{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,1]],"date-time":"2026-04-01T00:08:30Z","timestamp":1775002110453,"version":"3.50.1"},"reference-count":27,"publisher":"American Society of Civil Engineers (ASCE)","issue":"1","content-domain":{"domain":["ascelibrary.org"],"crossmark-restriction":true},"short-container-title":["J. Comput. Civ. Eng."],"published-print":{"date-parts":[[2017,1]]},"DOI":"10.1061\/(asce)cp.1943-5487.0000613","type":"journal-article","created":{"date-parts":[[2016,7,15]],"date-time":"2016-07-15T16:07:20Z","timestamp":1468598840000},"update-policy":"https:\/\/doi.org\/10.1061\/do.news.20190416.0001","source":"Crossref","is-referenced-by-count":21,"title":["Metanetwork Framework for Integrated Performance Assessment under Uncertainty in Construction Projects"],"prefix":"10.1061","volume":"31","author":[{"given":"Jin","family":"Zhu","sequence":"first","affiliation":[{"name":"Ph.D. Candidate, Dept. of Civil and Environmental Engineering, College of Engineering and Computing, Florida International Univ., Miami, FL 33199 (corresponding author)."}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Ali","family":"Mostafavi","sequence":"additional","affiliation":[{"name":"Assistant Professor, OHL School of Construction, College of Engineering and Computing, Florida International Univ., Miami, FL 33199."}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"30","reference":[{"key":"e_1_3_1_2_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CO.1943-7862.0000210"},{"key":"e_1_3_1_3_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CO.1943-7862.0000596"},{"key":"e_1_3_1_4_1","first-page":"133","volume-title":"Dynamic social network modeling and analysis workshop summary and papers","author":"Carley K. M.","year":"2003"},{"key":"e_1_3_1_7_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CO.1943-7862.0000857"},{"key":"e_1_3_1_9_1","doi-asserted-by":"publisher","DOI":"10.1007\/s10852-005-9006-1"},{"key":"e_1_3_1_10_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijproman.2007.07.004"},{"key":"e_1_3_1_11_1","doi-asserted-by":"publisher","DOI":"10.1080\/01441640309904"},{"key":"e_1_3_1_12_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.gloenvcha.2006.02.004"},{"key":"e_1_3_1_13_1","doi-asserted-by":"publisher","DOI":"10.1103\/PhysRevE.65.056109"},{"key":"e_1_3_1_14_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(1996)122:3(231)"},{"key":"e_1_3_1_15_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.enggeo.2004.10.011"},{"key":"e_1_3_1_16_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.enggeo.2004.10.012"},{"key":"e_1_3_1_17_1","doi-asserted-by":"publisher","DOI":"10.1016\/S0960-0779(03)00429-6"},{"key":"e_1_3_1_18_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9410(1992)118:4(558)"},{"key":"e_1_3_1_19_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CO.1943-7862.0001019"},{"key":"e_1_3_1_20_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijproman.2013.10.007"},{"key":"e_1_3_1_21_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CP.1943-5487.0000350"},{"key":"e_1_3_1_22_1","volume-title":"Simulation and the Monte Carlo method","author":"Rubenstein R. Y.","year":"2011"},{"key":"e_1_3_1_23_1","doi-asserted-by":"crossref","unstructured":"Sargent R. (2011). \u201cVerification and validation of simulation models.\u201d 2011 Winter Simulation Conf. IEEE Piscataway NJ 183\u2013198.","DOI":"10.1109\/WSC.2011.6147750"},{"key":"e_1_3_1_24_1","first-page":"04015048","article-title":"Resource supply-demand matching scheduling approach for construction workface planning","author":"Siu M. F.","year":"2015","journal-title":"J. Constr. Eng. Manage."},{"key":"e_1_3_1_25_1","doi-asserted-by":"publisher","DOI":"10.1287\/mnsc.22.3.340"},{"key":"e_1_3_1_26_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijproman.2007.02.004"},{"issue":"3","key":"e_1_3_1_27_1","first-page":"1083","article-title":"A system-of-systems framework for performance assessment in complex construction projects","volume":"6","author":"Zhu J.","year":"2014","journal-title":"Organiz. Technol. Manage. Constr."},{"key":"e_1_3_1_28_1","doi-asserted-by":"crossref","unstructured":"Zhu J. and Mostafavi A. (2014b). \u201cTowards a new paradigm for management of complex engineering projects: A system-of-systems framework.\u201d 8th Annual Systems Conf. (SysCon) IEEE Piscataway NJ 213\u2013219.","DOI":"10.1109\/SysCon.2014.6819260"},{"key":"e_1_3_1_29_1","doi-asserted-by":"crossref","unstructured":"Zhu J. and Mostafavi A. (2015a). \u201cAn integrated framework for assessment of the impacts of uncertainty in construction projects using dynamic network simulation.\u201d 2015 ASCE Int. Workshop on Computing in Civil Engineering ASCE Reston VA.","DOI":"10.1061\/9780784479247.044"},{"key":"e_1_3_1_30_1","unstructured":"Zhu J. and Mostafavi A. (2015b). \u201cEx-ante assessment of vulnerability to uncertainty in complex construction project organizations.\u201d ICSC15: The Canadian Society for Civil Engineering 5th Int.\/11th Construction Specialty Conf. Univ. of British Columbia Vancouver Canada."},{"key":"e_1_3_1_31_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijproman.2007.03.001"}],"container-title":["Journal of Computing in Civil Engineering"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/ascelibrary.org\/doi\/pdf\/10.1061\/%28ASCE%29CP.1943-5487.0000613","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,6,9]],"date-time":"2022-06-09T22:23:38Z","timestamp":1654813418000},"score":1,"resource":{"primary":{"URL":"https:\/\/ascelibrary.org\/doi\/10.1061\/%28ASCE%29CP.1943-5487.0000613"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2017,1]]},"references-count":27,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2017,1]]}},"alternative-id":["10.1061\/(ASCE)CP.1943-5487.0000613"],"URL":"https:\/\/doi.org\/10.1061\/(asce)cp.1943-5487.0000613","relation":{},"ISSN":["0887-3801","1943-5487"],"issn-type":[{"value":"0887-3801","type":"print"},{"value":"1943-5487","type":"electronic"}],"subject":[],"published":{"date-parts":[[2017,1]]},"assertion":[{"value":"2015-11-19","order":0,"name":"received","label":"Received","group":{"name":"publication_history","label":"Publication History"}},{"value":"2016-05-10","order":1,"name":"accepted","label":"Accepted","group":{"name":"publication_history","label":"Publication History"}},{"value":"2016-07-15","order":2,"name":"published","label":"Published","group":{"name":"publication_history","label":"Publication History"}}],"article-number":"04016042"}}