{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,6,9]],"date-time":"2026-06-09T18:39:20Z","timestamp":1781030360436,"version":"3.54.1"},"reference-count":11,"publisher":"EDP Sciences","issue":"1","license":[{"start":{"date-parts":[[2021,3,12]],"date-time":"2021-03-12T00:00:00Z","timestamp":1615507200000},"content-version":"vor","delay-in-days":70,"URL":"https:\/\/www.edpsciences.org\/en\/authors\/copyright-and-licensing"}],"funder":[{"name":"Key Research Project of Henan Higher Education Institutions","award":["20A110003"],"award-info":[{"award-number":["20A110003"]}]}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["RAIRO-Oper. Res."],"accepted":{"date-parts":[[2020,12,18]]},"published-print":{"date-parts":[[2021,1]]},"abstract":"<jats:p>This paper studies a hierarchical optimization problem of scheduling <jats:italic>n<\/jats:italic> jobs on a serial-batching machine, in which two objective functions are maximum costs. By a hierarchical optimization problem, we mean the problem of optimizing the secondary criterion under the constraint that the primary criterion is optimized. A serial-batching machine is a machine that can handle up to <jats:italic>b<\/jats:italic> jobs in a batch and jobs in a batch start and complete respectively at the same time and the processing time of a batch is equal to the sum of the processing times of jobs in the batch. When a new batch starts, a constant setup time <jats:italic>s<\/jats:italic> occurs. We confine ourselves to the bounded model, where <jats:italic>b<\/jats:italic> &lt; <jats:italic>n<\/jats:italic>. We present an <jats:italic>O<\/jats:italic>(<jats:italic>n<\/jats:italic><jats:sup>4<\/jats:sup>)-time algorithm for this hierarchical optimization problem. For the special case where two objective functions are maximum lateness, we give an <jats:italic>O<\/jats:italic>(<jats:italic>n<\/jats:italic><jats:sup>3<\/jats:sup> log <jats:italic>n<\/jats:italic>)-time algorithm.<\/jats:p>","DOI":"10.1051\/ro\/2020144","type":"journal-article","created":{"date-parts":[[2020,12,20]],"date-time":"2020-12-20T19:58:42Z","timestamp":1608494322000},"page":"135-140","source":"Crossref","is-referenced-by-count":2,"title":["Hierarchical minimization of two maximum costs on a bounded serial-batching machine"],"prefix":"10.1051","volume":"55","author":[{"given":"Cheng","family":"He","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Hao","family":"Lin","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Li","family":"Li","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"250","published-online":{"date-parts":[[2021,3,12]]},"reference":[{"key":"R1","doi-asserted-by":"crossref","unstructured":"Brucker P., Scheduling Algorithms, 3rd edition. Springer, Berlin-Heidelberg (2001).","DOI":"10.1007\/978-3-662-04550-3"},{"key":"R2","first-page":"413","volume":"33","author":"Cheng","year":"2001","journal-title":"IIE Trans."},{"key":"R3","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/j.cam.2017.10.002","volume":"332","author":"Geng","year":"2018","journal-title":"Appl. Math. Comput."},{"key":"R4","doi-asserted-by":"crossref","first-page":"287","DOI":"10.1016\/S0167-5060(08)70356-X","volume":"5","author":"Graham","year":"1979","journal-title":"Ann. Discrete Math."},{"key":"R5","first-page":"369","volume":"33","author":"He","year":"2008","journal-title":"Found. Comput. Decis. Sci."},{"key":"R6","doi-asserted-by":"crossref","first-page":"603","DOI":"10.1016\/j.ipl.2009.02.007","volume":"109","author":"He","year":"2009","journal-title":"Inf. Process. Lett."},{"key":"R7","doi-asserted-by":"crossref","first-page":"177","DOI":"10.1007\/s10100-011-0220-9","volume":"21","author":"He","year":"2013","journal-title":"Central Eur. J. Oper. Res."},{"key":"R8","doi-asserted-by":"crossref","first-page":"70","DOI":"10.1016\/j.disopt.2015.02.001","volume":"16","author":"He","year":"2015","journal-title":"Discrete Optim."},{"key":"R9","doi-asserted-by":"crossref","first-page":"415","DOI":"10.1006\/jagm.1996.0051","volume":"21","author":"Hoogeveen","year":"1996","journal-title":"J. Algorithms"},{"key":"R10","unstructured":"Li L., Study on several multicriteria scheduling problems. Master thesis, Henan University of Technology (2009)."},{"key":"R11","doi-asserted-by":"crossref","first-page":"692","DOI":"10.1287\/opre.43.4.692","volume":"43","author":"Webster","year":"1995","journal-title":"Oper. Res."}],"container-title":["RAIRO - Operations Research"],"original-title":[],"link":[{"URL":"https:\/\/www.rairo-ro.org\/10.1051\/ro\/2020144\/pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,3,12]],"date-time":"2021-03-12T09:22:00Z","timestamp":1615540920000},"score":1,"resource":{"primary":{"URL":"https:\/\/www.rairo-ro.org\/10.1051\/ro\/2020144"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2021,1]]},"references-count":11,"journal-issue":{"issue":"1"},"alternative-id":["ro180286"],"URL":"https:\/\/doi.org\/10.1051\/ro\/2020144","relation":{},"ISSN":["0399-0559","1290-3868"],"issn-type":[{"value":"0399-0559","type":"print"},{"value":"1290-3868","type":"electronic"}],"subject":[],"published":{"date-parts":[[2021,1]]}}}