{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,5,19]],"date-time":"2026-05-19T21:14:06Z","timestamp":1779225246211,"version":"3.51.4"},"reference-count":26,"publisher":"EDP Sciences","issue":"2","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["RAIRO-Oper. Res."],"published-print":{"date-parts":[[2007,4]]},"DOI":"10.1051\/ro:2007015","type":"journal-article","created":{"date-parts":[[2007,6,14]],"date-time":"2007-06-14T13:32:44Z","timestamp":1181827964000},"page":"155-170","source":"Crossref","is-referenced-by-count":105,"title":["A Branch-and-Bound method for solving Multi-Skill Project Scheduling Problem"],"prefix":"10.1051","volume":"41","author":[{"given":"Odile","family":"Bellenguez-Morineau","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Emmanuel","family":"N\u00e9ron","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"250","published-online":{"date-parts":[[2007,6,15]]},"reference":[{"key":"R1","unstructured":"Ph. Baptiste, C. Le Pape and W. Nuitjen, Satisfiability tests and time-bound adjustments for cumulative scheduling problems, inAnn. Oper. Res.92(1999) 305\u2013333."},{"key":"R2","unstructured":"O. Bellenguez, C. Canon and E. N\u00e9ron, Ordonnancement des formations des t\u00e9l\u00e9-op\u00e9rateurs dans un centre de contacts clients, inProc. ROADEF 2005, Tours, France (2005)."},{"key":"R3","unstructured":"O. Bellenguez and E. N\u00e9ron, M\u00e9thodes approch\u00e9es pour le probl\u00e8me de gestion de projet multi-comp\u00e9tence, in\u00c9cole d'Automne de Recherche Op\u00e9rationnelle, TOURS, France (2003) 39\u201342."},{"key":"R4","unstructured":"O. Bellenguez and E. N\u00e9ron, An exact method for solving the multi-skill project scheduling problem, inProc. Operations Research (OR2004), Tilburg, The Netherlands (2004) 97\u201398."},{"key":"R5","unstructured":"O. Bellenguez and E. N\u00e9ron, Lower bounds for the multi-skill project scheduling problem with hierarchical levels of skills, inProc. Practice and Theory of Automated Timetabling (PATAT2004), Pittsburgh, PA, USA (2004) 429\u2013432."},{"key":"R6","unstructured":"O. Bellenguez and E. N\u00e9ron, Methods for solving the multi-skill project scheduling problem, inProc. 9th International Workshop on Project Management and Scheduling (PMS2004), Nancy, France (2004) 66\u201369."},{"key":"R7","doi-asserted-by":"crossref","first-page":"298","DOI":"10.1016\/0377-2217(87)90243-8","volume":"29","author":"Carlier","year":"1987","journal-title":"Eur. J. Oper. Res."},{"key":"R8","first-page":"23","volume":"25","author":"Carlier","year":"1991","journal-title":"RAIRO-RO"},{"key":"R9","unstructured":"S. Hartmann and A. Drexl. Project scheduling with multiple modes: A comparison of exact algorithms.Networks32(1998) 283\u2013297."},{"key":"R10","doi-asserted-by":"crossref","unstructured":"W. Hopp and M. Van Oyen, Agile workforce evaluation: a framework for cross-training and coordination.IIE Transactions36(2004).","DOI":"10.1080\/07408170490487759"},{"key":"R11","doi-asserted-by":"crossref","first-page":"137","DOI":"10.1023\/A:1010954031930","volume":"102","author":"Josefowska","year":"2001","journal-title":"Ann. Oper. Res."},{"key":"R12","doi-asserted-by":"crossref","unstructured":"R. Klein,Scheduling of resource-constrained projects. Kluwer Academic Publishers (2000).","DOI":"10.1007\/978-1-4615-4629-0"},{"key":"R13","doi-asserted-by":"crossref","first-page":"23","DOI":"10.1016\/0377-2217(91)90320-U","volume":"54","author":"Kolen","year":"1991","journal-title":"Eur. J. Oper. Res."},{"key":"R14","doi-asserted-by":"crossref","first-page":"205","DOI":"10.1016\/S0377-2217(96)00170-1","volume":"96","author":"Kolisch","year":"1997","journal-title":"Eur. J. Oper. Res."},{"key":"R15","unstructured":"R. Kolisch and A. Sprecher, Psplib - a project scheduling problem library. pages ftp:\/\/ftp.bwl.uni\u2013kiel.de\/pub\/operations\u2013research\/psplib\/html\/indes.html, (2000)."},{"key":"R16","doi-asserted-by":"crossref","first-page":"190","DOI":"10.1016\/0377-2217(93)E0335-U","volume":"82","author":"Kroon","year":"1995","journal-title":"Eur. J. Oper. Res."},{"key":"R17","first-page":"453","volume":"26","author":"Lopez","year":"1992","journal-title":"RAIRO-APII"},{"key":"R18","doi-asserted-by":"crossref","first-page":"714","DOI":"10.1287\/mnsc.44.5.714","volume":"44","author":"Mingozzi","year":"1998","journal-title":"Management Science"},{"key":"R19","unstructured":"E. Neron, Lower bounds for the multi-skill project scheduling problem, inProc. 8th International Workshop on Project Management and Scheduling (PMS2002), Valencia, Spain (2002) 274\u2013277."},{"key":"R20","doi-asserted-by":"crossref","unstructured":"L. Ozdamar, A genetic algorithm approach to a general category project scheduling problem.IEEE Transactions on Systems, Man, and Cybernetics29to be published.","DOI":"10.1109\/5326.740669"},{"key":"R21","unstructured":"G. Pepiot, N. Cheikhrouhou and R. Glardon, Mod\u00e8le de comp\u00e9tence: vers un formalisme, inProc. Conf\u00e9rence francophone de Mod\u00e9lisation et de SIMulation (MOSIM2004), Nantes, France (2004) 503\u2013510."},{"key":"R22","doi-asserted-by":"crossref","first-page":"538","DOI":"10.1016\/S0377-2217(99)00151-4","volume":"119","author":"De Reyck","year":"1999","journal-title":"Eur. J. Oper. Res."},{"key":"R23","unstructured":"E. Rolland, R.A. Patterson, K. Ward and B. Dodin, Scheduling differentially-skilled staff to multiple projects with severe deadlines.Eur. J. Oper. Res.(2005). Submitted to the special issue of PMS (2004)."},{"key":"R24","doi-asserted-by":"crossref","first-page":"431","DOI":"10.1016\/S0377-2217(97)00348-2","volume":"107","author":"Sprecher","year":"1998","journal-title":"Eur. J. Oper. Res."},{"key":"R25","doi-asserted-by":"crossref","first-page":"94","DOI":"10.1016\/0377-2217(93)E0294-8","volume":"80","author":"Sprecher","year":"1995","journal-title":"Eur. J. Oper. Res."},{"key":"R26","doi-asserted-by":"crossref","unstructured":"I. Toroslu, Personnel assignment problem with hierarchical ordering constraints. inProc. Personnel assignment Problem with hierarchical ordering constraints(2003) 493\u2013510.","DOI":"10.1016\/S0360-8352(03)00045-7"}],"container-title":["RAIRO - Operations Research"],"original-title":[],"link":[{"URL":"http:\/\/www.rairo-ro.org\/10.1051\/ro:2007015\/pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,4,29]],"date-time":"2019-04-29T02:45:42Z","timestamp":1556505942000},"score":1,"resource":{"primary":{"URL":"http:\/\/www.rairo-ro.org\/10.1051\/ro:2007015"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2007,4]]},"references-count":26,"journal-issue":{"issue":"2"},"alternative-id":["ro0631"],"URL":"https:\/\/doi.org\/10.1051\/ro:2007015","relation":{},"ISSN":["0399-0559","1290-3868"],"issn-type":[{"value":"0399-0559","type":"print"},{"value":"1290-3868","type":"electronic"}],"subject":[],"published":{"date-parts":[[2007,4]]}}}