{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,26]],"date-time":"2025-10-26T14:44:41Z","timestamp":1761489881957,"version":"3.41.2"},"reference-count":47,"publisher":"American Society of Civil Engineers (ASCE)","issue":"6","content-domain":{"domain":["ascelibrary.org"],"crossmark-restriction":true},"short-container-title":["J. Comput. Civ. Eng."],"published-print":{"date-parts":[[2016,11]]},"DOI":"10.1061\/(asce)cp.1943-5487.0000567","type":"journal-article","created":{"date-parts":[[2016,2,8]],"date-time":"2016-02-08T17:06:01Z","timestamp":1454951161000},"update-policy":"https:\/\/doi.org\/10.1061\/do.news.20190416.0001","source":"Crossref","is-referenced-by-count":6,"title":["Modeling, Animating, and Optimizing On-Shore Wind Farm Construction Operations"],"prefix":"10.1061","volume":"30","author":[{"given":"Emile","family":"Zankoul","sequence":"first","affiliation":[{"name":"Graduate Student, Dept. of Civil and Environmental Engineering, American Univ. of Beirut, P.O. Box 11-0236, Riad El Solh, Beirut 1107 2020, Lebanon."}]},{"given":"Hiam","family":"Khoury","sequence":"additional","affiliation":[{"name":"Assistant Professor, Dept. of Civil and Environmental Engineering, American Univ. of Beirut, P.O. Box 11-0236, Riad El Solh, Beirut 1107 2020, Lebanon (corresponding author)."}]}],"member":"30","reference":[{"key":"e_1_3_2_2_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CO.1943-7862.0000220"},{"key":"e_1_3_2_3_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CO.1943-7862.0000288"},{"key":"e_1_3_2_4_1","doi-asserted-by":"crossref","unstructured":"Alzraiee H. Moselhi O. and Zayed T. (2012). \u201cA hybrid framework for modeling construction operations using discrete event simulation and system dynamics.\u201d Construction Research Congress ASCE Reston VA 1063\u20131073.","DOI":"10.1061\/9780784412329.107"},{"key":"e_1_3_2_5_1","unstructured":"AnyLogic [Computer software]. AnyLogic Chicago."},{"key":"e_1_3_2_6_1","doi-asserted-by":"crossref","unstructured":"Atef D. Osman H. Ibrahim M. and Nassar K. (2010). \u201cA simulation-based planning system for wind turbine construction.\u201d Proc. Winter Simulation Conf. IEEE Piscataway NJ 3283\u20133294.","DOI":"10.1109\/WSC.2010.5679020"},{"key":"e_1_3_2_7_1","doi-asserted-by":"publisher","DOI":"10.1002\/fld.2454"},{"key":"e_1_3_2_8_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0887-3801(2009)23:6(405)"},{"key":"e_1_3_2_9_1","doi-asserted-by":"publisher","DOI":"10.1145\/937503.937505"},{"key":"e_1_3_2_10_1","unstructured":"Bolinger M. and Wiser R. (2010). Surpassing expectations: State of the U.S. wind power \u27e8http:\/\/www.renewableenergyworld.com\/\u27e9 (Nov. 17 2014)."},{"key":"e_1_3_2_11_1","unstructured":"Byon E. (2010). \u201cSimulation and optimization of wind farm operations under stochastic conditions.\u201d Ph.D. thesis Texas A&M Univ. TX."},{"key":"e_1_3_2_12_1","unstructured":"Carns D. (2009). A case for wind farm construction \u27e8http:\/\/windsystemsmag.com\/article\/detail\/33\/a-case-for-wind-farm-construction\u27e9 (Jul. 12 2014)."},{"key":"e_1_3_2_13_1","doi-asserted-by":"publisher","DOI":"10.1063\/1.4800194"},{"key":"e_1_3_2_14_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.enconman.2013.02.007"},{"key":"e_1_3_2_15_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.renene.2011.06.033"},{"key":"e_1_3_2_16_1","unstructured":"El Tawafsheh A. (2012). Renewable energy in Jordan \u27e8http:\/\/www.cimap.vt.edu\/\u27e9 (Nov. 17 2014)."},{"key":"e_1_3_2_17_1","unstructured":"ENERCON. (2014). E82 system enhancement \u27e8http:\/\/www.enercon.de\/en-en\/63.htm\u27e9 (Jul. 10 2014)."},{"key":"e_1_3_2_18_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.renene.2013.02.019"},{"key":"e_1_3_2_19_1","doi-asserted-by":"publisher","DOI":"10.1201\/9781482267594"},{"key":"e_1_3_2_20_1","unstructured":"Global Wind Energy Council. (2006). Global wind energy council (GWEC) report Brussels Belgium."},{"key":"e_1_3_2_21_1","unstructured":"Gonyeau J. (2011). \u201cWind farm values and impacts in Klickitat County.\u201d \u27e8http:\/\/klickitat.org\/renewables\/KlickitatCountyWind.pdf\u27e9 (Dec. 13 2014)."},{"key":"e_1_3_2_22_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.renene.2010.01.010"},{"key":"e_1_3_2_23_1","unstructured":"Green Line Association. (2007). Status and potentials of renewable energy technologies in Lebanon and the region (Egypt Jordan Palestine Syria) Lebanon."},{"key":"e_1_3_2_24_1","doi-asserted-by":"crossref","unstructured":"Hajjar D. and AbouRizk S. (1999). \u201cSimphony: An environment for building special purpose construction simulation tools.\u201d Proc. 31st Conf. on Winter Simulation: Simulation\u2014A bridge to the future 998\u20131006.","DOI":"10.1145\/324898.324981"},{"issue":"3","key":"e_1_3_2_25_1","doi-asserted-by":"crossref","first-page":"489","DOI":"10.1061\/JCCEAZ.0000712","article-title":"CYCLONE\u2014Method for modeling job site processes","volume":"103","author":"Halpin D. W.","year":"1977","journal-title":"J. Constr. Div."},{"volume-title":"The national wind atlas of Lebanon","year":"2011","author":"Hassan G.","key":"e_1_3_2_26_1"},{"key":"e_1_3_2_27_1","doi-asserted-by":"crossref","unstructured":"Ioannou P. G. and Kamat V. R. (2005). \u201cIntelligent preemption in construction of a manmade island for an airport.\u201d Proc. 2005 Winter Simulation Conf. IEEE Piscataway NJ 1515\u20131523.","DOI":"10.1109\/WSC.2005.1574419"},{"key":"e_1_3_2_28_1","doi-asserted-by":"publisher","DOI":"10.1080\/02329290290028507"},{"volume-title":"Renewable energy country profile for Lebanon","year":"2009","author":"Karaki S.","key":"e_1_3_2_29_1"},{"key":"e_1_3_2_30_1","doi-asserted-by":"publisher","DOI":"10.1177\/0037549707086038"},{"key":"e_1_3_2_31_1","unstructured":"Laing O\u2019Rourke Plc. (2007). The safe operation of cranes Cambridgeshire U.K."},{"key":"e_1_3_2_32_1","unstructured":"Langreder W. (2002). Siting of wind farms: Basic aspects \u27e8http:\/\/www.wwindea.org\/technology\/ch02\/en\/2_4_1.html\u27e9 (Nov. 15 2014)."},{"key":"e_1_3_2_33_1","doi-asserted-by":"crossref","unstructured":"Martinez J. I. (1994). \u201cGeneral purpose simulation with stroboscope.\u201d Winter Simulation Conf. IEEE Piscataway NJ 1159\u20131166.","DOI":"10.1109\/WSC.1994.717503"},{"key":"e_1_3_2_34_1","unstructured":"M. K. Ince and Associates. (2011). Big thunder wind park Kelowna BC Canada."},{"key":"e_1_3_2_35_1","doi-asserted-by":"publisher","DOI":"10.5772\/7362"},{"key":"e_1_3_2_36_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.egypro.2012.05.074"},{"key":"e_1_3_2_37_1","doi-asserted-by":"crossref","unstructured":"Nassar K. El Masry M. and Osman H. (2010). \u201cSimulating the effect of access road route selection on wind farm construction.\u201d Proc. 2010 Winter Simulation Conf. IEEE Piscataway NJ.","DOI":"10.1109\/WSC.2010.5679019"},{"key":"e_1_3_2_38_1","doi-asserted-by":"publisher","DOI":"10.1016\/S0045-7949(99)00079-6"},{"key":"e_1_3_2_39_1","doi-asserted-by":"crossref","unstructured":"Oerlemans S. Fisher M. Maeder T. and K\u00f6gler K. (2009). Reduction of wind turbine noise using optimized airfoils and trailing-edge serrations National Aerospace Laboratory NLR Amsterdam Netherlands.","DOI":"10.2514\/6.2008-2819"},{"key":"e_1_3_2_40_1","unstructured":"OptQuest [Computer software]. OptTek Systems Boulder CO."},{"key":"e_1_3_2_41_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CO.1943-7862.0000270"},{"key":"e_1_3_2_42_1","unstructured":"RS Means. (2014). RS means building construction cost data Rockland MA."},{"key":"e_1_3_2_43_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.simpat.2013.11.001"},{"key":"e_1_3_2_44_1","doi-asserted-by":"publisher","DOI":"10.1057\/jos.2012.20"},{"key":"e_1_3_2_45_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.renene.2010.10.028"},{"key":"e_1_3_2_46_1","unstructured":"WE Energies. (2014). Developing and constructing wind energy \u27e8https:\/\/www.we-energies.com\/environmental\/windenergy.pdf\u27e9 (Oct. 15 2014)."},{"key":"e_1_3_2_47_1","doi-asserted-by":"crossref","unstructured":"Xudong W. Shen W. Z. Zhu W. J. S\u00f8rensen J. N. and Jin C. (2009). \u201cBlade optimization for wind turbines.\u201d Proc. EWEC 2009 European Wind Energy Association (EWEA) Brussels Belgium.","DOI":"10.1002\/we.335"},{"key":"e_1_3_2_48_1","doi-asserted-by":"publisher","DOI":"10.1007\/s13675-014-0024-5"}],"container-title":["Journal of Computing in Civil Engineering"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/ascelibrary.org\/doi\/pdf\/10.1061\/%28ASCE%29CP.1943-5487.0000567","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,6,9]],"date-time":"2022-06-09T22:11:53Z","timestamp":1654812713000},"score":1,"resource":{"primary":{"URL":"https:\/\/ascelibrary.org\/doi\/10.1061\/%28ASCE%29CP.1943-5487.0000567"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2016,11]]},"references-count":47,"journal-issue":{"issue":"6","published-print":{"date-parts":[[2016,11]]}},"alternative-id":["10.1061\/(ASCE)CP.1943-5487.0000567"],"URL":"https:\/\/doi.org\/10.1061\/(asce)cp.1943-5487.0000567","relation":{},"ISSN":["0887-3801","1943-5487"],"issn-type":[{"type":"print","value":"0887-3801"},{"type":"electronic","value":"1943-5487"}],"subject":[],"published":{"date-parts":[[2016,11]]},"assertion":[{"value":"2015-03-19","order":0,"name":"received","label":"Received","group":{"name":"publication_history","label":"Publication History"}},{"value":"2015-10-26","order":1,"name":"accepted","label":"Accepted","group":{"name":"publication_history","label":"Publication History"}},{"value":"2016-02-08","order":2,"name":"published","label":"Published","group":{"name":"publication_history","label":"Publication History"}}],"article-number":"05016001"}}