004)."},{"key":"R34","unstructured":"J.D. Whitehead,Scheduling and layout in flexible manufacturing systems. Ph.D. thesis, University of Southampton (2002)."},{"key":"R35","unstructured":"W. Yu,The Two-machine Flow Shop Problem with Delays and the One-machine Total Tardiness Problem Ph.D. Thesis. Technische Universiteit Eindhoven (1996)."},{"key":"R36","doi-asserted-by":"crossref","unstructured":"Yu W., Hoogeveen H. and Lenstra J.K., Minimizing makespan in a two-machine flow shop with delays and unit-time operations is np-hard.J. Sched.7(2004) 333\u2013348.","DOI":"10.1023\/B:JOSH.0000036858.59787.c2"}],"container-title":["RAIRO - Operations Research"],"original-title":[],"link":[{"URL":"http:\/\/www.rairo-ro.org\/10.1051\/ro\/2012020\/pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,4,23]],"date-time":"2025-04-23T13:14:50Z","timestamp":1745414090000},"score":1,"resource":{"primary":{"URL":"http:\/\/www.rairo-ro.org\/10.1051\/ro\/2012020"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2012,10]]},"references-count":36,"journal-issue":{"issue":"4"},"alternative-id":["ro120020"],"URL":"https:\/\/doi.org\/10.1051\/ro\/2012020","relation":{},"ISSN":["0399-0559","1290-3868"],"issn-type":[{"value":"0399-0559","type":"print"},{"value":"1290-3868","type":"electronic"}],"subject":[],"published":{"date-parts":[[2012,10]]}}}