{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,8]],"date-time":"2025-10-08T15:47:52Z","timestamp":1759938472121},"reference-count":38,"publisher":"American Society of Civil Engineers (ASCE)","issue":"5","content-domain":{"domain":["ascelibrary.org"],"crossmark-restriction":true},"short-container-title":["J. Comput. Civ. Eng."],"published-print":{"date-parts":[[2012,9]]},"DOI":"10.1061\/(asce)cp.1943-5487.0000153","type":"journal-article","created":{"date-parts":[[2011,7,30]],"date-time":"2011-07-30T22:01:16Z","timestamp":1312063276000},"page":"597-611","update-policy":"http:\/\/dx.doi.org\/10.1061\/do.news.20190416.0001","source":"Crossref","is-referenced-by-count":15,"title":["Model-Based Groupware Solution for Distributed Real-Time Collaborative 4D Planning through Teamwork"],"prefix":"10.1061","volume":"26","author":[{"given":"Wei","family":"Zhou","sequence":"first","affiliation":[{"name":"Post-Doctoral Research Assistant, Dept. of Real Estate and Construction, Faculty of Technology, Design &amp; Environment, Oxford Brookes Univ., Headington Campus, Gipsy Lane, Oxford, OX3 0BP, United Kingdom (corresponding author)."}]},{"given":"Panagiotis","family":"Georgakis","sequence":"additional","affiliation":[{"name":"Senior Lecturer, School of Technology, Univ. of Wolverhampton, Wulfruna Street, Wolverhampton, WV1 1LY, United Kingdom."}]},{"given":"David","family":"Heesom","sequence":"additional","affiliation":[{"name":"Principal Lecturer, School of Technology, Univ. of Wolverhampton, Wulfruna Street, Wolverhampton, WV1 1LY, United Kingdom."}]},{"given":"Xiandong","family":"Feng","sequence":"additional","affiliation":[{"name":"Lecturer, School of Design, Writtle College, Chelmsford, Essex, CM1 3RR, United Kingdom."}]}],"member":"30","reference":[{"key":"e_1_3_1_2_1","unstructured":"Autodesk. (2010). Revit architecture 2011 user\u2019s guide San Rafael CA."},{"key":"e_1_3_1_3_1","volume-title":"ND modelling roadmap: A vision for ND-enabled construction","author":"Baldwin R.","year":"2005"},{"key":"e_1_3_1_4_1","unstructured":"Collier E. and Fischer M. (1996). \u201cVisual-based scheduling: 4D modelling on the San Mateo county health center.\u201d Computing in civil engineering ASCE New York 800\u2013805."},{"key":"e_1_3_1_5_1","first-page":"43","article-title":"The virtual construction site (VIRCON) tools: An industrial evaluation","volume":"10","author":"Dawood N.","year":"2005","journal-title":"ITcon"},{"key":"e_1_3_1_6_1","unstructured":"Dynamic collaboration for iterative project review. (2011) Bentley \u2329http:\/\/www.bentley.com\/en-US\/Products\/ProjectWise+Navigator\/i-model.htm\u232a (Jul. 30 2010)."},{"key":"e_1_3_1_7_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijhcs.2005.04.014"},{"issue":"4","key":"e_1_3_1_8_1","first-page":"13","article-title":"Collaborative production modelling and planning","volume":"17","author":"Fr\u00f6hlich B.","year":"1997","journal-title":"IEEE Comput. Graphics Appl."},{"key":"e_1_3_1_9_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0887-3801(1999)13:4(261)"},{"key":"e_1_3_1_10_1","doi-asserted-by":"publisher","DOI":"10.1016\/S0926-5805(03)00035-9"},{"key":"e_1_3_1_11_1","doi-asserted-by":"publisher","DOI":"10.1016\/0020-7373(91)90038-9"},{"key":"e_1_3_1_12_1","unstructured":"Goldstein H. (2001). 4D: Science fiction or virtual reality? MCGraw Hill Construction \u2329http:\/\/www.bal4.com\/news\/2001-04-16-construction.pdf\u232a (July 20 2010)."},{"key":"e_1_3_1_13_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0887-3801(2009)23:6(391)"},{"key":"e_1_3_1_14_1","doi-asserted-by":"publisher","DOI":"10.1145\/175222.175230"},{"key":"e_1_3_1_15_1","doi-asserted-by":"publisher","DOI":"10.1080\/0144619042000201376"},{"key":"e_1_3_1_16_1","unstructured":"Hendrickson C. (1998). \u201cProject management for construction.\u201d Department of Civil and Environmental Engineering Carnegie Mellon Univ. Pittsburgh."},{"key":"e_1_3_1_17_1","doi-asserted-by":"crossref","unstructured":"Jongeling R. and Olofsson T. (2006). \u201cA method for planning of work-flow by combined use of location-based scheduling and 4D CAD.\u201d Autom. Constr. in Press.","DOI":"10.1016\/j.autcon.2006.04.001"},{"key":"e_1_3_1_18_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2007)133:6(447)"},{"key":"e_1_3_1_19_1","first-page":"324","article-title":"Benefits and lessons learned of implementing building virtual design and construction (VDC) technologies for coordination of mechanical","volume":"13","author":"Khanzode A.","year":"2008","journal-title":"ITcon"},{"key":"e_1_3_1_20_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CP.1943-5487.0000074"},{"key":"e_1_3_1_21_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2000)126:4(251)"},{"key":"e_1_3_1_22_1","first-page":"258","article-title":"3D model-based collaboration in design development and construction of complex shaped buildings","volume":"13","author":"Ku K.","year":"2008","journal-title":"ITcon"},{"key":"e_1_3_1_23_1","doi-asserted-by":"publisher","DOI":"10.1016\/S0926-5805(03)00019-0"},{"key":"e_1_3_1_24_1","first-page":"246","article-title":"Case studies in BIM implementation for programming of healthcare facilities","volume":"13","author":"Manning R.","year":"2008","journal-title":"ITcon"},{"key":"e_1_3_1_25_1","doi-asserted-by":"publisher","DOI":"10.1162\/105474698565695"},{"key":"e_1_3_1_26_1","first-page":"666","article-title":"Computer-supported cooperative work","author":"Mills K. L.","year":"2007","journal-title":"Encycl. Lib. Inf. Sci."},{"key":"e_1_3_1_27_1","first-page":"362","article-title":"Interoperability in practice: Geometric data exchance using the IFC standard","volume":"13","author":"Pazlar T.","year":"2008","journal-title":"ITcon"},{"key":"e_1_3_1_28_1","doi-asserted-by":"publisher","DOI":"10.1016\/S0954-1810(00)00016-9"},{"key":"e_1_3_1_29_1","doi-asserted-by":"publisher","DOI":"10.1108\/14714170710780101"},{"key":"e_1_3_1_30_1","first-page":"341","article-title":"Multi-constraint information management and visualisation for collaborative planning and control in construction","volume":"8","author":"Sriprasert E.","year":"2003","journal-title":"ITcon"},{"key":"e_1_3_1_31_1","volume-title":"CIB","author":"Sulankivi K.","year":"2010"},{"key":"e_1_3_1_32_1","unstructured":"SVN Client setup. (2009). Gtwiki \u2329http:\/\/www.gtwiki.org\/mwiki\/index.php?title=SVN_Client_setup\u232a (Jul. 30 2010)."},{"key":"e_1_3_1_33_1","unstructured":"Synchro. (2010). Synchro user guide version 3.1415.1 Birmingham U.K."},{"key":"e_1_3_1_34_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2004.06.002"},{"key":"e_1_3_1_35_1","unstructured":"Tekla. (2010). Tekla Structures system manual product version 16.1 Espoo Finland."},{"key":"e_1_3_1_36_1","first-page":"85","article-title":"The utilisation of building information models in nD modelling: A study of data interfacing and adoption barriers","volume":"10","author":"Tse T. K.","year":"2005","journal-title":"ITcon"},{"key":"e_1_3_1_37_1","volume-title":"Essentials of construction project management","author":"Uher T. E.","year":"2004"},{"key":"e_1_3_1_38_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2005.10.010"},{"key":"e_1_3_1_39_1","first-page":"30","article-title":"An interactive approach to collaborative 4D construction planning","volume":"14","author":"Zhou W.","year":"2009","journal-title":"ITcon"}],"container-title":["Journal of Computing in Civil Engineering"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/ascelibrary.org\/doi\/pdf\/10.1061\/%28ASCE%29CP.1943-5487.0000153","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,6,9]],"date-time":"2022-06-09T21:46:07Z","timestamp":1654811167000},"score":1,"resource":{"primary":{"URL":"https:\/\/ascelibrary.org\/doi\/10.1061\/%28ASCE%29CP.1943-5487.0000153"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2012,9]]},"references-count":38,"journal-issue":{"issue":"5","published-print":{"date-parts":[[2012,9]]}},"alternative-id":["10.1061\/(ASCE)CP.1943-5487.0000153"],"URL":"https:\/\/doi.org\/10.1061\/(asce)cp.1943-5487.0000153","relation":{},"ISSN":["0887-3801","1943-5487"],"issn-type":[{"value":"0887-3801","type":"print"},{"value":"1943-5487","type":"electronic"}],"subject":[],"published":{"date-parts":[[2012,9]]},"assertion":[{"value":"2010-08-26","order":0,"name":"received","label":"Received","group":{"name":"publication_history","label":"Publication History"}},{"value":"2011-07-28","order":1,"name":"accepted","label":"Accepted","group":{"name":"publication_history","label":"Publication History"}},{"value":"2011-07-30","order":2,"name":"published","label":"Published","group":{"name":"publication_history","label":"Publication History"}}]}}