{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,1,10]],"date-time":"2026-01-10T02:44:22Z","timestamp":1768013062025,"version":"3.49.0"},"reference-count":55,"publisher":"EDP Sciences","issue":"3","license":[{"start":{"date-parts":[[2018,9,14]],"date-time":"2018-09-14T00:00:00Z","timestamp":1536883200000},"content-version":"vor","delay-in-days":75,"URL":"https:\/\/www.edpsciences.org\/en\/authors\/copyright-and-licensing"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["RAIRO-Oper. Res."],"accepted":{"date-parts":[[2017,10,5]]},"published-print":{"date-parts":[[2018,7]]},"abstract":"<jats:p>This research work deals with an imperfect production system considering the purchasing of raw materials in order to study the economic production quantity (EPQ). This manufacturing system produces perfect and defective finished products; defectives are considered as scrap. A single product is manufactured from multiple raw materials which are purchased from outside suppliers. In the integrated procurement-production-inventory (IPPI) model, one of the principal decisions, in addition to determining the optimal lot size to produce, is to define the number of optimal orders of each raw material with respect to rate of consumption in the manufacturing of finished product. Two cases are considered: without shortage (first model) and with shortage (backordering, second model). In the first model, the purpose is to determine jointly the optimal lot size to manufacture and the optimal number orders of each raw material in order to minimize the total cost. The second model obtains the optimal number of orders of each raw material, the optimal lot size to manufacture and the optimal shortage level with aim to minimize the total cost. This research also shows that both of the proposed inventory models are a convex programming problem, so exact algorithms to solve these inventory problems are proposed.<\/jats:p>","DOI":"10.1051\/ro\/2017067","type":"journal-article","created":{"date-parts":[[2017,10,6]],"date-time":"2017-10-06T07:08:08Z","timestamp":1507273688000},"page":"755-778","source":"Crossref","is-referenced-by-count":13,"title":["Optimal and simple algorithms to solve integrated procurement-production-inventory problem without\/with shortage"],"prefix":"10.1051","volume":"52","author":[{"ORCID":"https:\/\/orcid.org\/0000-0003-4769-4460","authenticated-orcid":false,"given":"Amir Hossein","family":"Nobil","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Leopoldo Eduardo","family":"C\u00e1rdenas\u2013Barr\u00f3n","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0001-5904-5199","authenticated-orcid":false,"given":"Erfan","family":"Nobil","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"250","published-online":{"date-parts":[[2018,9,14]]},"reference":[{"key":"R1","doi-asserted-by":"crossref","first-page":"16","DOI":"10.1016\/j.ijpe.2014.01.013","volume":"155","author":"Andriolo","year":"2014","journal-title":"Int. J. Prod. Econ"},{"key":"R2","doi-asserted-by":"crossref","first-page":"840","DOI":"10.1057\/palgrave.jors.2600586","volume":"49","author":"Ben\u2013Daya","year":"1998","journal-title":"J. Oper. Res. Soc"},{"key":"R3","doi-asserted-by":"crossref","first-page":"257","DOI":"10.1016\/S0925-5273(01)00168-2","volume":"76","author":"Ben\u2013Daya","year":"2002","journal-title":"Int. J. Prod. Econ"},{"key":"R4","doi-asserted-by":"crossref","unstructured":"Benkherouf L., \nSkouri K. and \nKonstantaras I., \nOptimal batch production with rework process for products with time\u2013varying demand over finite planning horizon. \nIn Operations Research, Engineering, and Cyber Security. Springer International Publishing \n(2017) 57\u201368","DOI":"10.1007\/978-3-319-51500-7_3"},{"key":"R5","doi-asserted-by":"crossref","first-page":"260","DOI":"10.1007\/s12597-016-0283-4","volume":"54","author":"Bera","year":"2017","journal-title":"OPSEARCH"},{"key":"R6","unstructured":"C\u00e1rdenas\u2013Barr\u00f3n L.E., \nThe economic production quantity without backlogging derived with algebra, in: Sixth International Conference of the Decision Sciences Institute, Chihuahua, \nMexico \n(2001a)"},{"key":"R7","doi-asserted-by":"crossref","first-page":"289","DOI":"10.1016\/S0925-5273(00)00068-2","volume":"70","author":"C\u00e1rdenas\u2013Barr\u00f3n","year":"2001","journal-title":"Int. J. Prod. Econ"},{"key":"R8","unstructured":"C\u00e1rdenas\u2013Barr\u00f3n L.E., \nOn optimal manufacturing batch size with rework process at single\u2013stage production system. \nComput. Ind. Eng. 53 \n(2007) 196\u2013198"},{"key":"R9","unstructured":"C\u00e1rdenas\u2013Barr\u00f3n L.E., \nOptimal manufacturing batch size with rework in a single\u2013stage production system\u2013a simple derivation. \nComput. Ind. Eng. 55 \n(2008) 758\u2013765"},{"key":"R10","doi-asserted-by":"crossref","first-page":"2394","DOI":"10.1016\/j.apm.2010.11.053","volume":"35","author":"C\u00e1rdenas\u2013Barr\u00f3n","year":"2011","journal-title":"Appl. Math. Model"},{"key":"R11","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/j.ijpe.2014.07.002","volume":"155","author":"C\u00e1rdenas\u2013Barr\u00f3n","year":"2014","journal-title":"Int. J. Prod. Econ"},{"key":"R12","first-page":"359","volume":"230","author":"C\u00e1rdenas\u2013Barr\u00f3n","year":"2014","journal-title":"Appl. Math. Comput"},{"key":"R13","first-page":"582","volume":"36","author":"Eilon","year":"1957","journal-title":"Instit. Prod. Eng. J"},{"key":"R14","doi-asserted-by":"crossref","first-page":"449","DOI":"10.1080\/00207548308942381","volume":"21","author":"Elsayed","year":"1983","journal-title":"Int. J. Prod. Res"},{"key":"R15","first-page":"1660","volume":"216","author":"Garc\u00eda\u2013Laguna","year":"2010","journal-title":"Appl. Math. Comput"},{"key":"R16","doi-asserted-by":"crossref","first-page":"107","DOI":"10.1080\/00207547708943107","volume":"15","author":"Goyal","year":"1977","journal-title":"Int. J. Prod. Res"},{"key":"R17","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/0377-2217(92)90172-6","volume":"62","author":"Goyal","year":"1992","journal-title":"Eur. J. Oper. Res"},{"key":"R18","doi-asserted-by":"crossref","first-page":"755","DOI":"10.1016\/0360-8352(95)00016-T","volume":"28","author":"Goyal","year":"1995","journal-title":"Comput. Ind. Eng"},{"key":"R19","doi-asserted-by":"crossref","first-page":"104","DOI":"10.1287\/mnsc.38.1.104","volume":"38","author":"Groenevelt","year":"1992","journal-title":"Manag. Sci"},{"key":"R20","unstructured":"Grubbstr\u00f6m R.W., Material requirements planning and manufacturing resource planning, edited by \nWarner M.. \nInternational Encyclopedia of Business and Management, \nRoutledge, \nLondon \n(1996)"},{"key":"R21","unstructured":"Hadley G. and \nWhitin T.M., Analysis of Inventory Systems, \nPrentice-Hall, \nEnglewood Cliffs, \nNJ \n(1963)"},{"key":"R22","doi-asserted-by":"crossref","first-page":"230","DOI":"10.1007\/s11518-008-5077-7","volume":"17","author":"Haji","year":"2008","journal-title":"J. Syst. Sci. Sys. Eng"},{"key":"R23","first-page":"152","volume":"10","author":"Harris","year":"1913","journal-title":"Factory: The Magazine of Manag"},{"key":"R24","doi-asserted-by":"crossref","first-page":"584","DOI":"10.1080\/095372801750397707","volume":"12","author":"Hayek","year":"2001","journal-title":"Prod. Plann. Control"},{"key":"R25","doi-asserted-by":"crossref","first-page":"313","DOI":"10.1016\/0377-2217(92)90147-2","volume":"59","author":"Hong","year":"1992","journal-title":"Eur. J. Oper. Res"},{"key":"R26","doi-asserted-by":"crossref","first-page":"77","DOI":"10.1016\/j.cie.2004.03.001","volume":"47","author":"Jamal","year":"2004","journal-title":"Comput. Ind. Eng"},{"key":"R27","unstructured":"Johnson L.A. and \nMontgomery D.C., \nOperations  \nResearch  in Production Planning, \nScheduling and Inventory Model, \nWiley \n(1974)"},{"key":"R28","first-page":"258","volume":"4","author":"Khara","year":"2017","journal-title":"J. Manag. Anal"},{"key":"R29","doi-asserted-by":"crossref","first-page":"627","DOI":"10.1080\/00207548708919866","volume":"25","author":"Kim","year":"1987","journal-title":"Int. J. Prod. Res"},{"key":"R30","doi-asserted-by":"crossref","first-page":"368","DOI":"10.1080\/07408178908966243","volume":"21","author":"Lee","year":"1989","journal-title":"IIE Trans"},{"key":"R31","doi-asserted-by":"crossref","first-page":"118","DOI":"10.1016\/j.ijpe.2010.12.004","volume":"130","author":"Liao","year":"2011","journal-title":"Int. J. Prod. Econ"},{"key":"R32","doi-asserted-by":"crossref","first-page":"883","DOI":"10.1007\/s10845-014-1024-2","volume":"28","author":"Mahata","year":"2017","journal-title":"J. Intell. Manuf"},{"key":"R33","unstructured":"Manna A.K., \nDas B., \nDey J.K. and \nMondal S.K., \nAn EPQ model with promotional demand in random planning horizon: population varying genetic algorithm approach. \nTo appear in: J. Intell. Manuf. \n(2016). DOI 10.1007\/s10845-016-1195-010.1007\/s10845-016-1195-0"},{"key":"R34","doi-asserted-by":"crossref","first-page":"9","DOI":"10.1016\/j.cie.2016.11.027","volume":"104","author":"Manna","year":"2017","journal-title":"Comput. Ind. Eng"},{"key":"R35","doi-asserted-by":"crossref","first-page":"299","DOI":"10.1016\/j.jmsy.2014.08.002","volume":"37","author":"Mohammadi","year":"2015","journal-title":"J. Manuf. Sys"},{"key":"R36","doi-asserted-by":"crossref","first-page":"249","DOI":"10.1051\/ro\/1980140302491","volume":"14","author":"Nakagawa","year":"1980","journal-title":"RAIRO: OR"},{"key":"R37","doi-asserted-by":"crossref","first-page":"310","DOI":"10.1016\/j.eswa.2016.03.015","volume":"56","author":"Nobil","year":"2016","journal-title":"Expert Sys. Appl"},{"key":"R38","doi-asserted-by":"crossref","first-page":"1511","DOI":"10.1007\/s40819-017-0340-6","volume":"3","author":"Nobil","year":"2017","journal-title":"Int. J. Appl. Comput. Math"},{"key":"R39","doi-asserted-by":"crossref","first-page":"801","DOI":"10.1080\/00207728308926498","volume":"14","author":"Park","year":"1983","journal-title":"Int. J. Sys. Sci"},{"key":"R40","doi-asserted-by":"crossref","first-page":"203","DOI":"10.1016\/j.ijpe.2015.08.004","volume":"169","author":"Pasandideh","year":"2015","journal-title":"Int. J. Prod. Econ"},{"key":"R41","first-page":"506","volume":"195","author":"Pasandideh","year":"2008","journal-title":"Appl. Math. Comput"},{"key":"R42","doi-asserted-by":"crossref","first-page":"624","DOI":"10.1016\/j.omega.2008.03.002","volume":"37","author":"Pentico","year":"2009","journal-title":"Omega"},{"key":"R43","doi-asserted-by":"crossref","first-page":"2","DOI":"10.1080\/07408179408966632","volume":"26","author":"Rahim","year":"1994","journal-title":"IIE Trans"},{"key":"R44","doi-asserted-by":"crossref","first-page":"277","DOI":"10.1080\/002075498194047","volume":"36","author":"Rahim","year":"1998","journal-title":"Int. J. Prod. Res"},{"key":"R45","doi-asserted-by":"crossref","first-page":"1039","DOI":"10.1080\/00207728508926731","volume":"16","author":"Raafat","year":"1985","journal-title":"Int. J. Sys. Sci"},{"key":"R46","doi-asserted-by":"crossref","first-page":"303","DOI":"10.1016\/S0925-5273(99)00023-7","volume":"63","author":"Roan","year":"2000","journal-title":"Int. J. Prod. Econ"},{"key":"R47","doi-asserted-by":"crossref","first-page":"48","DOI":"10.1080\/07408178608975329","volume":"18","author":"Rosenblatt","year":"1986","journal-title":"IIE Trans"},{"key":"R48","doi-asserted-by":"crossref","first-page":"264","DOI":"10.1287\/mnsc.4.3.264","volume":"4","author":"Rogers","year":"1958","journal-title":"Manag. Sci"},{"key":"R49","doi-asserted-by":"crossref","first-page":"59","DOI":"10.1016\/S0925-5273(99)00044-4","volume":"64","author":"Salameh","year":"2000","journal-title":"Int. J. Prod. Econ"},{"key":"R50","doi-asserted-by":"crossref","first-page":"303","DOI":"10.1007\/s10479-017-2563-7","volume":"261","author":"Taleizadeh","year":"2017","journal-title":"Ann. Oper. Res"},{"key":"R51","doi-asserted-by":"crossref","first-page":"9","DOI":"10.1016\/j.ijpe.2013.11.023","volume":"150","author":"Taleizadeh","year":"2014","journal-title":"Int. J. Prod. Econ"},{"key":"R52","doi-asserted-by":"crossref","first-page":"143","DOI":"10.1007\/s11750-015-0377-9","volume":"24","author":"Taleizadeh","year":"2016","journal-title":"Top"},{"key":"R53","doi-asserted-by":"crossref","first-page":"1834","DOI":"10.1016\/j.cam.2009.09.021","volume":"233","author":"Taleizadeh","year":"2010","journal-title":"J. Comput. Appl. Math"},{"key":"R54","first-page":"1410","volume":"101","author":"Taft","year":"1918","journal-title":"Iron Age"},{"key":"R55","unstructured":"Widyadana G.A. and \nWee H.M., A multi-product EPQ model with discrete delivery order: a Langrangean solution approach. \nIn Global Perspective for Competitive Enterprise, Economy and Ecology. \nSpringer, \nLondon \n(2009) 601\u2013608"}],"container-title":["RAIRO - Operations Research"],"original-title":[],"link":[{"URL":"https:\/\/www.rairo-ro.org\/10.1051\/ro\/2017067\/pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2020,3,20]],"date-time":"2020-03-20T08:05:26Z","timestamp":1584691526000},"score":1,"resource":{"primary":{"URL":"https:\/\/www.rairo-ro.org\/10.1051\/ro\/2017067"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2018,7]]},"references-count":55,"journal-issue":{"issue":"3"},"alternative-id":["ro170258"],"URL":"https:\/\/doi.org\/10.1051\/ro\/2017067","relation":{},"ISSN":["0399-0559","1290-3868"],"issn-type":[{"value":"0399-0559","type":"print"},{"value":"1290-3868","type":"electronic"}],"subject":[],"published":{"date-parts":[[2018,7]]}}}