{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,30]],"date-time":"2025-10-30T11:23:27Z","timestamp":1761823407549},"reference-count":42,"publisher":"American Society of Civil Engineers (ASCE)","issue":"4","content-domain":{"domain":["ascelibrary.org"],"crossmark-restriction":true},"short-container-title":["J. Comput. Civ. Eng."],"published-print":{"date-parts":[[2012,7]]},"DOI":"10.1061\/(asce)cp.1943-5487.0000155","type":"journal-article","created":{"date-parts":[[2011,7,30]],"date-time":"2011-07-30T22:01:16Z","timestamp":1312063276000},"page":"530-540","update-policy":"http:\/\/dx.doi.org\/10.1061\/do.news.20190416.0001","source":"Crossref","is-referenced-by-count":13,"title":["Planning-Based Approach for Fusing Data from Multiple Sources for Construction Productivity Monitoring"],"prefix":"10.1061","volume":"26","author":[{"given":"Anu","family":"Pradhan","sequence":"first","affiliation":[{"name":"Assistant Professor, Dept. of Civil, Architectural, and Environmental Engineering, Drexel Univ., Philadelphia, PA 19104 (corresponding author)."}]},{"given":"Burcu","family":"Akinci","sequence":"additional","affiliation":[{"name":"Professor, Dept. of Civil and Environmental Engineering, Carnegie Mellon Univ., Pittsburgh, PA 15213."}]}],"member":"30","reference":[{"key":"e_1_3_1_2_1","unstructured":"Aalami F. (1998). \u201cUsing method models to generate 4D production models.\u201d Ph.D. thesis Dept. of Civil and Environmental Engineering Stanford Univ. Palo Alto CA."},{"issue":"1","key":"e_1_3_1_3_1","volume":"102","author":"Adrian J. J.","year":"1976","journal-title":"Modeling method productivity"},{"issue":"2","key":"e_1_3_1_4_1","volume":"15","author":"Akinci B.","year":"2006","journal-title":"A formalism for utilization of sensor systems and integrated project models for active construction quality control"},{"issue":"2","key":"e_1_3_1_5_1","volume":"126","author":"Allmon E.","year":"2000","journal-title":"U.S. Construction labor productivity trends, 1970\u20131998"},{"issue":"4","key":"e_1_3_1_6_1","volume":"15","author":"Bedworth M.","year":"2000","journal-title":"The Omnibus model: A new model of data fusion?"},{"issue":"6","key":"e_1_3_1_7_1","volume":"15","author":"Benjaoran V.","year":"2006","journal-title":"Intelligence approach to production planning system for bespoke precast concrete products"},{"key":"e_1_3_1_8_1","doi-asserted-by":"crossref","unstructured":"Blum A. and Furst M. (1995). \u201cFast planning through planning graph analysis.\u201d Proc. 14th Int. Joint Conf. on Artificial Intelligence (IJCAI 95) Morgan Kaufmann San Francisco 1636\u20131642.","DOI":"10.21236\/ADA303260"},{"issue":"3","key":"e_1_3_1_9_1","volume":"2","author":"Darwiche A.","year":"1988","journal-title":"Oarplan: Generating project plans in a blackboard system by reasoning about objects, actions, and resources"},{"issue":"3","key":"e_1_3_1_10_1","volume":"35","author":"Dasarathy B. V.","year":"1996","journal-title":"Fusion strategies for enhancing decision reliability in multisensor environments"},{"key":"e_1_3_1_11_1","unstructured":"Erikson C. (2000). \u201cHierarchical levels of detail to accelerate the rendering of large static and dynamic polygonal environments.\u201d Ph.D. thesis Dept. of Computer Science Univ. of North Carolina at Chapel Hill Chapel Hill NC."},{"issue":"3","key":"e_1_3_1_12_1","volume":"2","author":"Fikes R. E.","year":"1971","journal-title":"STRIPS: A new approach to the application of theorem proving to problem solving"},{"key":"e_1_3_1_13_1","volume-title":"Automated planning: Theory and practice","author":"Ghallab M.","year":"2004"},{"issue":"1","key":"e_1_3_1_14_1","volume":"21","author":"Gordon C.","year":"2007","journal-title":"Formalism for construction inspection planning: Requirements and process concept"},{"key":"e_1_3_1_15_1","volume-title":"A model for data fusion in civil engineering13th EG-ICE Workshop 2006, Lecture Notes in Computer Science","author":"Haas C. T.","year":"2006"},{"issue":"1","key":"e_1_3_1_16_1","volume":"85","author":"Hall D. L.","year":"1997","journal-title":"An introduction to multisensor data fusion"},{"key":"e_1_3_1_17_1","volume-title":"Mathematical techniques in multisensor data fusion","author":"Hall D. L.","year":"2004"},{"issue":"4","key":"e_1_3_1_18_1","volume":"1","author":"Hendrickson C.","year":"1987","journal-title":"Expert system for construction planning"},{"key":"e_1_3_1_19_1","volume":"14","author":"Hoffmann J.","year":"2001","journal-title":"The FF planning system: Fast plan generation through heuristic search."},{"issue":"3","key":"e_1_3_1_20_1","volume":"126","author":"Kannan G.","year":"2000","journal-title":"Development of an experience database for truck loading operations"},{"issue":"4","key":"e_1_3_1_21_1","volume":"5","author":"Kartam N. A.","year":"1991","journal-title":"Extending artificial intelligence techniques for hierarchical planning"},{"key":"e_1_3_1_22_1","unstructured":"Kautz H. and Selman B. (1992). \u201cPlanning as satisfiability.\u201d Proc. 10th European Conf. on Artificial Intelligence Vol.\u00a0180 Wiley New York 359\u2013363."},{"issue":"2","key":"e_1_3_1_23_1","volume":"127","author":"Khaled E.-R.","year":"2001","journal-title":"Impact of rainfall on the productivity of highway construction"},{"key":"e_1_3_1_24_1","unstructured":"Kiziltas S. (2008). \u201cModel-based construction project history to support estimation of activity production rates.\u201d Ph.D. thesis Dept. of Civil and Environmental Engineering Carnegie Mellon Univ. Pittsburgh."},{"issue":"9","key":"e_1_3_1_25_1","volume":"135","author":"Kiziltas S.","year":"2009","journal-title":"Contextual information requirements of cost estimators from past construction projects"},{"key":"e_1_3_1_26_1","doi-asserted-by":"crossref","unstructured":"Kiziltas S. Pradhan A. and Akinci B. (2007). \u201cFusing data from multiple sources to support project management tasks.\u201d Int. Workshop on Computing in Civil Engineering ASCE Reston VA.","DOI":"10.1061\/40937(261)50"},{"issue":"2","key":"e_1_3_1_27_1","volume":"111","author":"Koehn E.","year":"1985","journal-title":"Climatic effects on construction"},{"issue":"3","key":"e_1_3_1_28_1","volume":"114","author":"Levitt R. E.","year":"1988","journal-title":"Artificial intelligence techniques for generating construction project plans"},{"key":"e_1_3_1_29_1","volume-title":"Shop: Simple hierarchical ordered plannerProc., 16th Int. Joint Conf. on Artificial Intelligence","author":"Nau D. S.","year":"1999"},{"issue":"4","key":"e_1_3_1_30_1","volume":"14","author":"Navon R.","year":"2005","journal-title":"Automated project performance control of construction projects"},{"key":"e_1_3_1_31_1","volume-title":"Productivity improvement in construction","author":"Oglesby C. H.","year":"1989"},{"key":"e_1_3_1_32_1","unstructured":"Penberthy S. Weld D. Nebel B. Rich C. and Swartout W. (1992). \u201cUCPOP: A sound complete partial order planner for ADL.\u201d KR\u201992. Principles of Knowledge Representation and Reasoning: Proc. 3rd. Int. Conf. Morgan Kaufmann San Francisco 103\u2013114."},{"key":"e_1_3_1_33_1","unstructured":"Pradhan A. R. (2009). \u201cAn approach for fusing data from multiple sources to support construction productivity analyses.\u201d Ph.D. thesis Dept. of Civil and Environmental Engineering Carnegie Mellon Univ. Pittsburgh."},{"key":"e_1_3_1_34_1","unstructured":"Pradhan A. R. and Akinci B. (2007). \u201cA planning based approach for fusing data from multiple sources for productivity monitoring.\u201d 2007 ASCE Construction Research Congress ASCE Reston VA."},{"issue":"4","key":"e_1_3_1_35_1","volume":"20","author":"Pradhan A.","year":"2011","journal-title":"Formalisms for query capture and data source identification to support data fusion for construction productivity monitoring"},{"key":"e_1_3_1_36_1","volume-title":"Artificial intelligence: A modern approach","author":"Russel S.","year":"2003","edition":"2"},{"issue":"2","key":"e_1_3_1_37_1","volume":"5","author":"Sacerdoti E. D.","year":"1974","journal-title":"Planning in a hierarchy of abstraction spaces"},{"issue":"10","key":"e_1_3_1_38_1","volume":"137","author":"Shahandashti S. M.","year":"2011","journal-title":"Data-fusion approaches and applications for construction engineering"},{"issue":"3","key":"e_1_3_1_39_1","volume":"125","author":"Smith S. D.","year":"1999","journal-title":"Earthmoving productivity estimation using linear regression techniques"},{"issue":"11","key":"e_1_3_1_40_1","volume":"133","author":"Teizer J.","year":"2007","journal-title":"Real-time three-dimensional occupancy grid modeling for the detection and tracking of construction resources"},{"issue":"4","key":"e_1_3_1_41_1","volume":"113","author":"Thomas H. R.","year":"1987","journal-title":"Factor model of construction productivity"},{"issue":"3","key":"e_1_3_1_42_1","volume":"118","author":"Tommelein I. D.","year":"1992","journal-title":"Site-layout modeling: How can artificial intelligence help?"},{"issue":"1","key":"e_1_3_1_43_1","volume":"20","author":"Younes H.","year":"2003","journal-title":"VHPOP: Versatile heuristic partial order planner"}],"container-title":["Journal of Computing in Civil Engineering"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/ascelibrary.org\/doi\/pdf\/10.1061\/%28ASCE%29CP.1943-5487.0000155","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,6,9]],"date-time":"2022-06-09T23:34:41Z","timestamp":1654817681000},"score":1,"resource":{"primary":{"URL":"https:\/\/ascelibrary.org\/doi\/10.1061\/%28ASCE%29CP.1943-5487.0000155"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2012,7]]},"references-count":42,"journal-issue":{"issue":"4","published-print":{"date-parts":[[2012,7]]}},"alternative-id":["10.1061\/(ASCE)CP.1943-5487.0000155"],"URL":"https:\/\/doi.org\/10.1061\/(asce)cp.1943-5487.0000155","relation":{},"ISSN":["0887-3801","1943-5487"],"issn-type":[{"value":"0887-3801","type":"print"},{"value":"1943-5487","type":"electronic"}],"subject":[],"published":{"date-parts":[[2012,7]]},"assertion":[{"value":"2011-03-24","order":0,"name":"received","label":"Received","group":{"name":"publication_history","label":"Publication History"}},{"value":"2011-07-28","order":1,"name":"accepted","label":"Accepted","group":{"name":"publication_history","label":"Publication History"}},{"value":"2011-07-30","order":2,"name":"published","label":"Published","group":{"name":"publication_history","label":"Publication History"}}]}}