{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,6]],"date-time":"2026-03-06T04:05:14Z","timestamp":1772769914558,"version":"3.50.1"},"reference-count":31,"publisher":"American Society of Civil Engineers (ASCE)","issue":"1","content-domain":{"domain":["ascelibrary.org"],"crossmark-restriction":true},"short-container-title":["J. Comput. Civ. Eng."],"published-print":{"date-parts":[[2014,1]]},"DOI":"10.1061\/(asce)cp.1943-5487.0000242","type":"journal-article","created":{"date-parts":[[2012,11,17]],"date-time":"2012-11-17T03:17:39Z","timestamp":1353122259000},"page":"103-112","update-policy":"https:\/\/doi.org\/10.1061\/do.news.20190416.0001","source":"Crossref","is-referenced-by-count":115,"title":["Vision-Based Tower Crane Tracking for Understanding Construction Activity"],"prefix":"10.1061","volume":"28","author":[{"given":"Jun","family":"Yang","sequence":"first","affiliation":[{"name":"Assistant Professor, Northwestern Polytechnical Univ., Xi\u2019an 710072, China (corresponding author)."}]},{"given":"Patricio","family":"Vela","sequence":"additional","affiliation":[{"name":"Assistant Professor, School of Electrical and Computer Engineering, Georgia Institute of Technology, Atlanta, GA 30332."}]},{"given":"Jochen","family":"Teizer","sequence":"additional","affiliation":[{"name":"Assistant Professor, School of Civil and Environmental Engineering, Georgia Institute of Technology, Atlanta, GA 30332."}]},{"given":"Zhongke","family":"Shi","sequence":"additional","affiliation":[{"name":"Professor, Northwestern Polytechnical Univ., Xi\u2019an 710072, China."}]}],"member":"30","reference":[{"key":"e_1_3_2_2_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(1999)125:2(87)"},{"key":"e_1_3_2_3_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0887-3801(2002)16:4(269)"},{"key":"e_1_3_2_4_1","unstructured":"Bolivar A. and Mee A. S. (1997). \u201cActivity analysis using computer-processed time lapse video.\u201d Construction Congress V: Managing Engineered Construction in Expanding Global Markets ASCE Reston VA 462\u2013469."},{"key":"e_1_3_2_5_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.aei.2011.01.003"},{"key":"e_1_3_2_6_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2011.05.001"},{"key":"e_1_3_2_7_1","unstructured":"Construction Industry Institute (CII). (2010). \u201cGuide to activity analysis.\u201d Rep. No. Implementation Resource 252-2a Univ. of Texas at Austin Austin TX."},{"key":"e_1_3_2_8_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(1993)119:1(23)"},{"key":"e_1_3_2_9_1","doi-asserted-by":"crossref","unstructured":"Gong J. and Caldas C. (2011). \u201cLearning and classifying motions of construction workers and equipment using bag of video feature words and bayesian learning methods.\u201d Proc. Int. Workshop on Computing in Civil Engineering ASCE Reston VA 274\u2013281.","DOI":"10.1061\/41182(416)34"},{"key":"e_1_3_2_10_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CP.1943-5487.0000027"},{"key":"e_1_3_2_11_1","unstructured":"Grau D. and Caldas C. (2007). \u201cA framework for automated localization of on-site construction components.\u201d Proc. Construction Research Congress ASCE\/CIP Reston VA."},{"key":"e_1_3_2_12_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2009.04.001"},{"key":"e_1_3_2_13_1","volume-title":"Multiple view geometry in computer vision","author":"Hartley R.","year":"2003"},{"key":"e_1_3_2_14_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9399(2005)131:1(88)"},{"key":"e_1_3_2_15_1","unstructured":"Kim S. H. and Bai Y. (2007). \u201cDevelopment of a real-time productivity measurement system for bridge replacement.\u201d Proc. Mid-Continent Transpiration Research Symp. Iowa State University Ames IA."},{"key":"e_1_3_2_16_1","doi-asserted-by":"crossref","unstructured":"Luo X. Leite F. and O\u2019Brien W. (2011). \u201cRequirements for autonomous crane safety monitoring.\u201d Proc. Int. Workshop on Computing in Civil Engineering ASCE Reston VA 331\u2013338.","DOI":"10.1061\/41182(416)41"},{"key":"e_1_3_2_17_1","doi-asserted-by":"crossref","unstructured":"Makhmalbaf A. Park M. Yang J. Brilakis I. and Vela P. (2010). \u201c2D vision tracking methods\u2019 performance comparison for 3D tracking of construction resources.\u201d Proc. Construction Research Congress 2010: Innovation for Reshaping Construction Practice ASCE VA 459\u2013469.","DOI":"10.1061\/41109(373)46"},{"key":"e_1_3_2_18_1","doi-asserted-by":"crossref","unstructured":"McCullouch B. (1997). \u201cAutomating field data collection in construction organizations.\u201d Proc. 5th Construction Congress: Managing Engineered Construction in Expanding Global Markets ASCE Reston VA 957\u2013963.","DOI":"10.5703\/1288284313466"},{"key":"e_1_3_2_19_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2006.08.001"},{"key":"e_1_3_2_20_1","volume-title":"Productivity improvement in construction","author":"Oglesby C.","year":"1989"},{"key":"e_1_3_2_21_1","doi-asserted-by":"publisher","DOI":"10.1109\/TSMC.1979.4310076"},{"key":"e_1_3_2_22_1","unstructured":"Pradhan A. and Akinci B. (2007). \u201cA planning based approach for fusing data from multiple sources for productivity monitoring.\u201d Proc. Construction Research Congress ASCE\/CIB Reston VA."},{"key":"e_1_3_2_23_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2010.11.009"},{"key":"e_1_3_2_24_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2008)134:5(320)"},{"key":"e_1_3_2_25_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0887-3801(2008)22:1(21)"},{"key":"e_1_3_2_26_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.aei.2009.06.011"},{"key":"e_1_3_2_27_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(1991)117:3(423)"},{"key":"e_1_3_2_28_1","doi-asserted-by":"publisher","DOI":"10.1109\/34.598236"},{"key":"e_1_3_2_29_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.aei.2010.06.008"},{"key":"e_1_3_2_30_1","doi-asserted-by":"crossref","unstructured":"Yang J. Vela P. A. Teizer J. and Shi Z. (2011). \u201cVision-based crane tracking for understanding construction activity.\u201d Proc. Int. Workshop on Computing in Civil Engineering ASCE Reston VA 258\u2013265.","DOI":"10.1061\/41182(416)32"},{"key":"e_1_3_2_31_1","doi-asserted-by":"crossref","unstructured":"Zavichi A. and Behzadan A. (2011). \u201cA real time decision support system for enhanced crane operations in construction and manufacturing.\u201d Proc. Int. Workshop on Computing in Civil Engineering ASCE Reston VA 586\u2013593.","DOI":"10.1061\/41182(416)72"},{"key":"e_1_3_2_32_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0887-3801(2007)21:4(238)"}],"container-title":["Journal of Computing in Civil Engineering"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/ascelibrary.org\/doi\/pdf\/10.1061\/%28ASCE%29CP.1943-5487.0000242","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,6,10]],"date-time":"2022-06-10T00:16:01Z","timestamp":1654820161000},"score":1,"resource":{"primary":{"URL":"https:\/\/ascelibrary.org\/doi\/10.1061\/%28ASCE%29CP.1943-5487.0000242"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2014,1]]},"references-count":31,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2014,1]]}},"alternative-id":["10.1061\/(ASCE)CP.1943-5487.0000242"],"URL":"https:\/\/doi.org\/10.1061\/(asce)cp.1943-5487.0000242","relation":{},"ISSN":["0887-3801","1943-5487"],"issn-type":[{"value":"0887-3801","type":"print"},{"value":"1943-5487","type":"electronic"}],"subject":[],"published":{"date-parts":[[2014,1]]},"assertion":[{"value":"2011-09-19","order":0,"name":"received","label":"Received","group":{"name":"publication_history","label":"Publication History"}},{"value":"2012-07-23","order":1,"name":"accepted","label":"Accepted","group":{"name":"publication_history","label":"Publication History"}},{"value":"2012-11-17","order":2,"name":"published","label":"Published","group":{"name":"publication_history","label":"Publication History"}}]}}