{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,1,14]],"date-time":"2026-01-14T18:25:57Z","timestamp":1768415157482,"version":"3.49.0"},"reference-count":35,"publisher":"American Society of Civil Engineers (ASCE)","issue":"3","content-domain":{"domain":["ascelibrary.org"],"crossmark-restriction":true},"short-container-title":["J. Comput. Civ. Eng."],"published-print":{"date-parts":[[2015,5]]},"DOI":"10.1061\/(asce)cp.1943-5487.0000340","type":"journal-article","created":{"date-parts":[[2013,7,1]],"date-time":"2013-07-01T05:09:22Z","timestamp":1372655362000},"update-policy":"https:\/\/doi.org\/10.1061\/do.news.20190416.0001","source":"Crossref","is-referenced-by-count":29,"title":["Information Retrieval Framework for Hazard Identification in Construction"],"prefix":"10.1061","volume":"29","author":[{"given":"Hyunsoo","family":"Kim","sequence":"first","affiliation":[{"name":"Ph.D. Student, Dept. of Architecture, Seoul National Univ., San 56-1 Shinrim-dong, Seoul 151-742, Korea."}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Hyun-Soo","family":"Lee","sequence":"additional","affiliation":[{"name":"Professor, Dept. of Architecture, Seoul National Univ., San 56-1 Shinrim-dong, Seoul 151-742, Korea."}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Moonseo","family":"Park","sequence":"additional","affiliation":[{"name":"Professor, Dept. of Architecture, Seoul National Univ., San 56-1 Shinrim-dong, Seoul 151-742, Korea."}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"BooYoung","family":"Chung","sequence":"additional","affiliation":[{"name":"Principal Engineer, Public\/SIE Business Development Division, Samsung SDS Co., Ltd., 707-19 Yuksam-dong, Gangnam-gu, Seoul 135-918, Korea (corresponding author)."}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Sungjoo","family":"Hwang","sequence":"additional","affiliation":[{"name":"Ph.D. Student, Dept. of Architecture, Seoul National Univ., San 56-1 Shinrim-dong, Seoul 151-742, Korea."}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"30","reference":[{"key":"e_1_3_3_2_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2003)129:2(152)"},{"key":"e_1_3_3_3_1","unstructured":"Ahn H. (1994). \u201cA knowledge model for enhancing construction hazard communication.\u201d Ph.D. dissertation Seoul National Univ. Seoul Korea."},{"key":"e_1_3_3_4_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2006)132:2(197)"},{"key":"e_1_3_3_5_1","volume-title":"Construction project management: Planning, scheduling and controlling","author":"Chitkara K. K.","year":"1998"},{"key":"e_1_3_3_6_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CO.1943-7862.0000063"},{"key":"e_1_3_3_7_1","doi-asserted-by":"crossref","unstructured":"Chua D. K. H. and Goh T. M. (2002). \u201cApplication of case based reasoning in construction safety planning.\u201d Proc. Int. Workshop on IT in Civil Engineering ASCE Washington DC 298\u2013307.","DOI":"10.1061\/40652(2003)25"},{"key":"e_1_3_3_8_1","doi-asserted-by":"publisher","DOI":"10.1016\/S0098-1354(98)00135-5"},{"key":"e_1_3_3_9_1","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-662-04943-3"},{"key":"e_1_3_3_10_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2005)131:11(1233)"},{"key":"e_1_3_3_11_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CO.1943-7862.0000116"},{"key":"e_1_3_3_12_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CO.1943-7862.0000071"},{"key":"e_1_3_3_13_1","unstructured":"Hamil S. (2013). \u201cBIM objects from manufacturers.\u201d \u2329http:\/\/constructioncode.blogspot.co.uk\/2013\/01\/bim-objects-from-manufacturers.html\u232a (Jan. 24 2013)."},{"key":"e_1_3_3_14_1","doi-asserted-by":"publisher","DOI":"10.1002\/1097-4571(2000)9999:9999<::AID-ASI1607>3.0.CO;2-F"},{"key":"e_1_3_3_15_1","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-642-24508-4"},{"key":"e_1_3_3_16_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(1997)123:2(121)"},{"key":"e_1_3_3_17_1","unstructured":"Khemlani L. (2007). \u201cTop criteria for BIM solutions: AECbytes survey results (online press).\u201d \u2329http:\/\/www.aecbytes.com\/feature\/2007\/BIMSurveyReport.html\u232a (Feb. 20 2013)."},{"issue":"6","key":"e_1_3_3_18_1","first-page":"113","article-title":"Development of the safety information management system according to the risk index for the building construction work","volume":"21","author":"Ko S.","year":"2005","journal-title":"J. Archit. Inst. Korea"},{"key":"e_1_3_3_19_1","doi-asserted-by":"publisher","DOI":"10.1007\/BF00155578"},{"key":"e_1_3_3_20_1","unstructured":"Korea Occupational Safety and Health Agency. (1999). \u201cResearch report: A study on the danger index of the construction works (S-RD-I-2000-20-40).\u201d Incheon Korea."},{"key":"e_1_3_3_21_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CP.1943-5487.0000146"},{"key":"e_1_3_3_22_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CP.1943-5487.0000144"},{"key":"e_1_3_3_23_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2003)129:4(431)"},{"key":"e_1_3_3_24_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0887-3801(2009)23:4(201)"},{"key":"e_1_3_3_25_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ssci.2010.02.004"},{"key":"e_1_3_3_26_1","doi-asserted-by":"publisher","DOI":"10.1017\/CBO9780511809071"},{"key":"e_1_3_3_27_1","doi-asserted-by":"publisher","DOI":"10.1108\/13673270010350020"},{"issue":"8","key":"e_1_3_3_28_1","first-page":"429","article-title":"A study on the implementation of the accident information management system in constructions","volume":"13","author":"Moon M.","year":"1997","journal-title":"AIK"},{"key":"e_1_3_3_29_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2006)132:7(733)"},{"key":"e_1_3_3_30_1","doi-asserted-by":"publisher","DOI":"10.1007\/BF00849196"},{"key":"e_1_3_3_31_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(1995)121:2(197)"},{"key":"e_1_3_3_32_1","volume-title":"The analytic hierarchy process","author":"Satty T. L.","year":"1980"},{"key":"e_1_3_3_33_1","unstructured":"Ye T. (1998). \u201cReasoning model of the case-based construction safety management system.\u201d Master dissertation Seoul National Univ. Seoul Korea."},{"key":"e_1_3_3_34_1","volume-title":"Boolean models and methods in mathematics, computer science, and engineering","author":"Yves C.","year":"2010"},{"key":"e_1_3_3_35_1","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-642-02298-2_32"},{"key":"e_1_3_3_36_1","doi-asserted-by":"publisher","DOI":"10.1145\/234889.234891"}],"container-title":["Journal of Computing in Civil Engineering"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/ascelibrary.org\/doi\/pdf\/10.1061\/%28ASCE%29CP.1943-5487.0000340","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,6,9]],"date-time":"2022-06-09T21:45:38Z","timestamp":1654811138000},"score":1,"resource":{"primary":{"URL":"https:\/\/ascelibrary.org\/doi\/10.1061\/%28ASCE%29CP.1943-5487.0000340"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2015,5]]},"references-count":35,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2015,5]]}},"alternative-id":["10.1061\/(ASCE)CP.1943-5487.0000340"],"URL":"https:\/\/doi.org\/10.1061\/(asce)cp.1943-5487.0000340","relation":{},"ISSN":["0887-3801","1943-5487"],"issn-type":[{"value":"0887-3801","type":"print"},{"value":"1943-5487","type":"electronic"}],"subject":[],"published":{"date-parts":[[2015,5]]},"assertion":[{"value":"2012-12-27","order":0,"name":"received","label":"Received","group":{"name":"publication_history","label":"Publication History"}},{"value":"2013-06-24","order":1,"name":"accepted","label":"Accepted","group":{"name":"publication_history","label":"Publication History"}},{"value":"2013-07-01","order":2,"name":"published","label":"Published","group":{"name":"publication_history","label":"Publication History"}}],"article-number":"04014052"}}