{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,7]],"date-time":"2026-04-07T16:43:21Z","timestamp":1775580201557,"version":"3.50.1"},"reference-count":111,"publisher":"American Society of Civil Engineers (ASCE)","issue":"3","content-domain":{"domain":["ascelibrary.org"],"crossmark-restriction":true},"short-container-title":["J. Comput. Civ. Eng."],"published-print":{"date-parts":[[2012,5]]},"DOI":"10.1061\/(asce)cp.1943-5487.0000157","type":"journal-article","created":{"date-parts":[[2011,8,5]],"date-time":"2011-08-05T13:38:31Z","timestamp":1312551511000},"page":"396-408","update-policy":"https:\/\/doi.org\/10.1061\/do.news.20190416.0001","source":"Crossref","is-referenced-by-count":28,"title":["Performance of Shuffled Frog-Leaping Algorithm in Finance-Based Scheduling"],"prefix":"10.1061","volume":"26","author":[{"given":"Anas","family":"Alghazi","sequence":"first","affiliation":[{"name":"Lecturer, System Engineering Dept., King Fahd Univ. of Petroleum &amp; Minerals, Dhahran 31261, Saudi Arabia."}]},{"given":"Shokri Z.","family":"Selim","sequence":"additional","affiliation":[{"name":"Professor, System Engineering Dept., King Fahd Univ. of Petroleum &amp; Minerals, Dhahran 31261, Saudi Arabia."}]},{"given":"Ashraf","family":"Elazouni","sequence":"additional","affiliation":[{"name":"Associate Professor, Construction Engineering and Management Dept., King Fahd Univ. of Petroleum &amp; Minerals, P.O. Box 346, Dhahran 31261, Saudi Arabia (corresponding author)."}]}],"member":"30","reference":[{"key":"e_1_3_2_2_1","doi-asserted-by":"crossref","unstructured":"Abu-Lebdeh G. and Benekohal R. (2000). \u201cGenetic algorithms for traffic signal control and queue management of oversaturated two-way arterials.\u201d Trans. Res. Rec. 1727 61\u201367.","DOI":"10.3141\/1727-08"},{"key":"e_1_3_2_3_1","unstructured":"Alghazi A. (2009). \u201cFinance-based scheduling of activity networks.\u201d M.Sc. thesis System Engineering Dept. King Fahd University of Petroleum & Minerals Dhahran Saudi Arabia."},{"issue":"9","key":"e_1_3_2_4_1","volume":"27","author":"Ali M.","year":"2009","journal-title":"Finance-based CPM\/LOB scheduling of projects with repetitive non-serial activities"},{"issue":"6","key":"e_1_3_2_5_1","volume":"133","author":"Alimoradi A.","year":"2007","journal-title":"Probabilistic performance-based optimal design of steel moment-resisting frames. II: Applications"},{"issue":"4","key":"e_1_3_2_6_1","volume":"23","author":"Al-Sobiei O.","year":"2005","journal-title":"Predicting the risk of contractor default in Saudi Arabia utilizing artificial neural network (ANN) and genetic algorithm (GA) techniques"},{"issue":"10","key":"e_1_3_2_7_1","volume":"40","author":"Al-Tabtabai H.","year":"1998","journal-title":"An evolutionary approach to the capital budgeting of construction projects"},{"issue":"2","key":"e_1_3_2_8_1","volume":"28","author":"Anagnostopoulos K.","year":"2010","journal-title":"A simulated annealing hyperheuristic for construction resource levelling"},{"issue":"6","key":"e_1_3_2_9_1","volume":"117","author":"Balling R.","year":"1991","journal-title":"Optimal steel frame design by simulated annealing"},{"issue":"6","key":"e_1_3_2_10_1","volume":"15","author":"Benjaoran V.","year":"2006","journal-title":"Intelligence approach to production planning system for bespoke precast concrete products"},{"issue":"1","key":"e_1_3_2_11_1","volume":"23","author":"Benjaoran V.","year":"2005","journal-title":"Flowshop scheduling model for bespoke precast concrete production planning"},{"issue":"17","key":"e_1_3_2_12_1","volume":"79","author":"Ceranic B.","year":"2001","journal-title":"An application of simulated annealing to the optimum design of reinforced concrete retaining structures"},{"issue":"1","key":"e_1_3_2_13_1","volume":"34","author":"Chakroborty P.","year":"2002","journal-title":"Optimal route network design for transit systems using genetic algorithms"},{"issue":"3","key":"e_1_3_2_14_1","volume":"16","author":"Chan W.","year":"2002","journal-title":"Production scheduling for precast plants using a flow shop sequencing model"},{"issue":"4","key":"e_1_3_2_15_1","volume":"13","author":"Chau K.","year":"2004","journal-title":"A two-stage dynamic model on allocation of construction facilities with genetic algorithm"},{"issue":"4","key":"e_1_3_2_16_1","volume":"18","author":"Chen P. H.","year":"2009","journal-title":"Hybrid of genetic algorithm and simulated annealing for multiple project scheduling with multiple resource constraints"},{"issue":"4","key":"e_1_3_2_17_1","volume":"18","author":"Chen P. H.","year":"2009","journal-title":"A two-phase GA model for resource-constrained project scheduling"},{"issue":"3","key":"e_1_3_2_18_1","volume":"19","author":"Cheng M. Y.","year":"2010","journal-title":"Project success prediction using an evolutionary support vector machine inference model"},{"issue":"4","key":"e_1_3_2_19_1","volume":"23","author":"Chung G.","year":"2009","journal-title":"Application of the shuffled frog leaping algorithm for the optimization of a general large-scale water supply system"},{"issue":"1","key":"e_1_3_2_20_1","volume":"24","author":"Dawood N.","year":"2006","journal-title":"Construction scheduling using multi-constraint and genetic algorithms approach"},{"issue":"4","key":"e_1_3_2_21_1","volume":"34","author":"Degertekin S.","year":"2007","journal-title":"A comparison of simulated annealing and genetic algorithm for optimum design of nonlinear steel space frames"},{"issue":"6","key":"e_1_3_2_22_1","volume":"8","author":"Degertekin S.","year":"2008","journal-title":"A hybrid tabu-simulated annealing heuristic algorithm for optimum design of steel frames"},{"issue":"10","key":"e_1_3_2_23_1","volume":"132","author":"Dogan S.","year":"2006","journal-title":"Determining attribute weights in a CBR model for early cost prediction of structural systems"},{"key":"e_1_3_2_24_1","unstructured":"Dorigo M. (1992). \u201cOptimization learning and natural algorithms.\u201d Ph.D. thesis Politecnico di Milano Italy."},{"issue":"12","key":"e_1_3_2_25_1","volume":"132","author":"East E.","year":"2006","journal-title":"Multiproject planning and resource controls for facility management"},{"issue":"4","key":"e_1_3_2_26_1","volume":"131","author":"Elazouni A.","year":"2005","journal-title":"Finance-based scheduling: Tool to maximize project profit using improved genetic algorithms"},{"issue":"8","key":"e_1_3_2_27_1","volume":"21","author":"Elbehairy H.","year":"2006","journal-title":"Comparison of two evolutionary algorithms for optimization of bridge deck repairs"},{"issue":"1","key":"e_1_3_2_28_1","volume":"19","author":"Elbeltagi E.","year":"2005","journal-title":"Comparison among five evolutionary-based optimization algorithms"},{"issue":"1","key":"e_1_3_2_29_1","volume":"3","author":"Elbeltagi E.","year":"2007","journal-title":"A modified shuffled frog-leaping optimization algorithm: Applications to project management"},{"issue":"7","key":"e_1_3_2_30_1","volume":"19","author":"Elbeltagi E.","year":"2001","journal-title":"Schedule-dependent evolution of site layout planning"},{"issue":"3","key":"e_1_3_2_31_1","volume":"129","author":"Eusuff M.","year":"2003","journal-title":"Optimization of water distribution network design using the shuffled frog leaping algorithm"},{"issue":"2","key":"e_1_3_2_32_1","volume":"38","author":"Eusuff M.","year":"2006","journal-title":"Shuffled frog-leaping algorithm: A memetic meta-heuristic for discrete optimization"},{"issue":"5","key":"e_1_3_2_33_1","volume":"18","author":"Eshtehardian E.","year":"2009","journal-title":"Fuzzy-based MOGA approach to stochastic time-cost trade-off problem"},{"issue":"1","key":"e_1_3_2_34_1","volume":"135","author":"Ezeldin A.","year":"2009","journal-title":"Hybrid time-cost optimization of nonserial repetitive construction projects"},{"issue":"5","key":"e_1_3_2_35_1","volume":"14","author":"Fathi H.","year":"2010","journal-title":"GA-based multi-objective optimization of finance-based construction project scheduling"},{"issue":"3","key":"e_1_3_2_36_1","volume":"11","author":"Feng C. W.","year":"1997","journal-title":"Using genetic algorithms to solve construction time-cost trade-off problems"},{"key":"e_1_3_2_37_1","volume-title":"Artificial intelligence through simulated evolution","author":"Fogel L.","year":"1966"},{"issue":"1","key":"e_1_3_2_38_1","volume":"8","author":"Glover F.","year":"1977","journal-title":"Heuristics for integer programming using surrogate constraints"},{"issue":"5","key":"e_1_3_2_39_1","volume":"13","author":"Glover F.","year":"1986","journal-title":"Future paths for integer programming and links to artificial intelligence"},{"issue":"3","key":"e_1_3_2_40_1","volume":"189","author":"Gon\u00e7alves J.","year":"2008","journal-title":"A genetic algorithm for the resource constrained multi-project scheduling problem"},{"issue":"1","key":"e_1_3_2_41_1","volume":"125","author":"Haidar A.","year":"1999","journal-title":"Genetic algorithms application and testing for equipment selection"},{"issue":"2","key":"e_1_3_2_42_1","volume":"41","author":"Hasan\u00e7ebi O.","year":"2010","journal-title":"Improving the performance of simulated annealing in structural optimization"},{"issue":"3","key":"e_1_3_2_43_1","volume":"198","author":"He Z.","year":"2009","journal-title":"Simulated annealing and tabu search for multi-mode project payment scheduling"},{"issue":"3","key":"e_1_3_2_44_1","volume":"125","author":"Hegazy T.","year":"1999","journal-title":"Optimization of resource allocation and leveling using genetic algorithms"},{"issue":"6","key":"e_1_3_2_45_1","volume":"26","author":"Hegazy T.","year":"1999","journal-title":"Optimization of construction time-cost trade-off analysis using genetic algorithms"},{"issue":"2","key":"e_1_3_2_46_1","volume":"130","author":"Hegazy T.","year":"2004","journal-title":"Distributed scheduling model for infrastructure networks"},{"issue":"6","key":"e_1_3_2_47_1","volume":"127","author":"Hegazy T.","year":"2001","journal-title":"Simplified spreadsheet solutions. II: Overall schedule optimization"},{"issue":"4","key":"e_1_3_2_48_1","volume":"134","author":"Hegazy T.","year":"2008","journal-title":"Efficient repetitive scheduling for high-rise construction"},{"issue":"6","key":"e_1_3_2_49_1","volume":"129","author":"Hegazy T.","year":"2003","journal-title":"Resource optimization using combined simulation and genetic algorithms"},{"issue":"4","key":"e_1_3_2_50_1","volume":"129","author":"Hegazy T.","year":"2003","journal-title":"Genetic optimization for dynamic project control"},{"issue":"3","key":"e_1_3_2_51_1","volume":"127","author":"Hegazy T.","year":"2001","journal-title":"Cost optimization in projects with repetitive nonserial activities"},{"key":"e_1_3_2_52_1","volume-title":"Adaptation in natural and artificial systems","author":"Holland J. H.","year":"1975"},{"issue":"9","key":"e_1_3_2_53_1","volume":"33","author":"Huang R. Y.","year":"2006","journal-title":"An optimization model for workgroup-based repetitive scheduling"},{"issue":"8","key":"e_1_3_2_54_1","volume":"27","author":"Hyari K.","year":"2009","journal-title":"Automated trade-off between time and cost in planning repetitive construction projects"},{"issue":"1","key":"e_1_3_2_55_1","volume":"22","author":"Hyari K.","year":"2006","journal-title":"Optimal planning and scheduling for repetitive construction projects"},{"issue":"4","key":"e_1_3_2_56_1","volume":"16","author":"Jang H.","year":"2007","journal-title":"Optimization of floor-level construction material layout using genetic algorithms"},{"issue":"1","key":"e_1_3_2_57_1","volume":"70","author":"Jeffcoat D.","year":"1993","journal-title":"Simulated annealing for resource-constrained scheduling"},{"issue":"6","key":"e_1_3_2_58_1","volume":"14","author":"Jin Z.","year":"2005","journal-title":"Application of fuzzy GA for optimal vibration control of smart cylindrical shells"},{"issue":"4","key":"e_1_3_2_59_1","volume":"15","author":"Jong J. C.","year":"2000","journal-title":"Preliminary highway design with genetic algorithms and geographic information systems"},{"issue":"2","key":"e_1_3_2_60_1","volume":"19","author":"Jun D.","year":"2010","journal-title":"Optimizing the utilization of multiple labor shifts in construction projects"},{"issue":"5","key":"e_1_3_2_61_1","volume":"132","author":"Kandil A.","year":"2006","journal-title":"Parallel genetic algorithms for optimizing resource utilization in large-scale construction projects"},{"key":"e_1_3_2_62_1","doi-asserted-by":"crossref","unstructured":"Kennedy J. and Eberhart R. (1995). \u201cParticle swarm optimization.\u201d Proc. IEEE Int. Conf. on Neural Networks Vol. 4 Perth Australia 1942\u20131948.","DOI":"10.1109\/ICNN.1995.488968"},{"issue":"4","key":"e_1_3_2_63_1","volume":"22","author":"Khalafallah A.","year":"2006","journal-title":"Optimizing airport construction site layouts to minimize wildlife hazards"},{"issue":"2","key":"e_1_3_2_64_1","volume":"136","author":"Kim J. L.","year":"2010","journal-title":"Comparing schedule generation schemes in resource-constrained project scheduling using elitist genetic algorithm"},{"issue":"4598","key":"e_1_3_2_65_1","volume":"220","author":"Kirkpatrick S.","year":"1983","journal-title":"Optimization by simulated annealing"},{"issue":"4","key":"e_1_3_2_66_1","volume":"133","author":"Ko C. H.","year":"2007","journal-title":"Dynamic prediction of project success using artificial intelligence"},{"issue":"7","key":"e_1_3_2_67_1","volume":"19","author":"Ko C. H.","year":"2010","journal-title":"GA-based decision support systems for precast production planning"},{"issue":"5","key":"e_1_3_2_68_1","volume":"37","author":"Koo C.","year":"2010","journal-title":"A CBR-based hybrid model for predicting a construction duration and cost based on project characteristics in multi-family housing projects"},{"issue":"10","key":"e_1_3_2_69_1","volume":"48","author":"Kuo J. T.","year":"2003","journal-title":"Multiobjective water resources systems analysis using genetic algorithms\u2014Application to Chou-Shui River Basin, Taiwan"},{"issue":"4","key":"e_1_3_2_70_1","volume":"18","author":"Lam K. C.","year":"2009","journal-title":"The fuzzy GA-based multi-objective financial decision support model for Chinese state-owned construction firms"},{"issue":"10","key":"e_1_3_2_71_1","volume":"135","author":"Lam K. C.","year":"2009","journal-title":"Conjoining MMAS to GA to solve construction site layout planning problem"},{"issue":"1","key":"e_1_3_2_72_1","volume":"19","author":"Leu S. S.","year":"2001","journal-title":"A GA-based fuzzy optimal model for construction time-cost trade-off"},{"issue":"2","key":"e_1_3_2_73_1","volume":"20","author":"Leu S. S.","year":"2002","journal-title":"A genetic algorithm-based optimal resource-constrained scheduling simulation model"},{"issue":"6","key":"e_1_3_2_74_1","volume":"125","author":"Leu S. S.","year":"1999","journal-title":"GA-based multicriteria optimal model for construction scheduling"},{"issue":"1","key":"e_1_3_2_75_1","volume":"10","author":"Leu S. S.","year":"2000","journal-title":"Resource leveling in construction by genetic algorithm-based optimization and its decision support system application"},{"issue":"5","key":"e_1_3_2_76_1","volume":"125","author":"Li H.","year":"1999","journal-title":"Using machine learning and GA to solve time-cost trade-off problems"},{"issue":"2","key":"e_1_3_2_77_1","volume":"9","author":"Li H.","year":"2000","journal-title":"Genetic search for solving construction site-level unequal-area facility layout problems"},{"issue":"2","key":"e_1_3_2_78_1","volume":"136","author":"Li Y.","year":"2010","journal-title":"Novel multiobjective shuffled frog leaping algorithm with application to reservoir flood control operation"},{"issue":"4","key":"e_1_3_2_79_1","volume":"18","author":"Long L.","year":"2009","journal-title":"A genetic algorithm-based method for scheduling repetitive construction projects"},{"issue":"1","key":"e_1_3_2_80_1","volume":"130","author":"Marzouk M.","year":"2004","journal-title":"Multiobjective optimization of earthmoving operations"},{"key":"e_1_3_2_81_1","unstructured":"MATLAB 7.4 [Computer software]. Massachusetts MathWorks Inc."},{"issue":"5","key":"e_1_3_2_82_1","volume":"128","author":"Mawdesley M.","year":"2002","journal-title":"Genetic algorithms for construction site layout in project planning"},{"issue":"6","key":"e_1_3_2_83_1","volume":"13","author":"McCrea A.","year":"2004","journal-title":"Application of GA in optimal robot selection for bridge restoration"},{"issue":"3","key":"e_1_3_2_84_1","volume":"164","author":"Mika M.","year":"2005","journal-title":"Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models"},{"issue":"10","key":"e_1_3_2_85_1","volume":"135","author":"Moselhi O.","year":"2009","journal-title":"Optimization of earthmoving operations in heavy civil engineering projects"},{"issue":"10","key":"e_1_3_2_86_1","volume":"135","author":"Orabi W.","year":"2009","journal-title":"Optimizing postdisaster reconstruction planning for damaged transportation networks"},{"issue":"6","key":"e_1_3_2_87_1","volume":"12","author":"Osman H.","year":"2003","journal-title":"A hybrid CAD-based construction site layout planning system using genetic algorithms"},{"key":"e_1_3_2_88_1","doi-asserted-by":"crossref","unstructured":"Park B. and Lee J. (2009). \u201cOptimization of coordinated-actuated traffic signal system: Stochastic optimization method based on shuffled frog-leaping algorithm.\u201d Trans. Res. Rec. 2128 76\u201385.","DOI":"10.3141\/2128-08"},{"key":"e_1_3_2_89_1","doi-asserted-by":"crossref","unstructured":"Park B. Messer C. and Urbanik T.II (1999). \u201cTraffic signal optimization program for oversaturated conditions: Genetic algorithm approach.\u201d Trans. Res. Rec. 1683 133\u2013142.","DOI":"10.3141\/1683-17"},{"issue":"8","key":"e_1_3_2_90_1","volume":"23","author":"Paya I.","year":"2008","journal-title":"Multiobjective optimization of concrete frames by simulated annealing"},{"issue":"8","key":"e_1_3_2_91_1","volume":"190","author":"Ponterosso P.","year":"2000","journal-title":"Masonry arch collapse loads and mechanisms by heuristically seeded genetic algorithm"},{"issue":"5","key":"e_1_3_2_92_1","volume":"16","author":"Rajasekaran S.","year":"2003","journal-title":"Optimal lay-up of hybrid composite beams, plates and shells using cellular genetic algorithm"},{"issue":"12","key":"e_1_3_2_93_1","volume":"133","author":"Salem O.","year":"2007","journal-title":"Minimizing cutting wastes of reinforcement steel bars using genetic algorithms and integer programming models"},{"issue":"7","key":"e_1_3_2_94_1","volume":"134","author":"Sanad H.","year":"2008","journal-title":"Optimal construction site layout considering safety and environmental aspects"},{"issue":"12","key":"e_1_3_2_95_1","volume":"39","author":"Senouci A.","year":"2008","journal-title":"Genetic algorithm-based multi-objective model for scheduling of linear construction projects"},{"issue":"6","key":"e_1_3_2_96_1","volume":"130","author":"Senouci A.","year":"2004","journal-title":"Use of genetic algorithms in resource scheduling of construction projects"},{"issue":"1","key":"e_1_3_2_97_1","volume":"36","author":"Shrivastava P.","year":"2002","journal-title":"Application of genetic algorithm for scheduling and schedule coordination problems"},{"key":"e_1_3_2_98_1","unstructured":"Smith S. F. (1980). \u201cA learning system based on genetic adaptive algorithms.\u201d Ph.D. thesis Univ. of Pittsburgh Pittsburgh PA."},{"issue":"3","key":"e_1_3_2_99_1","volume":"13","author":"Srinivasan D.","year":"2000","journal-title":"Development of an intelligent technique for traffic network incident detection"},{"issue":"3","key":"e_1_3_2_100_1","volume":"21","author":"Tam C.","year":"2003","journal-title":"GA-ANN model for optimizing the locations of tower crane and supply points for high-rise public housing construction"},{"issue":"4","key":"e_1_3_2_101_1","author":"Tam C.","year":"2001","journal-title":"Genetic algorithm for optimizing supply locations around tower crane"},{"issue":"11","key":"e_1_3_2_102_1","volume":"25","author":"Tam C.","year":"2007","journal-title":"An integrated system for earthmoving planning"},{"issue":"5","key":"e_1_3_2_103_1","volume":"27","author":"Tang L.","year":"2009","journal-title":"An entropy-based financial decision support system (e-FDSS) for project analysis in construction SMEs"},{"issue":"2","key":"e_1_3_2_104_1","volume":"8","author":"Topping B.","year":"1996","journal-title":"Topological design of truss structures using simulated annealing"},{"issue":"3","key":"e_1_3_2_105_1","volume":"18","author":"Toropov V.","year":"2001","journal-title":"Design optimization of structural steelwork using a genetic algorithm, FEM and a system of design rules"},{"key":"e_1_3_2_106_1","doi-asserted-by":"crossref","unstructured":"Tsai B. W. Kannekanti V. and Harvey J. (2004). \u201cApplication of genetic algorithm in asphalt pavement design.\u201d Transp. Res. Rec. 1891 112\u2013120.","DOI":"10.3141\/1891-14"},{"issue":"3","key":"e_1_3_2_107_1","volume":"9","author":"Yeh I. C.","year":"1995","journal-title":"Construction-site layout using annealed neural network"},{"issue":"3","key":"e_1_3_2_108_1","volume":"30","author":"Yepes V.","year":"2008","journal-title":"A parametric study of optimum earth-retaining walls by simulated annealing"},{"issue":"1","key":"e_1_3_2_109_1","volume":"36","author":"Yin Y.","year":"2002","journal-title":"Multiobjective bilevel optimization for transportation planning and management problems"},{"issue":"11","key":"e_1_3_2_110_1","volume":"135","author":"Zahraie B.","year":"2009","journal-title":"Stochastic time-cost-resource utilization optimization using nondominated sorting genetic algorithm and discrete fuzzy sets"},{"issue":"9","key":"e_1_3_2_111_1","volume":"136","author":"Zhao Z.","year":"2010","journal-title":"Application of innovative critical chain method for project planning and control under resource constraints and uncertainty"},{"issue":"1","key":"e_1_3_2_112_1","volume":"131","author":"Zheng D.","year":"2005","journal-title":"Applying pareto ranking and niche formation to genetic algorithm-based multiobjective time-cost optimization"}],"container-title":["Journal of Computing in Civil Engineering"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/ascelibrary.org\/doi\/pdf\/10.1061\/%28ASCE%29CP.1943-5487.0000157","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,6,10]],"date-time":"2022-06-10T01:08:34Z","timestamp":1654823314000},"score":1,"resource":{"primary":{"URL":"https:\/\/ascelibrary.org\/doi\/10.1061\/%28ASCE%29CP.1943-5487.0000157"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2012,5]]},"references-count":111,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2012,5]]}},"alternative-id":["10.1061\/(ASCE)CP.1943-5487.0000157"],"URL":"https:\/\/doi.org\/10.1061\/(asce)cp.1943-5487.0000157","relation":{},"ISSN":["0887-3801","1943-5487"],"issn-type":[{"value":"0887-3801","type":"print"},{"value":"1943-5487","type":"electronic"}],"subject":[],"published":{"date-parts":[[2012,5]]},"assertion":[{"value":"2010-12-05","order":0,"name":"received","label":"Received","group":{"name":"publication_history","label":"Publication History"}},{"value":"2011-08-02","order":1,"name":"accepted","label":"Accepted","group":{"name":"publication_history","label":"Publication History"}},{"value":"2011-08-04","order":2,"name":"published","label":"Published","group":{"name":"publication_history","label":"Publication History"}}]}}