{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,8,26]],"date-time":"2026-08-26T04:47:25Z","timestamp":1787719645071,"version":"build-2784847793"},"reference-count":26,"publisher":"EDP Sciences","issue":"1","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["RAIRO-Oper. Res."],"published-print":{"date-parts":[[2015,1]]},"DOI":"10.1051\/ro\/2014028","type":"journal-article","created":{"date-parts":[[2014,12,16]],"date-time":"2014-12-16T15:57:28Z","timestamp":1418745448000},"page":"79-98","source":"Crossref","is-referenced-by-count":8,"title":["Activities planning and resources assignment on distinct places: a mathematical model"],"prefix":"10.1051","volume":"49","author":[{"given":"Michel","family":"Gourgand","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Nathalie","family":"Grangeon","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Nathalie","family":"Klement","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"250","published-online":{"date-parts":[[2014,12,17]]},"reference":[{"key":"R1","unstructured":"R.H. Ballou,Business logistics management. Prentice Hall, Englewood Cliffs, NJ (1992)."},{"key":"R2","unstructured":"Bellenguez O. and N\u00e9ron E., Lower bounds for the multi-skill project scheduling problem with hierarchical levels of skills.Lect. Notes Comput. Sci.3616(2005) 229\u2013243."},{"key":"R3","doi-asserted-by":"crossref","unstructured":"Bergh J., Belin J., De Bruecker P., Demeulemeester E. and De Boeck L., Personnel scheduling: a literature review.Eur. J. Oper. Res.226(2013) 367\u2013385.","DOI":"10.1016\/j.ejor.2012.11.029"},{"key":"R4","doi-asserted-by":"crossref","unstructured":"Blazewicz J., J.K. Lenstra and A.H.G. Rinnooy Kan, Scheduling subject to resource constraints: classification and complexity.Discrete Appl. Math.5(1983) 11\u201324.","DOI":"10.1016\/0166-218X(83)90012-4"},{"key":"R5","doi-asserted-by":"crossref","unstructured":"Cardoen B., Demeulemeester E. and Beli\u00ebn J., Operating room planning and scheduling: A literature review.Eur. J. Oper. Res.201(2010) 921\u2013932.","DOI":"10.1016\/j.ejor.2009.04.011"},{"key":"R6","doi-asserted-by":"crossref","unstructured":"Chaabane S., Meskens N., Guinet A. and Laurent M., Comparison of two methods of operating theater planning: application in Belgian hospital.J. Syst. Sci. Syst. Engrg.17(2008) 171\u2013186.","DOI":"10.1007\/s11518-008-5074-x"},{"key":"R7","doi-asserted-by":"crossref","unstructured":"M. Chabrol, M. Gourgand and S. Rodier, A modeling methodology and its application to the design of decision-making aid tools for the hospital systems, inProc. of IEEE Int. Conf. on Research Challenges in Information Science (RCIS), Marrakech, Morocco (2008) 161\u2013172.","DOI":"10.1109\/RCIS.2008.4632103"},{"key":"R8","unstructured":"Choi S. and Wilhelm W., On capacity allocation for operating rooms.Comput. Oper. Res.44(2014) 174\u2013184."},{"key":"R9","doi-asserted-by":"crossref","unstructured":"Coello C., An updated survey of GA-based multiobjective optimization techniques.ACM Computing Surveys (CSUR)32(2000) 109\u2013143.","DOI":"10.1145\/358923.358929"},{"key":"R10","doi-asserted-by":"crossref","first-page":"207","DOI":"10.1109\/TSMCC.2003.814036","volume":"33","author":"Dauz\u00e8re-P\u00e9r\u00e8s","year":"2003","journal-title":"IEEE Trans. Syst. Man Cybern., Part C: Appl. Rev."},{"key":"R11","doi-asserted-by":"crossref","unstructured":"Dauz\u00e8re-P\u00e9r\u00e8s S., Roux W. and Lasserre J.B., Multi-resource shop scheduling with resource flexibility.Eur. J. Oper. Res.107(1998) 289\u2013305.","DOI":"10.1016\/S0377-2217(97)00341-X"},{"key":"R12","unstructured":"Denton B., Viapiano J. and Vogl A., Optimization of surgery sequencing and scheduling decisions under uncertainty.Health Care Manage. Sci.10(2007) 13\u201328."},{"key":"R13","unstructured":"M. Ehrgott,A characterization of lexicographic max-ordering solutions. Technische Universit\u00e4t Kaiserslautern, Fachbereich Mathematik (1999)."},{"key":"R14","unstructured":"Everett J., A decision support simulation model for the management of an elective surgery waiting system.Health Care Manage. Sci.5(2002) 89\u201395."},{"key":"R15","doi-asserted-by":"crossref","unstructured":"Gartner D. and Kolisch R., Scheduling the hospital-wide flow of elective patients.Eur. J. Oper. Res.233(2014) 689\u2013699.","DOI":"10.1016\/j.ejor.2013.08.026"},{"key":"R16","unstructured":"V. Giard,Gestion de la production et des flux. Production et techniques quantitatives appliqu\u00e9es \u00e0 la gestion. Economica (2003)."},{"key":"R17","unstructured":"M. Gourgand, N. Grangeon and S. Norre, Assembly Shop Scheduling, inResource-constrained project scheduling: Models, algorithms, extensions and applications, Wiley Online Library (2010) 227\u2013242."},{"key":"R18","unstructured":"M. Gourgand and P. Kellert, Conception d\u2019un environnement de mod\u00e9lisation des syst\u00e8mes de production, inProc. of 3econgr\u00e8s international de g\u00e9nie industriel, Tours, France (1991)."},{"key":"R19","unstructured":"Haimes Y., Lasdon L. and Wismer D., Bicriterion formulation of the problems of integrated system identification and system optimization.IEEE Trans. Syst. Man Cybern.1(1971) 296-297."},{"key":"R20","doi-asserted-by":"crossref","unstructured":"Hartmann S. and Briskorn D., A survey of variants and extensions of the resource-constrained project scheduling problem.Eur. J. Oper. Res.207(2010) 1\u201314.","DOI":"10.1016\/j.ejor.2009.11.005"},{"key":"R21","doi-asserted-by":"crossref","unstructured":"Lamiri M., Grimaud F. and Xie X., Optimization methods for a stochastic surgery planning problem.Int. J. Prod. Econ.120(2009) 400\u2013410.","DOI":"10.1016\/j.ijpe.2008.11.021"},{"key":"R22","doi-asserted-by":"crossref","unstructured":"Laumanns M., Thiele L. and Zitzler E., An efficient, adaptive parameter variation scheme for metaheuristics based on the epsilon-constraint method.Eur. J. Oper. Res.169(2006) 932\u2013942.","DOI":"10.1016\/j.ejor.2004.08.029"},{"key":"R23","unstructured":"Santib\u00e1\u00f1ez P., Begen M. and Atkins D., Surgical block scheduling in a system of hospitals: an application to resource and wait list management in a British Columbia health authority.Health Care Manage. Sci.10(2007) 269\u2013282."},{"key":"R24","doi-asserted-by":"crossref","unstructured":"Sprecher A. and Drexl A., Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm.Eur. J. Oper. Res.107(1998) 431\u2013450.","DOI":"10.1016\/S0377-2217(97)00348-2"},{"key":"R25","doi-asserted-by":"crossref","unstructured":"Weglarz J., Jozefowska J., Mika M. and Waligora G., Project Scheduling with finite or infinite number of activity processing modes: a survey.Eur. J. Oper. Res.208(2011) 177\u2013205.","DOI":"10.1016\/j.ejor.2010.03.037"},{"key":"R26","doi-asserted-by":"crossref","unstructured":"Zamani R., A competitive magnet-based genetic algorithm for solving the resource-constrained project scheduling problem.Eur. J. Oper. Res.209(2013) 552\u2013559.","DOI":"10.1016\/j.ejor.2013.03.005"}],"container-title":["RAIRO - Operations Research"],"original-title":[],"link":[{"URL":"http:\/\/www.rairo-ro.org\/10.1051\/ro\/2014028\/pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,8,18]],"date-time":"2019-08-18T13:55:49Z","timestamp":1566136549000},"score":1,"resource":{"primary":{"URL":"http:\/\/www.rairo-ro.org\/10.1051\/ro\/2014028"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2014,12,17]]},"references-count":26,"journal-issue":{"issue":"1"},"alternative-id":["ro140028"],"URL":"https:\/\/doi.org\/10.1051\/ro\/2014028","relation":{},"ISSN":["0399-0559","1290-3868"],"issn-type":[{"value":"0399-0559","type":"print"},{"value":"1290-3868","type":"electronic"}],"subject":[],"published":{"date-parts":[[2014,12,17]]}}}