{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,19]],"date-time":"2025-10-19T06:04:27Z","timestamp":1760853867265,"version":"3.41.2"},"reference-count":33,"publisher":"American Society of Civil Engineers (ASCE)","issue":"5","content-domain":{"domain":["ascelibrary.org"],"crossmark-restriction":true},"short-container-title":["J. Comput. Civ. Eng."],"published-print":{"date-parts":[[2016,9]]},"DOI":"10.1061\/(asce)cp.1943-5487.0000559","type":"journal-article","created":{"date-parts":[[2016,1,14]],"date-time":"2016-01-14T21:44:53Z","timestamp":1452807893000},"update-policy":"https:\/\/doi.org\/10.1061\/do.news.20190416.0001","source":"Crossref","is-referenced-by-count":12,"title":["Railway Timetable Rescheduling Based on Priority and Train Order Entropy"],"prefix":"10.1061","volume":"30","author":[{"given":"Jianwei","family":"Huo","sequence":"first","affiliation":[{"name":"State Key Laboratory of Rail Traffic Control and Safety, Beijing Jiaotong Univ., Beijing 100044, China; Dept. of Urban Rail, Tianjin Railway Technical and Vocational College, Tianjin 300240, China."}]},{"given":"Jianjun","family":"Wu","sequence":"additional","affiliation":[{"name":"Professor, State Key Laboratory of Rail Traffic Control and Safety, Beijing Jiaotong Univ., Beijing 100044, China (corresponding author)."}]},{"given":"Liujiang","family":"Kang","sequence":"additional","affiliation":[{"name":"Ph.D. Student, School of Traffic and Transportation, Beijing Jiaotong Univ., Beijing 100044, China."}]},{"given":"Bo","family":"Wang","sequence":"additional","affiliation":[{"name":"Senior Engineer, Beijing Municipal Commission of Transport, Beijing 100073, China."}]}],"member":"30","reference":[{"key":"e_1_3_3_2_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2011.05.047"},{"key":"e_1_3_3_3_1","doi-asserted-by":"publisher","DOI":"10.1016\/S0191-2615(98)00041-1"},{"key":"e_1_3_3_4_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.cor.2010.09.001"},{"key":"e_1_3_3_5_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.cor.2011.01.013"},{"key":"e_1_3_3_6_1","doi-asserted-by":"publisher","DOI":"10.1287\/trsc.32.4.358"},{"key":"e_1_3_3_7_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.jrtpm.2012.10.001"},{"key":"e_1_3_3_8_1","first-page":"129","volume-title":"Handbooks in operation research and management science","author":"Caprara A.","year":"2007"},{"key":"e_1_3_3_9_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.jrtpm.2011.06.001"},{"key":"e_1_3_3_10_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.trb.2009.05.004"},{"key":"e_1_3_3_11_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.trc.2010.09.009"},{"key":"e_1_3_3_12_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.tre.2011.05.002"},{"key":"e_1_3_3_13_1","doi-asserted-by":"publisher","DOI":"10.1007\/s11067-008-9088-1"},{"key":"e_1_3_3_14_1","doi-asserted-by":"publisher","DOI":"10.1109\/TITS.2006.888605"},{"key":"e_1_3_3_15_1","unstructured":"Dollevoet T. Corman F. D\u2019Ariano A. and Huisman D. (2012). \u201cAn iterative optimization framework for delay management and train scheduling.\u201d Rep. No. EI2012-10 Econometric Institute Erasmus Univ. Rotterdam Netherlands."},{"key":"e_1_3_3_16_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.trc.2012.11.001"},{"key":"e_1_3_3_17_1","doi-asserted-by":"crossref","unstructured":"He Z. H. (2011). \u201cResearch on improved greedy algorithm for train rescheduling.\u201d 2011 7th Int. Conf. on Computational Intelligence and Security IEEE Washington DC.","DOI":"10.1109\/CIS.2011.265"},{"key":"e_1_3_3_18_1","doi-asserted-by":"publisher","DOI":"10.1016\/0191-2615(95)00022-4"},{"issue":"4","key":"e_1_3_3_19_1","first-page":"1","article-title":"Study on the algorithm for train operation adjustment based on the minimal train-order-entropy","volume":"26","author":"Jin F. C.","year":"2004","journal-title":"J. China Railway Soc."},{"key":"e_1_3_3_20_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.omega.2014.07.005"},{"key":"e_1_3_3_21_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)TE.1943-5436.0000461"},{"key":"e_1_3_3_22_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.trb.2011.05.001"},{"key":"e_1_3_3_23_1","doi-asserted-by":"publisher","DOI":"10.1016\/S0191-2615(99)00004-1"},{"key":"e_1_3_3_24_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.eswa.2012.05.071"},{"key":"e_1_3_3_25_1","doi-asserted-by":"publisher","DOI":"10.1287\/trsc.1100.0318"},{"issue":"20","key":"e_1_3_3_26_1","first-page":"344","article-title":"Optimal train scheduling on a single line railway","volume":"7","author":"Szpigel B.","year":"1973","journal-title":"Oper. Res."},{"key":"e_1_3_3_27_1","doi-asserted-by":"crossref","unstructured":"Tornquist J. and Persson J. A. (2005). \u201cTrain traffic deviation handling using tabu search and simulated annealing.\u201d Proc. 38th Hawaii Int. Conf. on System Sciences IEEE Washington DC.","DOI":"10.1109\/HICSS.2005.641"},{"key":"e_1_3_3_28_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.trb.2006.06.001"},{"key":"e_1_3_3_29_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.trc.2010.12.004"},{"key":"e_1_3_3_30_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.trd.2012.09.008"},{"key":"e_1_3_3_31_1","doi-asserted-by":"crossref","unstructured":"Xie M. Q. and Li X. M. (2012). \u201cRailway timetable rescheduling based on the feedback of train-set circulation.\u201d 8th Int. Conf. on Traffic and Transportation Studies Elsevier Science London.","DOI":"10.1016\/j.sbspro.2012.04.152"},{"issue":"2","key":"e_1_3_3_32_1","first-page":"147","article-title":"Model and algorithm for train operation adjustment on single track railway based on genetic algorithm","volume":"40","author":"Zhang Y. S.","year":"2005","journal-title":"J. Southwest Jiao Tong Univ."},{"issue":"6","key":"e_1_3_3_33_1","first-page":"12","article-title":"An optimal model and it\u2019s algorithm for adjusting diagram on single-track railway","volume":"17","author":"Zhao Q.","year":"1999","journal-title":"Syst. Eng."},{"key":"e_1_3_3_34_1","unstructured":"Zhao Q. (1999b). \u201cSingle-track railway train operation adjustment plan optimization model and algorithm.\u201d Beijing Jiaotong Univ. Beijing 70\u201372."}],"container-title":["Journal of Computing in Civil Engineering"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/ascelibrary.org\/doi\/pdf\/10.1061\/%28ASCE%29CP.1943-5487.0000559","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,6,10]],"date-time":"2022-06-10T00:01:51Z","timestamp":1654819311000},"score":1,"resource":{"primary":{"URL":"https:\/\/ascelibrary.org\/doi\/10.1061\/%28ASCE%29CP.1943-5487.0000559"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2016,9]]},"references-count":33,"journal-issue":{"issue":"5","published-print":{"date-parts":[[2016,9]]}},"alternative-id":["10.1061\/(ASCE)CP.1943-5487.0000559"],"URL":"https:\/\/doi.org\/10.1061\/(asce)cp.1943-5487.0000559","relation":{},"ISSN":["0887-3801","1943-5487"],"issn-type":[{"type":"print","value":"0887-3801"},{"type":"electronic","value":"1943-5487"}],"subject":[],"published":{"date-parts":[[2016,9]]},"assertion":[{"value":"2014-10-07","order":0,"name":"received","label":"Received","group":{"name":"publication_history","label":"Publication History"}},{"value":"2015-10-08","order":1,"name":"accepted","label":"Accepted","group":{"name":"publication_history","label":"Publication History"}},{"value":"2016-01-14","order":2,"name":"published","label":"Published","group":{"name":"publication_history","label":"Publication History"}}],"article-number":"04016006"}}