{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,1]],"date-time":"2026-04-01T19:02:48Z","timestamp":1775070168905,"version":"3.50.1"},"reference-count":70,"publisher":"American Society of Civil Engineers (ASCE)","issue":"6","content-domain":{"domain":["ascelibrary.org"],"crossmark-restriction":true},"short-container-title":["J. Comput. Civ. Eng."],"published-print":{"date-parts":[[2016,11]]},"DOI":"10.1061\/(asce)cp.1943-5487.0000604","type":"journal-article","created":{"date-parts":[[2016,6,3]],"date-time":"2016-06-03T15:05:43Z","timestamp":1464966343000},"update-policy":"https:\/\/doi.org\/10.1061\/do.news.20190416.0001","source":"Crossref","is-referenced-by-count":121,"title":["Visualization, Information Modeling, and Simulation: Grand Challenges in the Construction Industry"],"prefix":"10.1061","volume":"30","author":[{"given":"Fernanda","family":"Leite","sequence":"first","affiliation":[{"name":"Associate Professor, Construction Engineering and Project Management Program, Dept. of Civil, Architectural and Environmental Engineering, Univ. of Texas at Austin, 301\u00a0E. Dean Keeton St. Stop C1752, Austin, TX 78712-1094."}]},{"given":"Yong","family":"Cho","sequence":"additional","affiliation":[{"name":"Associate Professor, School of Civil and Environmental Engineering, Georgia Institute of Technology, 790 Atlanta Dr. NW, Atlanta, GA 30332-0355."}]},{"given":"Amir H.","family":"Behzadan","sequence":"additional","affiliation":[{"name":"Associate Professor, Dept. of Technology and Construction Management, Missouri State Univ., 901\u00a0S. National Ave., Springfield, MO 65897."}]},{"given":"SangHyun","family":"Lee","sequence":"additional","affiliation":[{"name":"Associate Professor, Tishman Construction Management Program, Dept. of Civil and Environmental Engineering, Univ. of Michigan, 2350 Hayward St., Suite 2340\u00a0G.G. Brown Bldg., Ann Arbor, MI 48109 (corresponding author)."}]},{"given":"Sooyoung","family":"Choe","sequence":"additional","affiliation":[{"name":"Ph.D. Candidate, Construction Engineering and Project Management Program, Dept. of Civil, Architectural and Environmental Engineering, Univ. of Texas at Austin, 301\u00a0E. Dean Keeton St. Stop C1752, Austin, TX 78712-1094."}]},{"given":"Yihai","family":"Fang","sequence":"additional","affiliation":[{"name":"Ph.D. Student, School of Civil and Environmental Engineering, Georgia Institute of Technology, 790 Atlanta Dr. NW, Atlanta, GA 30332-0355."}]},{"given":"Reza","family":"Akhavian","sequence":"additional","affiliation":[{"name":"Assistant Professor, Construction Management Program, School of Engineering, California State Univ. East Bay, Hayward, CA 94542."}]},{"given":"Sungjoo","family":"Hwang","sequence":"additional","affiliation":[{"name":"Postdoctoral Research Fellow, Tishman Construction Management Program, Dept. of Civil and Environmental Engineering, Univ. of Michigan, 2350 Hayward St., Suite 1316\u00a0G.G. Brown Bldg., Ann Arbor, MI 48109."}]}],"member":"30","reference":[{"key":"e_1_3_2_2_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CO.1943-7862.0000220"},{"key":"e_1_3_2_3_1","first-page":"04014042","article-title":"The application of low-cost accelerometers for measuring the operational efficiency of a construction equipment fleet","author":"Ahn C. R.","year":"2013","journal-title":"J. Comput. Civ. Eng."},{"key":"e_1_3_2_4_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CO.1943-7862.0000918"},{"key":"e_1_3_2_5_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CO.1943-7862.0000826"},{"key":"e_1_3_2_6_1","unstructured":"Akhavian R. and Behzadan A. H. (2011). \u201cDynamic simulation of construction activities using real time field data collection.\u201d Proc. 18th Workshop of Intelligent Computing in Engineering and Architecture European Group for Intelligent Computing in Engineering (EG-ICE) Munich Germany 6\u20138."},{"key":"e_1_3_2_7_1","doi-asserted-by":"crossref","unstructured":"Akhavian R. and Behzadan A. H. (2013a). \u201cAutomated knowledge discovery and data-driven simulation model generation of construction operations.\u201d Proc. 2013 Winter Simulation Conf. IEEE Piscataway NJ 3030\u20133041.","DOI":"10.1109\/WSC.2013.6721670"},{"key":"e_1_3_2_8_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CO.1943-7862.0000775"},{"key":"e_1_3_2_9_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2014.07.007"},{"key":"e_1_3_2_10_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.aei.2015.03.001"},{"key":"e_1_3_2_11_1","doi-asserted-by":"publisher","DOI":"10.1111\/j.1467-8667.2010.00650.x"},{"key":"e_1_3_2_12_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CP.1943-5487.0000314"},{"key":"e_1_3_2_13_1","doi-asserted-by":"publisher","DOI":"10.1002\/9780470172445"},{"key":"e_1_3_2_14_1","volume-title":"Discrete event system simulation","author":"Banks J.","year":"2005"},{"key":"e_1_3_2_15_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2012.06.003"},{"key":"e_1_3_2_16_1","doi-asserted-by":"publisher","DOI":"10.1073\/pnas.082080899"},{"key":"e_1_3_2_17_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2014.05.014"},{"key":"e_1_3_2_18_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0887-3801(2009)23:6(311)"},{"key":"e_1_3_2_19_1","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-642-02481-8_120"},{"key":"e_1_3_2_20_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.aei.2010.06.006"},{"key":"e_1_3_2_21_1","volume-title":"Applied meta-analysis for social science research","author":"Card N. A.","year":"2011"},{"key":"e_1_3_2_22_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CP.1943-5487.0000332"},{"key":"e_1_3_2_23_1","first-page":"661","article-title":"Target-focused local workspace modeling for construction automation applications","author":"Cho Y. K.","year":"2011","journal-title":"J. Comput. Civ. Eng."},{"key":"e_1_3_2_24_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CP.1943-5487.0000166"},{"key":"e_1_3_2_25_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CO.1943-7862.0000114"},{"key":"e_1_3_2_26_1","unstructured":"East W. E. (2013a). COBie common BIM models bSa project \u27e8http:\/\/buildingsmartalliance.org\/index.php\/projects\/commonbimfiles\/\u27e9 (Jan. 16 2013)."},{"key":"e_1_3_2_27_1","unstructured":"East W. E. (2013b). Construction operators information exchange (COBie) bSa project \u27e8http:\/\/www.buildingsmartalliance.org\/index.php\/projects\/activeprojects\/\u27e9 (Jan. 16 2013)."},{"key":"e_1_3_2_28_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.tust.2010.04.008"},{"key":"e_1_3_2_29_1","doi-asserted-by":"crossref","unstructured":"Gai M. Cho Y. K. and Wang C. (2012). \u201cProjection-recognition-projection (PRP) method for rapid object recognition and registration from a 3D point cloud.\u201d Proc. Computing in Civil Engineering ASCE Reston VA 325\u2013332.","DOI":"10.1061\/9780784412343.0041"},{"key":"e_1_3_2_30_1","unstructured":"Gallaher M. P. O\u2019Connor A. C. Dettbarn J. L. Jr. and Gilday L. T. (2004). \u201cCost analysis of inadequate interoperability in the US capital facilities industry.\u201d National Institute of Standards and Technology (NIST) Gaithersburg MD."},{"key":"e_1_3_2_31_1","first-page":"04013054","article-title":"Proactive productivity management at job sites: Understanding characteristics of assumptions made for construction processes during planning based on case studies and interviews","author":"Gao T.","year":"2013","journal-title":"J. Constr. Eng. Manage."},{"key":"e_1_3_2_32_1","unstructured":"gbXML (Green Building XML). (2013). About gbXML \u27e8http:\/\/www.gbxml.org\/aboutgbxml.php\u27e9 (Jan. 16 2013)."},{"key":"e_1_3_2_33_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CP.1943-5487.0000164"},{"key":"e_1_3_2_34_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0887-3801(2009)23:6(391)"},{"issue":"13","key":"e_1_3_2_35_1","first-page":"129","article-title":"D4AR\u2014A 4-dimensional augmented reality model for automation construction progress monitoring data collection, processing and communication","volume":"14","author":"Golparvar-Fard M.","year":"2009","journal-title":"J. Inform. Technol. Constr."},{"key":"e_1_3_2_36_1","doi-asserted-by":"crossref","unstructured":"Golparvar-Fard M. Tang P. Cho Y. K. and Siddiqui M. K. (2013). \u201cGrand challenges in data and information visualization for the architecture engineering construction and facility management industry.\u201d Proc. Int. Workshop on Computing in Civil Engineering ASCE Reston VA 849\u2013856.","DOI":"10.1061\/9780784413029.106"},{"key":"e_1_3_2_37_1","doi-asserted-by":"crossref","unstructured":"Hajian H. and Becerik-Gerber B. (2010). \u201cScan to BIM: Factors affecting operational and computational errors and productivity loss.\u201d Proc. 27th Int. Symp. on Automation and Robotics in Construction International Association for Automation and Robotics in Construction (ISARC) Bratislava Slovakia 265\u2013272.","DOI":"10.22260\/ISARC2010\/0028"},{"key":"e_1_3_2_38_1","doi-asserted-by":"crossref","unstructured":"Hajjar D. and AbouRizk S. M. (1999). \u201cSimphony: An environment for building special purpose construction simulation tools.\u201d Proc. 31st Conf. on Winter Simulation ACM IEEE Piscataway NJ 998\u20131006.","DOI":"10.1145\/324898.324981"},{"key":"e_1_3_2_39_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2002)128:2(174)"},{"key":"e_1_3_2_40_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CP.1943-5487.0000339"},{"key":"e_1_3_2_41_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.aap.2013.10.007"},{"key":"e_1_3_2_42_1","doi-asserted-by":"crossref","unstructured":"Huber D. (2014). ARIA: The aerial robotic infrastructure analyst \u27e8http:\/\/spie.org\/x108535.xml\u27e9 (Jul. 7 2015).","DOI":"10.1117\/2.1201405.005472"},{"key":"e_1_3_2_43_1","doi-asserted-by":"crossref","unstructured":"Ioannou P. G. and Martinez J. C. (1996). \u201cSimulation of complex construction processes.\u201d Proc. 28th Conf. on Winter Simulation IEEE Piscataway NJ 1321\u20131328.","DOI":"10.1145\/256562.256957"},{"key":"e_1_3_2_44_1","doi-asserted-by":"publisher","DOI":"10.1080\/02329290290028507"},{"key":"e_1_3_2_45_1","doi-asserted-by":"crossref","unstructured":"Kamat V. R. Menassa C. C. and Lee S. (2013). \u201cOn-line simulation of building energy processes: Need and research requirements.\u201d Proc. 2013 Winter Simulation Conf.: Simulation: Making Decisions in a Complex World IEEE Piscataway NJ 3008\u20133017.","DOI":"10.1109\/WSC.2013.6721668"},{"key":"e_1_3_2_46_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2012.11.041"},{"key":"e_1_3_2_47_1","doi-asserted-by":"crossref","unstructured":"Lee S. Behzadan A. Kandil A. and Mohamed Y. (2013). \u201cGrand challenges in simulation for the architecture engineering construction and facility management industry.\u201d Proc. Int. Workshop on Computing in Civil Engineering ASCE Reston VA 773\u2013785.","DOI":"10.1061\/9780784413029.097"},{"key":"e_1_3_2_48_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0887-3801(2009)23:2(75)"},{"key":"e_1_3_2_49_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2010.11.027"},{"key":"e_1_3_2_50_1","doi-asserted-by":"crossref","unstructured":"Leite F. Bogen C. and Gong J. (2013). \u201cGrand challenges in information modeling for the architecture engineering construction and facility management industries.\u201d Proc. Int. Workshop on Computing in Civil Engineering ASCE Reston VA 773\u2013785.","DOI":"10.1061\/9780784413029.054"},{"key":"e_1_3_2_51_1","first-page":"3","article-title":"Methodology for conducting discrete-event simulation studies in construction engineering and management","author":"Martinez J. C.","year":"2009","journal-title":"J. Constr. Eng. Manage."},{"key":"e_1_3_2_52_1","unstructured":"Mazairac W. and Beetz J. (2012). \u201cTowards a framework for a domain specific open query language for building information models.\u201d Proc. 2012 Int. Workshop on Intelligent Computing in Engineering European Group for Intelligent Computing in Engineering (EG-ICE) Munich Germany."},{"key":"e_1_3_2_53_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CP.1943-5487.0000299"},{"key":"e_1_3_2_54_1","unstructured":"Pew Research Center. (2015). U.S. smartphone use in 2015 pew research center \u27e8http:\/\/www.pewinternet.org\/2015\/04\/01\/us-smartphone-use-in-2015\/\u27e9 (Jul. 8 2015)."},{"key":"e_1_3_2_55_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.aei.2015.02.001"},{"key":"e_1_3_2_56_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CO.1943-7862.0000287"},{"key":"e_1_3_2_57_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0887-3801(2002)16:1(39)"},{"key":"e_1_3_2_58_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CP.1943-5487.0000141"},{"key":"e_1_3_2_59_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)SC.1943-5576.0000221"},{"key":"e_1_3_2_60_1","doi-asserted-by":"crossref","unstructured":"Tang P. Akinci B. and Huber D. (2010a). \u201cSemi-automated as-built modeling of light rail system guide beams.\u201d Proc. Construction Research Congress 2010 ASCE Reston VA.","DOI":"10.1061\/41109(373)13"},{"key":"e_1_3_2_61_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2010.06.007"},{"key":"e_1_3_2_62_1","doi-asserted-by":"publisher","DOI":"10.3141\/2081-06"},{"key":"e_1_3_2_63_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2011.10.003"},{"key":"e_1_3_2_64_1","unstructured":"Walsh K. D. and Sawhney A. (2004). \u201cAgent-based modeling of worker safety behavior at the construction workface.\u201d Proc. 12th Annual Conf. of the Int. Group for Lean Construction International Group for Lean Construction Berkeley CA 779\u2013792."},{"key":"e_1_3_2_65_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2014.06.003"},{"key":"e_1_3_2_66_1","first-page":"04015017","article-title":"Process knowledge capture in BIM-based mechanical, electrical, and plumbing design coordination meetings","author":"Wang L.","year":"2015","journal-title":"J. Comput. Civ. Eng."},{"key":"e_1_3_2_67_1","doi-asserted-by":"crossref","unstructured":"Wang S. Chen C. and Ma J. (2010). \u201cAccelerometer based transportation mode recognition on mobile phones.\u201d Proc. 2010 Asia-Pacific Conf. on Wearable Computing Systems (APWCS) IEEE Piscataway NJ 44\u201346.","DOI":"10.1109\/APWCS.2010.18"},{"key":"e_1_3_2_68_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2005.06.015"},{"key":"e_1_3_2_69_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2004)130:3(394)"},{"key":"e_1_3_2_70_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CP.1943-5487.0000131"},{"key":"e_1_3_2_71_1","doi-asserted-by":"crossref","unstructured":"Zhang Y. Moghani E. AbouRizk S. M. and Fernando S. (2010). \u201c3D CAD modeling and visualization of the tunnel construction process in a distributed simulation environment.\u201d Proc. 2010 Winter Simulation Conf. IEEE Piscataway NJ 3189\u20133200.","DOI":"10.1109\/WSC.2010.5679011"}],"container-title":["Journal of Computing in Civil Engineering"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/ascelibrary.org\/doi\/pdf\/10.1061\/%28ASCE%29CP.1943-5487.0000604","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,6,9]],"date-time":"2022-06-09T22:10:55Z","timestamp":1654812655000},"score":1,"resource":{"primary":{"URL":"https:\/\/ascelibrary.org\/doi\/10.1061\/%28ASCE%29CP.1943-5487.0000604"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2016,11]]},"references-count":70,"journal-issue":{"issue":"6","published-print":{"date-parts":[[2016,11]]}},"alternative-id":["10.1061\/(ASCE)CP.1943-5487.0000604"],"URL":"https:\/\/doi.org\/10.1061\/(asce)cp.1943-5487.0000604","relation":{},"ISSN":["0887-3801","1943-5487"],"issn-type":[{"value":"0887-3801","type":"print"},{"value":"1943-5487","type":"electronic"}],"subject":[],"published":{"date-parts":[[2016,11]]},"assertion":[{"value":"2015-09-18","order":0,"name":"received","label":"Received","group":{"name":"publication_history","label":"Publication History"}},{"value":"2016-03-29","order":1,"name":"accepted","label":"Accepted","group":{"name":"publication_history","label":"Publication History"}},{"value":"2016-06-03","order":2,"name":"published","label":"Published","group":{"name":"publication_history","label":"Publication History"}}],"article-number":"04016035"}}