{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,4,8]],"date-time":"2024-04-08T16:35:46Z","timestamp":1712594146103},"reference-count":30,"publisher":"American Society of Civil Engineers (ASCE)","issue":"3","content-domain":{"domain":["ascelibrary.org"],"crossmark-restriction":true},"short-container-title":["J. Comput. Civ. Eng."],"published-print":{"date-parts":[[2012,5]]},"DOI":"10.1061\/(asce)cp.1943-5487.0000139","type":"journal-article","created":{"date-parts":[[2011,6,10]],"date-time":"2011-06-10T22:11:09Z","timestamp":1307743869000},"page":"309-318","update-policy":"http:\/\/dx.doi.org\/10.1061\/do.news.20190416.0001","source":"Crossref","is-referenced-by-count":9,"title":["Automated Approach for Developing Integrated Model-Based Project Histories to Support Estimation of Activity Production Rates"],"prefix":"10.1061","volume":"26","author":[{"given":"Semiha Kiziltas","family":"Ergan","sequence":"first","affiliation":[{"name":"Visiting Assistant Professor, Carnegie Mellon Univ., Dept. of Civil and Environmental Engineering, Pittsburgh, PA 15213 (corresponding author)."}]},{"given":"Burcu","family":"Akinci","sequence":"additional","affiliation":[{"name":"Professor, Dept. of Civil and Environmental Engineering, Carnegie Mellon Univ., Pittsburgh, PA 15213."}]}],"member":"30","reference":[{"key":"e_1_3_1_2_1","doi-asserted-by":"crossref","unstructured":"Akbas R. and Fischer M. (2002). \u201cConstruction zone generation mechanisms and applications.\u201d 19th Int. Symp. on Automation and Robotics in Construction National Institute of Standards and Technology Washington DC 293\u2013298.","DOI":"10.22260\/ISARC2002\/0046"},{"key":"e_1_3_1_3_1","unstructured":"Augenbroe G. (1994). \u201cAn overview of the combine project.\u201d 1st European Conf. on Product and Process Modeling in the Building Industry Scherer R. ed. Taylor & Francis Group London 547\u2013554."},{"issue":"2","key":"e_1_3_1_4_1","volume":"23","author":"Barak R.","year":"2009","journal-title":"Unique requirements of building information modeling for cast-in-place reinforced concrete"},{"issue":"6","key":"e_1_3_1_5_1","volume":"9","author":"Barrera J.","year":"2001","journal-title":"What is Java reflection?"},{"issue":"2","key":"e_1_3_1_6_1","volume":"21","author":"Bjork B. C.","year":"1989","journal-title":"Basic structure of a proposed building product model"},{"issue":"1","key":"e_1_3_1_7_1","volume":"23","author":"Borrmann A.","year":"2009","journal-title":"Implementing metric operators of a spatial query language for 3D building models: Octree and b-rep approaches"},{"key":"e_1_3_1_8_1","unstructured":"buildingSmart. (2008). \u201cShort introduction to IFC.\u201d \u2329www.buildingsmart.com\/bim\u232a (Mar. 3 2008)."},{"issue":"3","key":"e_1_3_1_9_1","volume":"125","author":"Choo H. J.","year":"1999","journal-title":"WorkPlan: Constraint-based database for work package scheduling"},{"key":"e_1_3_1_10_1","unstructured":"CIS\/2. (2003). \u201cCIMSteel integration standards.\u201d \u2329http:\/\/www.cis2.org\u232a (Mar. 16 2008)."},{"issue":"4","key":"e_1_3_1_11_1","volume":"9","author":"Clayton M.","year":"1996","journal-title":"Rapid conceptual design evaluation using a virtual product model"},{"issue":"3","key":"e_1_3_1_12_1","volume":"2","author":"Darwiche A.","year":"1988","journal-title":"OARPlan: Generating project plans by reasoning about objects, actions and resources"},{"issue":"6","key":"e_1_3_1_13_1","volume":"20","author":"Demian P.","year":"2006","journal-title":"Methodology for usability evaluation of corporate memory design reuse systems"},{"issue":"4","key":"e_1_3_1_14_1","volume":"122","author":"Fischer M. A.","year":"1996","journal-title":"Scheduling with computer-interpretable construction method models"},{"issue":"1","key":"e_1_3_1_15_1","volume":"18","author":"Graham D.","year":"2004","journal-title":"Estimating the productivity of cyclic construction operations using case-based reasoning"},{"key":"e_1_3_1_16_1","volume-title":"Planning and analysis of construction operations","author":"Halpin D.","year":"1992"},{"issue":"4","key":"e_1_3_1_17_1","volume":"1","author":"Hendrickson C.","year":"1987","journal-title":"Expert system for construction planning"},{"issue":"1","key":"e_1_3_1_18_1","volume":"122","author":"Kartam N.","year":"1996","journal-title":"Making effective use of construction lessons learned in project life cycle"},{"key":"e_1_3_1_19_1","unstructured":"Kiziltas S. (2008). \u201cAn automated approach for developing integrated model-based project histories to support estimation of activity production rates.\u201d Ph.D. thesis Carnegie Mellon Univ. Pittsburgh."},{"issue":"9","key":"e_1_3_1_20_1","volume":"135","author":"Kiziltas S.","year":"2009","journal-title":"Contextual information requirements of cost estimators from past construction projects"},{"issue":"2","key":"e_1_3_1_21_1","volume":"24","author":"Kiziltas S.","year":"2010","journal-title":"Automated generation of customized field data collection templates to support information needs of cost estimators"},{"issue":"2","key":"e_1_3_1_22_1","volume":"37","author":"Kiziltas S.","year":"2010","journal-title":"Comparison of experienced and novice cost estimator behaviors in information pull and push methods"},{"key":"e_1_3_1_23_1","volume-title":"An information reference model for architecture, engineering, and constructionManagement of information technology for construction","author":"Luiten G.","year":"1993"},{"key":"e_1_3_1_24_1","doi-asserted-by":"crossref","unstructured":"Moore H. M. and Nimmo P. E. (2008). \u201cImproving estimation accuracy.\u201d Electr. Constr. Maint. Mag. \u2329http:\/\/www.ecmweb.com\/ops_maintenance\/electric_improving_estimation_accuracy\/index.html\u232a (Dec. 5 2010).","DOI":"10.2139\/ssrn.1516449"},{"key":"e_1_3_1_25_1","volume-title":"RediCheck: A system for interdisciplinary coordination","author":"Nigro W. T.","year":"1992","edition":"3"},{"issue":"6","key":"e_1_3_1_26_1","volume":"15","author":"Rujirayanyong T.","year":"2006","journal-title":"A project-oriented data warehouse for construction"},{"issue":"2","key":"e_1_3_1_27_1","volume":"121","author":"Shaked O.","year":"1995","journal-title":"Knowledge-based system for construction planning of high-rise buildings"},{"issue":"1","key":"e_1_3_1_28_1","volume":"17","author":"Staub-French S.","year":"2003","journal-title":"A generic feature-driven activity-based cost estimation process"},{"issue":"1","key":"e_1_3_1_29_1","volume":"120","author":"Thomas H. R.","year":"1994","journal-title":"Forecasting labor productivity using the factor model"},{"issue":"6","key":"e_1_3_1_30_1","volume":"25","author":"Wang H. H.","year":"2011","journal-title":"Ontology-based representation and reasoning framework for supporting job hazard analysis"},{"key":"e_1_3_1_31_1","volume-title":"To product models and beyondIntegrated construction information","author":"Watson A.","year":"1995"}],"container-title":["Journal of Computing in Civil Engineering"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/ascelibrary.org\/doi\/pdf\/10.1061\/%28ASCE%29CP.1943-5487.0000139","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,6,10]],"date-time":"2022-06-10T01:07:28Z","timestamp":1654823248000},"score":1,"resource":{"primary":{"URL":"https:\/\/ascelibrary.org\/doi\/10.1061\/%28ASCE%29CP.1943-5487.0000139"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2012,5]]},"references-count":30,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2012,5]]}},"alternative-id":["10.1061\/(ASCE)CP.1943-5487.0000139"],"URL":"https:\/\/doi.org\/10.1061\/(asce)cp.1943-5487.0000139","relation":{},"ISSN":["0887-3801","1943-5487"],"issn-type":[{"value":"0887-3801","type":"print"},{"value":"1943-5487","type":"electronic"}],"subject":[],"published":{"date-parts":[[2012,5]]},"assertion":[{"value":"2010-03-21","order":0,"name":"received","label":"Received","group":{"name":"publication_history","label":"Publication History"}},{"value":"2011-06-07","order":1,"name":"accepted","label":"Accepted","group":{"name":"publication_history","label":"Publication History"}},{"value":"2011-06-10","order":2,"name":"published","label":"Published","group":{"name":"publication_history","label":"Publication History"}}]}}