{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,30]],"date-time":"2026-03-30T18:19:57Z","timestamp":1774894797383,"version":"3.50.1"},"reference-count":37,"publisher":"American Society of Civil Engineers (ASCE)","issue":"6","content-domain":{"domain":["ascelibrary.org"],"crossmark-restriction":true},"short-container-title":["J. Comput. Civ. Eng."],"published-print":{"date-parts":[[2015,11]]},"DOI":"10.1061\/(asce)cp.1943-5487.0000441","type":"journal-article","created":{"date-parts":[[2014,9,25]],"date-time":"2014-09-25T15:00:41Z","timestamp":1411657241000},"update-policy":"https:\/\/doi.org\/10.1061\/do.news.20190416.0001","source":"Crossref","is-referenced-by-count":19,"title":["Schedule Risk Analysis for TBM Tunneling Based on Adaptive CYCLONE Simulation in a Geologic Uncertainty\u2013Aware Context"],"prefix":"10.1061","volume":"29","author":[{"given":"Donghai","family":"Liu","sequence":"first","affiliation":[{"name":"Professor, State Key Laboratory of Hydraulic Engineering Simulation and Safety, Tianjin Univ., 92 Weijin Rd., Nankai District, Tianjin 300072, China (corresponding author)."}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Peng","family":"Xuan","sequence":"additional","affiliation":[{"name":"Graduate Student, State Key Laboratory of Hydraulic Engineering Simulation and Safety, Tianjin Univ., 92 Weijin Rd., Nankai District, Tianjin 300072, China."}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Shuai","family":"Li","sequence":"additional","affiliation":[{"name":"Ph.D. Student, Lyles School of Civil Engineering, Purdue Univ., 550 Stadium Mall Dr., West Lafayette, IN 47907."}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Peizhi","family":"Huang","sequence":"additional","affiliation":[{"name":"Engineer, Shenzhen Water Planning and Design Institute, Shenzhen 518000, China."}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"30","reference":[{"key":"e_1_3_2_2_1","doi-asserted-by":"crossref","unstructured":"AbouRizk S. and Hague S. (2009). \u201cAn overview of the COSYE environment for construction simulation.\u201d Proc. 2009 Winter IEEE New York 2624\u20132634.","DOI":"10.1109\/WSC.2009.5429307"},{"key":"e_1_3_2_3_1","doi-asserted-by":"crossref","unstructured":"AbouRizk S. and Mohamed Y. (2000). \u201cSimphony\u2014An integrated environment for construction simulation.\u201d WSC \u201800 Proc. 32nd Conf. on Winter Simulation Society for Computer Simulation International San Diego 1907\u20131914.","DOI":"10.1109\/WSC.2000.899185"},{"key":"e_1_3_2_4_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.aei.2012.04.004"},{"key":"e_1_3_2_5_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CO.1943-7862.0000775"},{"key":"e_1_3_2_6_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CO.1943-7862.0000626"},{"key":"e_1_3_2_7_1","doi-asserted-by":"publisher","DOI":"10.1111\/j.1467-8667.2010.00650.x"},{"key":"e_1_3_2_8_1","volume-title":"Critical path methods in construction practice","author":"Antill J. M.","year":"1985"},{"key":"e_1_3_2_9_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2006)132:8(882)"},{"key":"e_1_3_2_10_1","doi-asserted-by":"crossref","unstructured":"Einstein H. H. Indermitte C. Sinfield J. Descoeudres F. P. and Dudt J. P. (1999). \u201cDecision aids for tunneling.\u201d Transportation Research Record 1656 Transportation Research Board 6\u201313.","DOI":"10.3141\/1656-02"},{"key":"e_1_3_2_11_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.tust.2008.12.006"},{"key":"e_1_3_2_12_1","doi-asserted-by":"publisher","DOI":"10.1080\/0144164032000080494"},{"key":"e_1_3_2_13_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.tust.2006.07.004"},{"key":"e_1_3_2_14_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2002)128:1(40)"},{"key":"e_1_3_2_15_1","unstructured":"Halpin D. W. (1973). \u201cAn investigation of the use simulation network for modeling construction operations.\u201d Ph.D. dissertation Univ. of Illinois Urbana\u2013Champaign IL."},{"issue":"3","key":"e_1_3_2_16_1","first-page":"497","article-title":"Simulation and real-time control of whole construction progress of long-distance diversion tunnels under unfavorable geological conditions","volume":"34","author":"Hu L. X.","year":"2012","journal-title":"Chin. J. Geotech. Eng."},{"key":"e_1_3_2_17_1","doi-asserted-by":"publisher","DOI":"10.1111\/j.1467-8667.1994.tb00371.x"},{"key":"e_1_3_2_18_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(1987)113:4(569)"},{"key":"e_1_3_2_19_1","volume-title":"UM-CYCLONE user\u2019s guide","author":"Ioannou P. G.","year":"1989"},{"key":"e_1_3_2_20_1","doi-asserted-by":"publisher","DOI":"10.1080\/02329290290028507"},{"key":"e_1_3_2_21_1","doi-asserted-by":"publisher","DOI":"10.1007\/s12209-010-0035-0"},{"key":"e_1_3_2_22_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2000)126:3(219)"},{"key":"e_1_3_2_23_1","unstructured":"Martinez J. C. and Ioannou P. G. (1997). \u201cState-based probabilistic scheduling using Stroboscope\u2019s CPM add-on.\u201d Proc. Construction Congress V Stuart D. Anderson ed. ASCE Minneapolis MN 438\u2013445."},{"key":"e_1_3_2_24_1","doi-asserted-by":"publisher","DOI":"10.1007\/BF02838325"},{"key":"e_1_3_2_25_1","volume-title":"GB 50487-2008: Code for engineering geological investigation of water resources and hydropower","author":"Ministry of Housing and Urban-Rural Development of the People\u2019s Republic of China (MHURD)","year":"2008"},{"key":"e_1_3_2_26_1","unstructured":"Odeh A. M. (1992). \u201cCIPROS: Knowledge-based construction intergrated project and process planning simulation system.\u201d Ph.D. dissertation Univ. of Michigan Ann Arbor MI."},{"key":"e_1_3_2_27_1","doi-asserted-by":"publisher","DOI":"10.1111\/j.1467-8667.1989.tb00022.x"},{"key":"e_1_3_2_28_1","doi-asserted-by":"publisher","DOI":"10.1139\/l00-101"},{"key":"e_1_3_2_29_1","doi-asserted-by":"crossref","unstructured":"Sargent R. G. (2005). \u201cVerification and validation of simulation models.\u201d WSC \u201805 Proc. 37th Conf. on Winter Simulation Winter Simulation Conf. 130\u2013143.","DOI":"10.1109\/WSC.2005.1574246"},{"key":"e_1_3_2_30_1","doi-asserted-by":"publisher","DOI":"10.1139\/l97-047"},{"key":"e_1_3_2_31_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2012.05.007"},{"key":"e_1_3_2_32_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.tust.2011.07.003"},{"key":"e_1_3_2_33_1","doi-asserted-by":"publisher","DOI":"10.1111\/j.1467-8667.2012.00759.x"},{"key":"e_1_3_2_34_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(1987)113:4(554)"},{"key":"e_1_3_2_35_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.tust.2013.10.011"},{"key":"e_1_3_2_36_1","volume-title":"Tunnel boring machine construction technology and practices","author":"Wang M. S.","year":"2004"},{"key":"e_1_3_2_37_1","doi-asserted-by":"publisher","DOI":"10.1111\/j.1467-8667.2007.00497.x"},{"key":"e_1_3_2_38_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CO.1943-7862.0000764"}],"container-title":["Journal of Computing in Civil Engineering"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/ascelibrary.org\/doi\/pdf\/10.1061\/%28ASCE%29CP.1943-5487.0000441","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,6,10]],"date-time":"2022-06-10T01:20:39Z","timestamp":1654824039000},"score":1,"resource":{"primary":{"URL":"https:\/\/ascelibrary.org\/doi\/10.1061\/%28ASCE%29CP.1943-5487.0000441"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2015,11]]},"references-count":37,"journal-issue":{"issue":"6","published-print":{"date-parts":[[2015,11]]}},"alternative-id":["10.1061\/(ASCE)CP.1943-5487.0000441"],"URL":"https:\/\/doi.org\/10.1061\/(asce)cp.1943-5487.0000441","relation":{},"ISSN":["0887-3801","1943-5487"],"issn-type":[{"value":"0887-3801","type":"print"},{"value":"1943-5487","type":"electronic"}],"subject":[],"published":{"date-parts":[[2015,11]]},"assertion":[{"value":"2014-04-04","order":0,"name":"received","label":"Received","group":{"name":"publication_history","label":"Publication History"}},{"value":"2014-08-26","order":1,"name":"accepted","label":"Accepted","group":{"name":"publication_history","label":"Publication History"}},{"value":"2014-09-25","order":2,"name":"published","label":"Published","group":{"name":"publication_history","label":"Publication History"}}],"article-number":"04014103"}}