{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,28]],"date-time":"2026-02-28T17:02:47Z","timestamp":1772298167565,"version":"3.50.1"},"reference-count":49,"publisher":"American Society of Civil Engineers (ASCE)","issue":"2","content-domain":{"domain":["ascelibrary.org"],"crossmark-restriction":true},"short-container-title":["J. Comput. Civ. Eng."],"published-print":{"date-parts":[[2012,3]]},"DOI":"10.1061\/(asce)cp.1943-5487.0000131","type":"journal-article","created":{"date-parts":[[2011,4,18]],"date-time":"2011-04-18T22:04:44Z","timestamp":1303164284000},"page":"248-258","update-policy":"https:\/\/doi.org\/10.1061\/do.news.20190416.0001","source":"Crossref","is-referenced-by-count":11,"title":["Design and Implementation of Loose-Coupling Visualization Components in a Distributed Construction Simulation Environment with HLA"],"prefix":"10.1061","volume":"26","author":[{"given":"Yang","family":"Zhang","sequence":"first","affiliation":[{"name":"SMA Consulting Ltd., 240 Sun Life Place 10123 99 St., Edmonton, Alberta, Canada."},{"name":"Hole School of Construction Engineering, Univ. of Alberta, Edmonton, Alberta, Canada (corresponding author)."},{"name":"Hole School of Construction Engineering, Univ. of Alberta, Edmonton, Alberta, Canada."},{"name":"Hole School of Construction Engineering, Univ. of Alberta, Edmonton, Alberta, Canada."}]},{"given":"Simaan M.","family":"AbouRizk","sequence":"additional","affiliation":[{"name":"SMA Consulting Ltd., 240 Sun Life Place 10123 99 St., Edmonton, Alberta, Canada."},{"name":"Hole School of Construction Engineering, Univ. of Alberta, Edmonton, Alberta, Canada (corresponding author)."},{"name":"Hole School of Construction Engineering, Univ. of Alberta, Edmonton, Alberta, Canada."},{"name":"Hole School of Construction Engineering, Univ. of Alberta, Edmonton, Alberta, Canada."}]},{"given":"Hua","family":"Xie","sequence":"additional","affiliation":[{"name":"SMA Consulting Ltd., 240 Sun Life Place 10123 99 St., Edmonton, Alberta, Canada."},{"name":"Hole School of Construction Engineering, Univ. of Alberta, Edmonton, Alberta, Canada (corresponding author)."},{"name":"Hole School of Construction Engineering, Univ. of Alberta, Edmonton, Alberta, Canada."},{"name":"Hole School of Construction Engineering, Univ. of Alberta, Edmonton, Alberta, Canada."}]},{"given":"Elmira","family":"Moghani","sequence":"additional","affiliation":[{"name":"SMA Consulting Ltd., 240 Sun Life Place 10123 99 St., Edmonton, Alberta, Canada."},{"name":"Hole School of Construction Engineering, Univ. of Alberta, Edmonton, Alberta, Canada (corresponding author)."},{"name":"Hole School of Construction Engineering, Univ. of Alberta, Edmonton, Alberta, Canada."},{"name":"Hole School of Construction Engineering, Univ. of Alberta, Edmonton, Alberta, Canada."}]}],"member":"30","reference":[{"key":"e_1_3_2_2_1","unstructured":"AbouRizk S. M.  (2006). \u201cCollaborative simulation framework for multi-user support in construction.\u201d Discovery Grant Proposal."},{"key":"e_1_3_2_3_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CO.1943-7862.0000220"},{"key":"e_1_3_2_4_1","doi-asserted-by":"crossref","unstructured":"AbouRizk S. M. Hague S. Al-Bataineh M. and Fernando S. (2009a). \u201cCollaborative tunneling simulation using synthetic environments.\u201d Proc. 2009 Construction Research Congress ASCE Construction Institute Reston VA 1223\u20131232.","DOI":"10.1061\/41020(339)124"},{"key":"e_1_3_2_5_1","doi-asserted-by":"crossref","unstructured":"AbouRizk S. M. Hague S. and Moghani E. (2009b). \u201cDeveloping a bidding game using high level architecture.\u201d Proc. 2009 ASCE Int. Workshop on Computing in Civil Engineering ASCE Reston VA 346 513\u2013522.","DOI":"10.1061\/41052(346)51"},{"key":"e_1_3_2_6_1","doi-asserted-by":"crossref","unstructured":"AbouRizk S. M. Hague S. Mohamed Y. and Robinson F. A.  (2010). \u201cAn HLA-based bidding game with intelligent virtual player.\u201d Proc. 2010 Winter Simulation Conf. Baltimore MD 3056\u20133068.","DOI":"10.1109\/WSC.2010.5678999"},{"key":"e_1_3_2_7_1","doi-asserted-by":"crossref","unstructured":"AbouRizk S. and Mohammad Y. (2000). \u201cSimphony\u2014An integrated environment for construction simulation.\u201d Proc. WSC 2000 Orlando FL 1907\u20131914.","DOI":"10.1109\/WSC.2000.899185"},{"key":"e_1_3_2_8_1","unstructured":"Al-Bataineh M. (2008). \u201cScenario-based planning for tunneling construction.\u201d Ph.D. thesis Univ. of Alberta Edmonton Alberta Canada."},{"key":"e_1_3_2_9_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2005.07.007"},{"key":"e_1_3_2_10_1","doi-asserted-by":"publisher","DOI":"10.1111\/j.1467-8667.2010.00650.x"},{"key":"e_1_3_2_11_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2010.07.001"},{"key":"e_1_3_2_12_1","doi-asserted-by":"crossref","unstructured":"Boukerche A. and Lu K. (2005). \u201cA novel approach to real-time RTI based distributed simulation system.\u201d Proc. ANSS \u201905 Proc. of the 38th annual Symposium on Simulation Society for Modeling & Simulation International Vista CA.","DOI":"10.1109\/ANSS.2005.9"},{"key":"e_1_3_2_13_1","doi-asserted-by":"crossref","unstructured":"Ceranowicz A. (1994). \u201cModular semi-automated forces.\u201d Proc. 1994 Winter Simulation Conf. IEEE New York 755\u2013761.","DOI":"10.1109\/WSC.1994.717428"},{"key":"e_1_3_2_14_1","unstructured":"Chen X. Chen Y. Xi B. Wu Z. and Wang L. (2010). \u201cRealization of distributed interactive simulation by Vega and VR-Link.\u201d Proc. ICCDA 2010 International Association of Computer Science and Information Technology Singapore Vol. 2 V2-346\u2013V2-349."},{"key":"e_1_3_2_15_1","doi-asserted-by":"crossref","unstructured":"ElNimr A. A. and Mohammed Y. (2010). \u201cA simulation driven visualization framework for construction operations: Development and application.\u201d Proc. 2010 Construction Research Congress ASCE Construction Institute Reston VA 257\u2013266.","DOI":"10.1061\/41109(373)26"},{"key":"e_1_3_2_16_1","doi-asserted-by":"crossref","unstructured":"Fujimoto R. M.  (2001). \u201cParallel and distributed simulation systems.\u201d Proc. 2001 WSC. IEEE New York 147\u2013157.","DOI":"10.1109\/WSC.2001.977259"},{"key":"e_1_3_2_17_1","doi-asserted-by":"crossref","unstructured":"Fujimoto R. M.  (2003). \u201cDistributed simulation systems.\u201d Proc. of 2003 WSC IEEE New York 124\u2013134.","DOI":"10.1109\/WSC.2003.1261415"},{"key":"e_1_3_2_18_1","unstructured":"Gerner W. Henninger A. E. Stone G. F.  (1998). \u201cIntelligent extraction filtering and reporting of critical decision information from a simulation.\u201d Proc. Spring Simulation Interoperability Workshop Simulation Interoperability Standards Organization Orlando FL."},{"issue":"3","key":"e_1_3_2_19_1","doi-asserted-by":"crossref","first-page":"489","DOI":"10.1061\/JCCEAZ.0000712","article-title":"CYCLONE\u2014Method for modeling job site processes","volume":"103","author":"Halpin D. W.","year":"1977","journal-title":"J. Constr. Div."},{"key":"e_1_3_2_20_1","unstructured":"Halpin D. W.  (1998). \u201cConstruction simulation: A status report.\u201d Proc. 5th Canadian Constr. Research Forum Univ. of Alberta and Alberta Constr. Industry Alberta Canada 33\u201341."},{"key":"e_1_3_2_21_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0887-3801(2000)14:3(160)"},{"key":"e_1_3_2_22_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2006.09.007"},{"key":"e_1_3_2_23_1","unstructured":"IEEE. (1998). \u201cIEEE recommended practice for distributed interactive simulation.\u201d IEEE 1278 New York."},{"key":"e_1_3_2_24_1","unstructured":"IEEE. (2010). \u201cStandard for modeling and simulation (M&S) high level architecture (HLA)\u2014Framework and rules.\u201d IEEE 1516 New York."},{"key":"e_1_3_2_25_1","unstructured":"Kamat V. R.  (2003). \u201cVITASCOPE: Extensible and scalable 3D visualization of simulated construction operations.\u201d Ph.D. dissertation Dept. of Civil and Environmental Engineering VA Tech Blacksburg VA."},{"key":"e_1_3_2_26_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0887-3801(2001)15:4(329)"},{"key":"e_1_3_2_27_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0887-3801(2005)19:2(160)"},{"key":"e_1_3_2_28_1","volume-title":"Creating computer simulation systems: an introduction to the high level architecture","author":"Kuhl F.","year":"1999"},{"key":"e_1_3_2_29_1","doi-asserted-by":"crossref","unstructured":"Liang X. and Lu M. (2010). \u201c3D visualization for tunnel boring machine steering and alignment control in microtunneling.\u201d Proc. 2010 Construction Research Congress ASCE Construction Institute Reston VA 1\u201310.","DOI":"10.1061\/41109(373)1"},{"key":"e_1_3_2_30_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2003)129:5(537)"},{"key":"e_1_3_2_31_1","doi-asserted-by":"publisher","DOI":"10.1139\/L08-145"},{"key":"e_1_3_2_32_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2007)133:3(199)"},{"key":"e_1_3_2_33_1","unstructured":"Martinez J. C.  (1996). \u201cSTROBOSCOPE: State and resource based simulation of construction processes.\u201d Ph.D. Dissertation Univ. of MI Ann Arbor MI."},{"key":"e_1_3_2_34_1","doi-asserted-by":"crossref","unstructured":"Marzok M. Abdallah M. and El-Said M. (2008). \u201cTunnel-sim: Decision support tool for planning tunnel construction using computer simulation.\u201d Proc. WSC 2008 IEEE New York 2504\u20132511.","DOI":"10.1109\/WSC.2008.4736360"},{"key":"e_1_3_2_35_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ress.2010.08.002"},{"key":"e_1_3_2_36_1","unstructured":"Powell E. T.  (1997). \u201cThe JSIMS architecture.\u201d Proc. Springs Simulation Interoperability Workshop Simulation Interoperability Standards Organization Orlando FL."},{"key":"e_1_3_2_37_1","unstructured":"Pederson P. Dudenhoeffer D. Hartly S. and Permann M. (2006). \u201cCritical infrastructure interdependency modeling: A survey of U.S. and international research.\u201d Report INL\/EXT-06-11464 ID Falls: ID National Laboratory."},{"key":"e_1_3_2_38_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0887-3801(2009)23:6(372)"},{"key":"e_1_3_2_39_1","doi-asserted-by":"publisher","DOI":"10.1111\/j.1467-8667.2008.00565.x"},{"key":"e_1_3_2_40_1","unstructured":"Shen E. (1997). \u201cAn overview of the after action review component in WARSIM 2000.\u201d Proc. Fall Simulations Interoperability Workshop Simulation Interoperability Standards Organization Orlando FL."},{"key":"e_1_3_2_41_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(1999)125:5(354)"},{"key":"e_1_3_2_42_1","unstructured":"Switzer W. H.  (1999). \u201cDistributed training and distributed simulations: Imperatives for success in military operations other than war.\u201d Proc. Spring Simulation Interoperability Workshop Simulation Interoperability Standards Organization Orlando FL."},{"key":"e_1_3_2_43_1","doi-asserted-by":"crossref","unstructured":"Taghaddos H. AbouRizk S. M. Mohamed Y. and Ourdev I. (2008). \u201cDistributed agent-based simulation of construction projects with HLA.\u201d Proc. 2008 WSC IEEE New York 2413\u20132420.","DOI":"10.1109\/WSC.2008.4736349"},{"key":"e_1_3_2_44_1","doi-asserted-by":"publisher","DOI":"10.1177\/0037549705052455"},{"key":"e_1_3_2_45_1","doi-asserted-by":"publisher","DOI":"10.1109\/TSMCA.2005.859167"},{"key":"e_1_3_2_46_1","unstructured":"Waite W. F.  (1999). \u201cHigh level architecture (HLA) for simulation based acquisition (SBA) systems engineering automation.\u201d Proc. Fall Simulation Interoperability Workshop Simulation Interoperability Standards Organization Orlando FL."},{"key":"e_1_3_2_47_1","doi-asserted-by":"publisher","DOI":"10.1016\/S0928-4869(00)00023-9"},{"key":"e_1_3_2_48_1","unstructured":"Xie H. and Moghani E. (2009). \u201cTunneling construction simulation using high level architecture.\u201d Proc. 16th Annual Canadian Construction Research Forum ASCE Construction Institute Reston VA 133\u2013155."},{"key":"e_1_3_2_49_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0887-3801(2002)16:3(157)"},{"key":"e_1_3_2_50_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2004)130:5(742)"}],"container-title":["Journal of Computing in Civil Engineering"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/ascelibrary.org\/doi\/pdf\/10.1061\/%28ASCE%29CP.1943-5487.0000131","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,6,9]],"date-time":"2022-06-09T22:27:30Z","timestamp":1654813650000},"score":1,"resource":{"primary":{"URL":"https:\/\/ascelibrary.org\/doi\/10.1061\/%28ASCE%29CP.1943-5487.0000131"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2012,3]]},"references-count":49,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2012,3]]}},"alternative-id":["10.1061\/(ASCE)CP.1943-5487.0000131"],"URL":"https:\/\/doi.org\/10.1061\/(asce)cp.1943-5487.0000131","relation":{},"ISSN":["0887-3801","1943-5487"],"issn-type":[{"value":"0887-3801","type":"print"},{"value":"1943-5487","type":"electronic"}],"subject":[],"published":{"date-parts":[[2012,3]]},"assertion":[{"value":"2010-09-01","order":0,"name":"received","label":"Received","group":{"name":"publication_history","label":"Publication History"}},{"value":"2011-04-15","order":1,"name":"accepted","label":"Accepted","group":{"name":"publication_history","label":"Publication History"}},{"value":"2011-04-18","order":2,"name":"published","label":"Published","group":{"name":"publication_history","label":"Publication History"}}]}}