{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,1,15]],"date-time":"2026-01-15T23:27:58Z","timestamp":1768519678780,"version":"3.49.0"},"reference-count":45,"publisher":"EDP Sciences","issue":"1","license":[{"start":{"date-parts":[[2024,2,22]],"date-time":"2024-02-22T00:00:00Z","timestamp":1708560000000},"content-version":"vor","delay-in-days":52,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["RAIRO-Oper. Res."],"accepted":{"date-parts":[[2023,11,26]]},"published-print":{"date-parts":[[2024,1]]},"abstract":"<jats:p>Robust optimization model is a paradigm for decision-making under uncertainty, where parameters are given in the form of uncertainty sets. In this paper, we develop a robust optimization model for a repair shop network planning problem. The linear optimization model involves product of uncertain parameters in the constraints. We formulate its robust counterpart with the help of min-max regret and Lagrangian dual approach, considering the partial information of uncertain parameters is given in the form of ellipsoidal and polyhedral uncertainty sets. We also consider ellipsoidal+polyhedral uncertainty set, which is the intersection of ellipsoidal and polyhedral uncertainty sets. We apply the robust optimization model to a bi-objective multi-plant repair shop network planning problem where multiple pieces of equipment are repaired and overhauled using several resources over a multi-period planning horizon. We consider uncertainty in resource and demand parameters. Numerical examples are presented for illustrating the theoretical results.<\/jats:p>","DOI":"10.1051\/ro\/2023187","type":"journal-article","created":{"date-parts":[[2023,11,28]],"date-time":"2023-11-28T19:57:16Z","timestamp":1701201436000},"page":"629-664","source":"Crossref","is-referenced-by-count":1,"title":["A robust optimization approach to a repair shop network planning"],"prefix":"10.1051","volume":"58","author":[{"ORCID":"https:\/\/orcid.org\/0000-0003-0553-8187","authenticated-orcid":false,"given":"Shubham","family":"Singh","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Avijit","family":"Khanra","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"250","published-online":{"date-parts":[[2024,2,22]]},"reference":[{"key":"R1","doi-asserted-by":"crossref","first-page":"3382","DOI":"10.1016\/j.ins.2008.05.007","volume":"178","author":"Aghezzaf","year":"2008","journal-title":"Inf. Sci."},{"key":"R2","doi-asserted-by":"crossref","first-page":"263","DOI":"10.1016\/j.jmsy.2018.12.001","volume":"50","author":"Alimian","year":"2019","journal-title":"J. Manuf. Syst."},{"key":"R3","doi-asserted-by":"crossref","first-page":"608","DOI":"10.1016\/j.rcim.2007.02.006","volume":"23","author":"Alvarez","year":"2007","journal-title":"Robot. Comput. Integr. Manuf."},{"key":"R4","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/j.orl.2008.09.010","volume":"37","author":"Beck","year":"2009","journal-title":"Oper. Res. Lett."},{"key":"R5","doi-asserted-by":"crossref","first-page":"260","DOI":"10.1016\/j.ijpe.2004.10.016","volume":"104","author":"Bellabdaoui","year":"2006","journal-title":"Int. J. Prod. Econ."},{"key":"R6","doi-asserted-by":"crossref","first-page":"453","DOI":"10.1007\/s101070100286","volume":"92","author":"Ben-Tal","year":"2002","journal-title":"Math. Program."},{"key":"R7","doi-asserted-by":"crossref","first-page":"125","DOI":"10.1007\/s10107-006-0092-2","volume":"112","author":"Ben-Tal","year":"2008","journal-title":"Math. Program."},{"key":"R8","doi-asserted-by":"crossref","first-page":"265","DOI":"10.1007\/s10107-014-0750-8","volume":"149","author":"Ben-Tal","year":"2015","journal-title":"Math. Program."},{"key":"R9","doi-asserted-by":"crossref","first-page":"35","DOI":"10.1287\/opre.1030.0065","volume":"52","author":"Bertsimas","year":"2004","journal-title":"Oper. Res."},{"key":"R10","doi-asserted-by":"crossref","first-page":"1483","DOI":"10.1287\/opre.1080.0646","volume":"57","author":"Bertsimas","year":"2009","journal-title":"Oper. Res."},{"key":"R11","doi-asserted-by":"crossref","first-page":"510","DOI":"10.1016\/j.orl.2003.12.007","volume":"32","author":"Bertsimas","year":"2004","journal-title":"Oper. Res. Lett."},{"key":"R12","doi-asserted-by":"crossref","first-page":"464","DOI":"10.1137\/080734510","volume":"53","author":"Bertsimas","year":"2011","journal-title":"SIAM Rev."},{"key":"R13","doi-asserted-by":"crossref","unstructured":"Birge J.R. and Louveaux F., Introduction to Stochastic Programming. Springer Science & Business Media (2011).","DOI":"10.1007\/978-1-4614-0237-4"},{"key":"R14","doi-asserted-by":"crossref","first-page":"503","DOI":"10.1080\/07408170304416","volume":"35","author":"Cassady","year":"2003","journal-title":"IIE Trans."},{"key":"R15","doi-asserted-by":"crossref","first-page":"3491","DOI":"10.1016\/j.cor.2006.02.022","volume":"34","author":"Chern","year":"2007","journal-title":"Comput. Oper. Res."},{"key":"R16","doi-asserted-by":"crossref","first-page":"342","DOI":"10.1016\/j.cie.2017.11.020","volume":"115","author":"Cui","year":"2018","journal-title":"Comput. Ind. Eng."},{"key":"R17","unstructured":"Emmons P.H., Concrete Repair and Maintenance Illustrated: Problem Analysis, Repair Strategy, Techniques, Vol. 28. John Wiley & Sons (1992)."},{"key":"R18","first-page":"1","volume":"37","author":"Ghahremani Nahr","year":"2020","journal-title":"J. Ind. Prod. Eng."},{"key":"R19","doi-asserted-by":"crossref","unstructured":"Gholizadeh H., Chaleshigar M. and Fazlollahtabar H., Robust optimization of uncertainty-based preventive maintenance model for scheduling series\u2013parallel production systems (real case: disposable appliances production). ISA Trans. (2021).","DOI":"10.1016\/j.isatra.2021.11.041"},{"key":"R20","doi-asserted-by":"crossref","first-page":"106007","DOI":"10.1016\/j.cie.2019.106007","volume":"137","author":"Golp\u00eera","year":"2019","journal-title":"Comput. Ind. Eng."},{"key":"R21","doi-asserted-by":"crossref","first-page":"30","DOI":"10.1016\/j.ejor.2012.10.007","volume":"227","author":"Gorissen","year":"2013","journal-title":"Eur. J. Oper. Res."},{"key":"R22","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1177\/0263276407075954","volume":"24","author":"Graham","year":"2007","journal-title":"Theory Cult. Soc."},{"key":"R23","doi-asserted-by":"crossref","first-page":"103","DOI":"10.1016\/0024-3795(88)90223-6","volume":"103","author":"Higham","year":"1988","journal-title":"Linear Algebra Appl."},{"key":"R24","unstructured":"Jacobs F.R., Berry W.L., Whybark D.C., Vollmann T.E. and Vollmann T., Manufacturing Planning and Control for Supply Chain Management. McGraw-Hill, New York (2011)."},{"key":"R25","doi-asserted-by":"crossref","first-page":"108370","DOI":"10.1016\/j.ijpe.2021.108370","volume":"244","author":"Kafiabad","year":"2022","journal-title":"Int. J. Prod. Econ."},{"key":"R26","doi-asserted-by":"crossref","unstructured":"Kenn\u00e9 J.-P., Dejax P. and Gharbi A., Production planning of a hybrid manufacturing\u2013remanufacturing system under uncertainty within a closed-loop supply chain. Int. J. Prod. Econ. 135 81\u201393.","DOI":"10.1016\/j.ijpe.2010.10.026"},{"key":"R27","doi-asserted-by":"crossref","first-page":"4148","DOI":"10.1021\/ie071431u","volume":"47","author":"Li","year":"2008","journal-title":"Ind. Eng. Chem. Res."},{"key":"R28","doi-asserted-by":"crossref","first-page":"1069","DOI":"10.1016\/j.compchemeng.2003.09.020","volume":"28","author":"Lin","year":"2004","journal-title":"Comput. Chem. Eng."},{"key":"R29","doi-asserted-by":"crossref","unstructured":"Moghadam M.A., Ebrahimi S.B. and Rahmani D., A constrained multi-period robust portfolio model with behavioral factors and an interval semi-absolute deviation. J. Comput. Appl. Math. (2020) 112742.","DOI":"10.1016\/j.cam.2020.112742"},{"key":"R30","doi-asserted-by":"crossref","first-page":"187","DOI":"10.1016\/j.ress.2005.11.062","volume":"92","author":"Mohanta","year":"2007","journal-title":"Reliab. Eng. Syst. Saf."},{"key":"R31","doi-asserted-by":"crossref","first-page":"271","DOI":"10.1016\/j.ijpe.2005.09.001","volume":"103","author":"Mula","year":"2006","journal-title":"Int. J. Prod. Econ."},{"key":"R32","doi-asserted-by":"crossref","first-page":"81","DOI":"10.1016\/j.ejor.2011.01.032","volume":"212","author":"Nourelfath","year":"2011","journal-title":"Eur. J. Oper. Res."},{"key":"R33","doi-asserted-by":"crossref","first-page":"623","DOI":"10.1016\/j.ejor.2017.06.062","volume":"264","author":"Ouaret","year":"2018","journal-title":"Eur. J. Oper. Res."},{"key":"R34","unstructured":"Pr\u00e9kopa A., Stochastic Programming, Vol. 324. Springer Science & Business Media (2013)."},{"key":"R35","unstructured":"Ruszczynski A.P. and Shapiro A., Stochastic Programming, Vol. 10. Elsevier Amsterdam (2003)."},{"key":"R36","doi-asserted-by":"crossref","first-page":"185","DOI":"10.1080\/00207160701734207","volume":"86","author":"Sahoo","year":"2009","journal-title":"Int. J. Comput. Math."},{"key":"R37","doi-asserted-by":"crossref","first-page":"17854","DOI":"10.1109\/ACCESS.2021.3053714","volume":"9","author":"Shahmoradi-Moghadam","year":"2021","journal-title":"IEEE Access"},{"key":"R38","doi-asserted-by":"crossref","first-page":"89","DOI":"10.1016\/S0377-2217(03)00300-X","volume":"158","author":"Sharafali","year":"2004","journal-title":"Eur. J. Oper. Res."},{"key":"R39","unstructured":"Silver E.A., Pyke D.F. and Peterson R., Inventory Management and Production Planning and Scheduling, Vol. 3. Wiley New York (1998)."},{"key":"R40","doi-asserted-by":"crossref","first-page":"107169","DOI":"10.1016\/j.cie.2021.107169","volume":"155","author":"Singh","year":"2021","journal-title":"Comput. Ind. Eng."},{"key":"R41","doi-asserted-by":"crossref","first-page":"1154","DOI":"10.1287\/opre.21.5.1154","volume":"21","author":"Soyster","year":"1973","journal-title":"Oper. Res."},{"key":"R42","doi-asserted-by":"crossref","first-page":"436","DOI":"10.1016\/j.cie.2010.05.016","volume":"59","author":"Wang","year":"2010","journal-title":"Comput. Ind. Eng."},{"key":"R43","doi-asserted-by":"crossref","first-page":"104094","DOI":"10.1016\/j.conengprac.2019.07.012","volume":"92","author":"Wang","year":"2019","journal-title":"Control Eng. Pract."},{"key":"R44","doi-asserted-by":"crossref","first-page":"90","DOI":"10.1016\/0167-6377(83)90044-5","volume":"2","author":"Wei","year":"1983","journal-title":"Oper. Res. Lett."},{"key":"R45","doi-asserted-by":"crossref","unstructured":"Zied H., Sofiene D. and Nidhal R., An optimal production\/maintenance planning under stochastic random demand, service level and failure rate. In 2009 IEEE International Conference on Automation Science and Engineering, IEEE (2009) 292\u2013297.","DOI":"10.1109\/COASE.2009.5234168"}],"container-title":["RAIRO - Operations Research"],"original-title":[],"link":[{"URL":"https:\/\/www.rairo-ro.org\/10.1051\/ro\/2023187\/pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,2,22]],"date-time":"2024-02-22T09:11:58Z","timestamp":1708593118000},"score":1,"resource":{"primary":{"URL":"https:\/\/www.rairo-ro.org\/10.1051\/ro\/2023187"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2024,1]]},"references-count":45,"journal-issue":{"issue":"1"},"alternative-id":["ro220638"],"URL":"https:\/\/doi.org\/10.1051\/ro\/2023187","relation":{},"ISSN":["0399-0559","2804-7303"],"issn-type":[{"value":"0399-0559","type":"print"},{"value":"2804-7303","type":"electronic"}],"subject":[],"published":{"date-parts":[[2024,1]]}}}