{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,6,1]],"date-time":"2025-06-01T04:10:38Z","timestamp":1748751038894,"version":"3.41.0"},"reference-count":26,"publisher":"EDP Sciences","issue":"3","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["RAIRO-Oper. Res."],"published-print":{"date-parts":[[2016,7]]},"DOI":"10.1051\/ro\/2015029","type":"journal-article","created":{"date-parts":[[2015,11,13]],"date-time":"2015-11-13T07:36:23Z","timestamp":1447400183000},"page":"491-501","source":"Crossref","is-referenced-by-count":12,"title":["On the Berth Allocation Problem"],"prefix":"10.1051","volume":"50","author":[{"given":"Shaikha Ahmed Jumaa","family":"Alzaabi","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Ali","family":"Diabat","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"250","published-online":{"date-parts":[[2016,5,27]]},"reference":[{"key":"R1","doi-asserted-by":"crossref","unstructured":"Al-Dhaheri N. and Diabat A., The Quay Crane Scheduling Problem.J. Manuf. Syst.36(2015) 87\u201394.","DOI":"10.1016\/j.jmsy.2015.02.010"},{"key":"R2","doi-asserted-by":"crossref","unstructured":"N. Al-Dhaheri and A. Diabat, A Lagrangian-relaxation-based heuristic for the multiship quay crane scheduling problem with ship stability constraints. To appear inAnn. Oper. Res.(2016).","DOI":"10.1007\/s10479-016-2239-8"},{"key":"R3","unstructured":"Al-Dhaheri N., Jebali A. and Diabat A., The quay crane scheduling problem with nonzero crane repositioning time and vessel stability constraints.Comput. Ind. Eng.94(2016) 230\u2013244."},{"key":"R4","doi-asserted-by":"crossref","unstructured":"Al-Dhaheri N., Jebali A. and Diabat A., A simulation based Genetic Algorithm approach for the Quay Crane Scheduling under uncertainty.Simul. Model. Pract. Theory66(2016) 122\u2013138.","DOI":"10.1016\/j.simpat.2016.01.009"},{"key":"R5","doi-asserted-by":"crossref","unstructured":"J. Al Hammadi and A. Diabat, An Integrated Berth Allocation and Yard Assignment Problem for Bulk Ports: Formulation and Case Study. To appear inRAIRO: RO(2016). DOI:10.1051\/ro\/2015048","DOI":"10.1051\/ro\/2015048"},{"key":"R6","doi-asserted-by":"crossref","unstructured":"Bierwirth C. and Meisel F., A follow-up survey of berth allocation and quay crane scheduling problems in container terminals.Eur. J. Oper. Res.244(2015) 675\u2013689.","DOI":"10.1016\/j.ejor.2014.12.030"},{"key":"R7","unstructured":"Diabat A. and Theodorou E., An Integrated Quay Crane Assignment and Scheduling Problem.Comput. Ind. Eng.73(2014) 115\u2013123."},{"key":"R8","unstructured":"Du Y., Chen Q., Quan X., Long L. and Fung R.Y.K., Berth allocation considering fuel consumption and vessel emissions.Transp. Res. Part E Logist. Transp. Rev.47(2011) 1021\u20131037."},{"key":"R9","unstructured":"Fu Y.-M. and Diabat A., A Lagrangian relaxation approach for solving the integrated quay crane assignment and scheduling problem.Appl. Math. Model.39(2015) 1194\u20131201."},{"key":"R10","unstructured":"Fu Y.-M., Diabat A. and Tsai I.-T., A multi-vessel quay crane assignment and scheduling problem: Formulation and heuristic solution approach.Expert Syst. Appl.41(2014) 6959\u20136965."},{"key":"R11","doi-asserted-by":"crossref","unstructured":"Giallombardo G., Moccia L., Salani M. and Vacca I., Modeling and solving the Tactical Berth Allocation Problem.Transp. Res. Part B44(2010) 232\u2013245.","DOI":"10.1016\/j.trb.2009.07.003"},{"key":"R12","doi-asserted-by":"crossref","unstructured":"Golias M.M., Boile M. and Theofanis S., Berth scheduling by customer service differentiation: A multi-objective approach.Transp. Res. Part E45(2009) 878\u2013892.","DOI":"10.1016\/j.tre.2009.05.006"},{"key":"R13","unstructured":"Hu Q.-M., Hu Z.-H. and Du Y., Berth and quay-crane allocation problem considering fuel consumption and emissions from vessels.Comput. Ind. Eng.70(2014) 1\u201310."},{"key":"R14","doi-asserted-by":"crossref","unstructured":"Imai A., Nagaiwa K. and Tat C.W., Efficient planning of berth allocation for container terminals in Asia.J. Adv. Transp.31(1997) 75\u201394.","DOI":"10.1002\/atr.5670310107"},{"key":"R15","doi-asserted-by":"crossref","unstructured":"Imai A., Nishimura E. and Papadimitriou S., The dynamic berth allocation problem for a container port35(2001) 401\u2013417.","DOI":"10.1016\/S0191-2615(99)00057-0"},{"key":"R16","doi-asserted-by":"crossref","unstructured":"Imai A., Nishimura E. and Papadimitriou S., Berth allocation with service priority.Transp. Res. Part B37(2003) 437\u2013457.","DOI":"10.1016\/S0191-2615(02)00023-1"},{"key":"R17","unstructured":"Kenan N. and Diabat A., A Branch-and-Price Algorithm to Solve a Quay Crane Scheduling Problem.Proc. Comput. Sci.61(2015) 527\u2013532."},{"key":"R18","unstructured":"M. Kr\u010dum, A. Gudelj and S. Vlahinic, Genetic Algorithm for Solving Berth and Quay Cranes Assignment problems, in2nd International Conference on Ports and Waterways(2007) 165\u2013177."},{"key":"R19","doi-asserted-by":"crossref","unstructured":"Meisel F. and Bierwirth C., Heuristics for the integration of crane productivity in the berth allocation problem.Transp. Res. Part E45(2009) 196\u2013209.","DOI":"10.1016\/j.tre.2008.03.001"},{"key":"R20","unstructured":"Monaco M.F. and Sammarra M., The berth allocation problem: a strong formulation solved by a Lagrangean approach.Transp. Sci.41(2007) 25\u2013280."},{"key":"R21","doi-asserted-by":"crossref","unstructured":"W. Schoonenberg, J. Hols and A. Diabat, A Cost Based Approach for a Crane Assignment and Scheduling Problem, inInternational Conference on Industrial Engineering and Systems Management (IESM), October 21\u201323 (2015).","DOI":"10.1109\/IESM.2015.7380227"},{"key":"R22","unstructured":"Simrin A. and Diabat A., The dynamic berth allocation problem: A linearized formulation.RAIRO: RO49(2015) 473\u2013494."},{"key":"R23","doi-asserted-by":"crossref","unstructured":"A.S. Simrin, N.N. Alkawaleet and A.H. Diabat, A Lagrangian Relaxation based Heuristic for the Static Berth Allocation Problem using the Cutting Plane Method, inProceedings of the 15th International Conference on Enterprise Information Systems(2013) 565\u2013569.","DOI":"10.5220\/0004628105650569"},{"key":"R24","unstructured":"Theodorou E. and Diabat A., A Joint Quay Crane Assignment and Scheduling Problem: Formulation, Solution Algorithm and Computational Results.Optim. Lett.9(2015) 799\u2013817."},{"key":"R25","doi-asserted-by":"crossref","unstructured":"Xu D., Li C.-L. and Leung J.Y.-T., Berth allocation with time-dependent physical limitations on vessels.Eur. J. Oper. Res.216(2012) 47\u201356.","DOI":"10.1016\/j.ejor.2011.07.012"},{"key":"R26","unstructured":"Zeng Q., Diabat A. and Zhang Q., A simulation optimization approach for solving the dual-cycling problem in container terminals.Marit. Policy Manag.42(2015) 87\u201394."}],"container-title":["RAIRO - Operations Research"],"original-title":[],"link":[{"URL":"http:\/\/www.rairo-ro.org\/10.1051\/ro\/2015029\/pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,5,31]],"date-time":"2025-05-31T11:39:43Z","timestamp":1748691583000},"score":1,"resource":{"primary":{"URL":"http:\/\/www.rairo-ro.org\/10.1051\/ro\/2015029"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2016,5,27]]},"references-count":26,"journal-issue":{"issue":"3"},"alternative-id":["ro151066"],"URL":"https:\/\/doi.org\/10.1051\/ro\/2015029","relation":{},"ISSN":["0399-0559","1290-3868"],"issn-type":[{"type":"print","value":"0399-0559"},{"type":"electronic","value":"1290-3868"}],"subject":[],"published":{"date-parts":[[2016,5,27]]}}}