{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,26]],"date-time":"2026-03-26T15:34:46Z","timestamp":1774539286354,"version":"3.50.1"},"reference-count":47,"publisher":"American Society of Civil Engineers (ASCE)","issue":"3","content-domain":{"domain":["ascelibrary.org"],"crossmark-restriction":true},"short-container-title":["J. Comput. Civ. Eng."],"published-print":{"date-parts":[[2016,5]]},"DOI":"10.1061\/(asce)cp.1943-5487.0000523","type":"journal-article","created":{"date-parts":[[2015,8,28]],"date-time":"2015-08-28T15:02:40Z","timestamp":1440774160000},"update-policy":"https:\/\/doi.org\/10.1061\/do.news.20190416.0001","source":"Crossref","is-referenced-by-count":14,"title":["Construction Simulation for a Core Rockfill Dam Based on Optimal Construction Stages and Zones: Case Study"],"prefix":"10.1061","volume":"30","author":[{"given":"Rongxiang","family":"Du","sequence":"first","affiliation":[{"name":"Ph.D. Student, State Key Laboratory of Hydraulic Engineering Simulation and Safety, Tianjin Univ., 92 Weijin Rd., Nankai District, Tianjin 300072, China."}]},{"given":"Denghua","family":"Zhong","sequence":"additional","affiliation":[{"name":"Professor, State Key Laboratory of Hydraulic Engineering Simulation and Safety, Tianjin Univ., 92 Weijin Rd., Nankai District, Tianjin 300072, China (corresponding author)."}]},{"given":"Jia","family":"Yu","sequence":"additional","affiliation":[{"name":"Ph.D. Student, State Key Laboratory of Hydraulic Engineering Simulation and Safety, Tianjin Univ., 92 Weijin Rd., Nankai District, Tianjin 300072, China."}]},{"given":"Dawei","family":"Tong","sequence":"additional","affiliation":[{"name":"Lecturer, State Key Laboratory of Hydraulic Engineering Simulation and Safety, Tianjin Univ., 92 Weijin Rd., Nankai District, Tianjin 300072, China."}]},{"given":"Binping","family":"Wu","sequence":"additional","affiliation":[{"name":"Lecturer, State Key Laboratory of Hydraulic Engineering Simulation and Safety, Tianjin Univ., 92 Weijin Rd., Nankai District, Tianjin 300072, China."}]}],"member":"30","reference":[{"key":"e_1_3_2_2_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CO.1943-7862.0000775"},{"key":"e_1_3_2_3_1","doi-asserted-by":"crossref","unstructured":"Akhavian R. and Benzadan A. H. (2014). \u201cClient-server interaction knowledge discovery for operations-level construction simulation using process data.\u201d Construction Research Congress ASCE Reston VA 41\u201350.","DOI":"10.1061\/9780784413517.005"},{"key":"e_1_3_2_4_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2005.07.007"},{"key":"e_1_3_2_5_1","volume-title":"An introduction to management science","author":"Anderson D. R.","year":"1997"},{"issue":"1","key":"e_1_3_2_6_1","first-page":"29","article-title":"Schedule simulation coupled with dynamic combination of working units for roller compacted concrete dam construction processes","volume":"46","author":"Chang H.","year":"2013","journal-title":"J. Tianjin Univ."},{"key":"e_1_3_2_7_1","doi-asserted-by":"publisher","DOI":"10.1016\/S0926-5805(02)00086-9"},{"key":"e_1_3_2_8_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2006)132:8(882)"},{"key":"e_1_3_2_9_1","volume-title":"Construction handbook for water resources and hydroelectric project","author":"Editorial Board","year":"2002"},{"key":"e_1_3_2_10_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0887-3801(2000)14:3(160)"},{"issue":"3","key":"e_1_3_2_11_1","doi-asserted-by":"crossref","first-page":"489","DOI":"10.1061\/JCCEAZ.0000712","article-title":"CYCLONE\u2014A method for modeling job site process","volume":"103","author":"Halpin D. W.","year":"1977","journal-title":"J. Constr. Div."},{"key":"e_1_3_2_12_1","doi-asserted-by":"crossref","unstructured":"Hammad A. and Zhang C. (2011). \u201cTowards real-time simulation of construction activities considering spatio-temporal resolution requirements for improving safety and productivity.\u201d Proc. 2011 Winter Simulation Conf. IEEE New York 3533\u20133544.","DOI":"10.1109\/WSC.2011.6148048"},{"key":"e_1_3_2_13_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2011.06.007"},{"key":"e_1_3_2_14_1","volume-title":"Adaptation in natural and artificial system","author":"Holland J.","year":"1975"},{"key":"e_1_3_2_15_1","unstructured":"Hu C. S. (2002). \u201cStudy on construction system simulation and optimization for high rockfill dams.\u201d Master degree dissertation Univ. of Tianjin Tianjin China."},{"key":"e_1_3_2_16_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CO.1943-7862.0000825"},{"key":"e_1_3_2_17_1","doi-asserted-by":"crossref","unstructured":"Huang R. Grigoriadis A. M. and Halpin D. W. (1994). \u201cSimulation of cable-stayed bridges using DISCO.\u201d Winter Simulation Conf. IEEE Piscataway NJ 1130\u20131136.","DOI":"10.1109\/WSC.1994.717499"},{"key":"e_1_3_2_18_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2006.09.007"},{"key":"e_1_3_2_19_1","volume-title":"Handbook of construction planning of hydraulic and hydraulic projects","author":"Hydraulic and Hydropower Construction Bureau","year":"1996"},{"key":"e_1_3_2_20_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0887-3801(2001)15:4(329)"},{"key":"e_1_3_2_21_1","doi-asserted-by":"crossref","unstructured":"Kandi A. and El-Rayes K. (2005). \u201cMulti-objective optimization for the construction of large-scale infrastructure systems.\u201d Construction Research Congress ASCE Reston VA 1\u201311.","DOI":"10.1061\/40754(183)99"},{"key":"e_1_3_2_22_1","doi-asserted-by":"crossref","unstructured":"Kim J. L. (2012). \u201cHybrid genetic algorithm parameter effects for optimization of construction resource allocation problem.\u201d Construction Research Congress ASCE Reston VA 1560\u20131569.","DOI":"10.1061\/9780784412329.157"},{"key":"e_1_3_2_23_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CP.1943-5487.0000061"},{"key":"e_1_3_2_24_1","doi-asserted-by":"crossref","unstructured":"Li J. Uehata T. Karuno Y. and Kise H. (2010). \u201cA GA-based heuristic algorithm for two-machine robotic flow- shop scheduling problem with make span.\u201d ICLEM 2010: Logistics for Sustained Economic Development ASCE Reston VA 2328\u20132335.","DOI":"10.1061\/41139(387)324"},{"key":"e_1_3_2_25_1","doi-asserted-by":"crossref","unstructured":"Liu C. Lu M. and Johnson S. (2013). \u201cSimulation and optimization of temporary road network in mass earthmoving projects.\u201d Proc. 2013 Winter Simulation Conf. IEEE New York 3181\u20133190.","DOI":"10.1109\/WSC.2013.6721684"},{"key":"e_1_3_2_26_1","doi-asserted-by":"crossref","unstructured":"Liu L. Y. and Ioannou P. G. (1992). \u201cGraphical object-oriented discrete-event simulation system.\u201d Proc. Winter Simulation Conf. ACM 1285\u20131291.","DOI":"10.1145\/167293.167915"},{"key":"e_1_3_2_27_1","doi-asserted-by":"publisher","DOI":"10.1007\/s12209-012-1958-4"},{"key":"e_1_3_2_28_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2003)129:5(537)"},{"key":"e_1_3_2_29_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2014.04.001"},{"key":"e_1_3_2_30_1","unstructured":"Martinez J. C. (1996). \u201cSTROBOSCOPE: State and resource based simulation of construction processes.\u201d Ph.D. dissertation Univ. of Michigan Ann Arbor MI."},{"key":"e_1_3_2_31_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CP.1943-5487.0000299"},{"key":"e_1_3_2_32_1","doi-asserted-by":"publisher","DOI":"10.1016\/S0928-4869(98)00007-X"},{"issue":"1","key":"e_1_3_2_33_1","doi-asserted-by":"crossref","first-page":"69","DOI":"10.1061\/JCCEAZ.0000758","article-title":"Interactive graphics for simulating construction operation","volume":"104","author":"Paulson B. C.","year":"1978","journal-title":"J. Constr. Div."},{"key":"e_1_3_2_34_1","volume-title":"Computer applications in construction","author":"Paulson B. C.","year":"1994"},{"key":"e_1_3_2_35_1","doi-asserted-by":"crossref","unstructured":"Salimi S. Mawlana M. and Hammad A. (2014). \u201cSimulation-based multiobjective optimization of bridge construction processes using parallel computing.\u201d Proc. 2014 Winter Simulation Conf. IEEE New York 3272\u20133283.","DOI":"10.1109\/WSC.2014.7020162"},{"key":"e_1_3_2_36_1","doi-asserted-by":"publisher","DOI":"10.1061\/9780784412343.0020"},{"key":"e_1_3_2_37_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(1999)125:5(354)"},{"key":"e_1_3_2_38_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(1997)123:1(26)"},{"key":"e_1_3_2_39_1","doi-asserted-by":"crossref","unstructured":"Song L. Cooper C. and Lee S. H. (2009). \u201cReal-time simulation for look-ahead scheduling of heavy construction projects.\u201d Construction Research Congress ASCE Reston VA 1318\u20131327.","DOI":"10.1061\/41020(339)134"},{"key":"e_1_3_2_40_1","doi-asserted-by":"crossref","unstructured":"Tavakolan M. and Ashuri B. (2012). \u201cStochastic optimization of construction projects planning with genetic algorithm.\u201d Construction Research Congress ASCE Reston VA 1590\u20131599.","DOI":"10.1061\/9780784412329.160"},{"issue":"3","key":"e_1_3_2_41_1","first-page":"220","article-title":"Modeling for computer simulation of coordinated control in rockfilling construction of high rockfill dam","volume":"42","author":"Wang R. C.","year":"2009","journal-title":"J. Tianjin Univ."},{"key":"e_1_3_2_42_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.matcom.2012.09.010"},{"key":"e_1_3_2_43_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CO.1943-7862.0000092"},{"key":"e_1_3_2_44_1","unstructured":"Zhang P. (2010). \u201cResearch on simulation and schedule control basing on real-time monitoring for high core rock-fill dam.\u201d Ph.D. dissertation Univ. of Tianjin Tianjin China."},{"key":"e_1_3_2_45_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CP.1943-5487.0000131"},{"key":"e_1_3_2_46_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2004)130:5(742)"},{"key":"e_1_3_2_47_1","first-page":"9","article-title":"Simulation technique of cyclic network","volume":"2","author":"Zhong D. H.","year":"1994","journal-title":"J. Syst. Simul."},{"key":"e_1_3_2_48_1","doi-asserted-by":"publisher","DOI":"10.1007\/s11431-007-6006-6"}],"container-title":["Journal of Computing in Civil Engineering"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/ascelibrary.org\/doi\/pdf\/10.1061\/%28ASCE%29CP.1943-5487.0000523","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,6,9]],"date-time":"2022-06-09T22:35:51Z","timestamp":1654814151000},"score":1,"resource":{"primary":{"URL":"https:\/\/ascelibrary.org\/doi\/10.1061\/%28ASCE%29CP.1943-5487.0000523"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2016,5]]},"references-count":47,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2016,5]]}},"alternative-id":["10.1061\/(ASCE)CP.1943-5487.0000523"],"URL":"https:\/\/doi.org\/10.1061\/(asce)cp.1943-5487.0000523","relation":{},"ISSN":["0887-3801","1943-5487"],"issn-type":[{"value":"0887-3801","type":"print"},{"value":"1943-5487","type":"electronic"}],"subject":[],"published":{"date-parts":[[2016,5]]},"assertion":[{"value":"2015-01-09","order":0,"name":"received","label":"Received","group":{"name":"publication_history","label":"Publication History"}},{"value":"2015-07-09","order":1,"name":"accepted","label":"Accepted","group":{"name":"publication_history","label":"Publication History"}},{"value":"2015-08-28","order":2,"name":"published","label":"Published","group":{"name":"publication_history","label":"Publication History"}}],"article-number":"05015002"}}