{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,8,12]],"date-time":"2026-08-12T16:58:35Z","timestamp":1786553915337,"version":"3.56.0"},"reference-count":77,"publisher":"American Society of Civil Engineers (ASCE)","issue":"4","content-domain":{"domain":["ascelibrary.org"],"crossmark-restriction":true},"short-container-title":["J. Comput. Civ. Eng."],"published-print":{"date-parts":[[2017,7]]},"DOI":"10.1061\/(asce)cp.1943-5487.0000660","type":"journal-article","created":{"date-parts":[[2017,2,21]],"date-time":"2017-02-21T15:56:15Z","timestamp":1487692575000},"update-policy":"https:\/\/doi.org\/10.1061\/do.news.20190416.0001","source":"Crossref","is-referenced-by-count":84,"title":["Automated Schedule and Progress Updating of IFC-Based 4D BIMs"],"prefix":"10.1061","volume":"31","author":[{"given":"Hesam","family":"Hamledari","sequence":"first","affiliation":[{"name":"Research Assistant, Dept. of Civil Engineering, Univ. of Toronto, Toronto, ON, Canada M4S 1A4 (corresponding author)."}],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Brenda","family":"McCabe","sequence":"additional","affiliation":[{"name":"Associate Professor, Dept. of Civil Engineering, Univ. of Toronto, Toronto, ON, Canada M4S 1A4."}],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Shakiba","family":"Davari","sequence":"additional","affiliation":[{"name":"Research Assistant, Dept. of Computer Science, Univ. of Toronto, Toronto, ON, Canada M5S 3G4."}],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Arash","family":"Shahi","sequence":"additional","affiliation":[{"name":"Postdoctoral Fellow, Dept. of Civil Engineering, Univ. of Toronto, Toronto, ON, Canada M4S 1A4."}],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"30","reference":[{"key":"e_1_3_2_2_1","doi-asserted-by":"crossref","unstructured":"Akcamete A. Akinci B. and Garrett J. H. (2009). \u201cMotivation for computational support for updating building information models (BIMs).\u201d Proc. 2009 ASCE Int. Workshop on Computing in Civil Engineering ASCE Reston VA 523\u2013532.","DOI":"10.1061\/41052(346)52"},{"key":"e_1_3_2_3_1","first-page":"543","volume-title":"Representation and integration of as-built information to IFC based product and process models for automated assessment of as-built conditions","author":"Akinci B.","year":"2003"},{"key":"e_1_3_2_4_1","doi-asserted-by":"crossref","unstructured":"Amor R. and Ma H. (2006). \u201cPreservation of meaning in mapped IFCs.\u201d Proc. EC-PPM Taylor & Francis Abingdon VA 233\u2013236.","DOI":"10.1201\/9781003060819-37"},{"key":"e_1_3_2_5_1","doi-asserted-by":"crossref","unstructured":"Belsky M. Sacks R. and Brilakis I. (2015). \u201cSemantic enrichment for building information modeling.\u201d Computer-Aided Civil and Infrastructure Engineering Malden MA.","DOI":"10.1111\/mice.12128"},{"key":"e_1_3_2_6_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2007.09.001"},{"key":"e_1_3_2_7_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.aei.2010.06.006"},{"key":"e_1_3_2_8_1","unstructured":"BuildingSMART. (2007). \u201cIFC2x edition 3.\u201d \u27e8http:\/\/www.buildingsmart-tech.org\/ifc\/IFC2x3\/TC1\/html\/\u27e9 (Feb. 25 2016)."},{"key":"e_1_3_2_9_1","unstructured":"BuildingSMART. (2016a). \u201cIFC GUID summary.\u201d \u27e8http:\/\/www.buildingsmart-tech.org\/implementation\/get-started\/ifc-guid\u27e9 (Feb. 25 2016)."},{"key":"e_1_3_2_10_1","unstructured":"BuildingSMART. (2016b). \u201cIFC file validators.\u201d \u27e8http:\/\/www.buildingsmart-tech.org\/implementation\/get-started\/ifc-toolboxes\/ifc-toolboxes-summary#IFC_file_validators\u27e9 (Feb. 25 2016)."},{"key":"e_1_3_2_11_1","unstructured":"BuildingSMART. (2016c). \u201cIndustry foundation classes (IFC).\u201d \u27e8http:\/\/www.buildingsmart-tech.org\/specifications\/ifc-overview\/\u27e9 (Feb. 25 2016)."},{"key":"e_1_3_2_12_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijproman.2015.03.006"},{"key":"e_1_3_2_13_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0887-3801(2008)22:2(74)"},{"key":"e_1_3_2_14_1","doi-asserted-by":"publisher","DOI":"10.1186\/s40327-015-0030-6"},{"key":"e_1_3_2_15_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.proenv.2014.11.014"},{"key":"e_1_3_2_16_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2014.04.009"},{"key":"e_1_3_2_17_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2008.05.006"},{"key":"e_1_3_2_18_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.aei.2015.01.012"},{"key":"e_1_3_2_19_1","first-page":"53","article-title":"Industry foundation classes for project management-a trial implementation","volume":"4","author":"Froese T.","year":"1999","journal-title":"Electron. J. Inf. Technol. Constr."},{"issue":"4","key":"e_1_3_2_20_1","first-page":"2825","article-title":"Industry foundation class modeling for estimating and scheduling","volume":"8","author":"Froese T.","year":"1999","journal-title":"Durability Build. Mater. Compon."},{"key":"e_1_3_2_21_1","unstructured":"Gallaher M. P. O\u2019Connor A. C. John L. Dettbarn J. and Gilday L. T. (2004). \u201cCost analysis of inadequate interoperability in the US capital facilities industry.\u201d National Institute of Standards and Technology Gaithersburg MD."},{"key":"e_1_3_2_22_1","first-page":"129","article-title":"D4AR\u2013 A 4-dimensional augmented reality model for automating construction progress monitoring data collection, processing and communication","volume":"14","author":"Golparvar M.","year":"2009","journal-title":"J. Inf. Technol. Constr."},{"key":"e_1_3_2_23_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CO.1943-7862.0000371"},{"key":"e_1_3_2_24_1","doi-asserted-by":"crossref","unstructured":"Hamledari H. and McCabe B. (2016). \u201cAutomated visual recognition of indoor project-related objects: Challenges and solutions.\u201d Proc. Construction Research Congress ASCE Reston VA 2573\u20132582.","DOI":"10.1061\/9780784479827.256"},{"key":"e_1_3_2_25_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2016.11.009"},{"key":"e_1_3_2_26_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.aei.2015.10.006"},{"key":"e_1_3_2_27_1","doi-asserted-by":"crossref","unstructured":"Han K. K. and Golparvar-Fard M. (2014). \u201cAutomated monitoring of operation-level construction progress using 4D bim and daily site photologs.\u201d Proc. Construction Research Congressm ASCE Reston VA 1033\u20131042.","DOI":"10.1061\/9780784413517.106"},{"key":"e_1_3_2_28_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2015.02.007"},{"key":"e_1_3_2_29_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2008)134:10(776)"},{"key":"e_1_3_2_30_1","unstructured":"IfcObjectCounter. (2016). \u201cIfcobjectcounter.\u201d \u27e8http:\/\/www.iai.kit.edu\/www-extern\/index.php?id=1134&L=0\u27e9 (Feb. 25 2016)."},{"key":"e_1_3_2_31_1","unstructured":"IfcOpenShell. (2015). \u201cIfcopenshell open source library.\u201d \u27e8http:\/\/ifcopenshell.org\/\u27e9 (Feb. 25 2016)."},{"key":"e_1_3_2_32_1","volume-title":"4D CAD and visualization in construction: Developments and applications","author":"Issa R.","year":"2005"},{"key":"e_1_3_2_33_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2008.11.001"},{"key":"e_1_3_2_34_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2013.03.005"},{"key":"e_1_3_2_35_1","first-page":"98","article-title":"Applicability of 4D CAD in civil engineering construction: Case study of a cable-stayed bridge project","author":"Kim C.","year":"2010","journal-title":"J. Comput. Civ Eng."},{"key":"e_1_3_2_36_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2012.11.041"},{"key":"e_1_3_2_37_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2000)126:4(251)"},{"key":"e_1_3_2_38_1","unstructured":"Kopsida M. Brilakis I. and Vela P. A. (2015). \u201cA review of automated construction progress monitoring and inspection methods.\u201d Proc. 32nd CIB W78 Conf. Endhoven Netherlands 421\u2013431."},{"key":"e_1_3_2_39_1","doi-asserted-by":"crossref","unstructured":"Kropp C. Koch C. and K\u00f6nig M. (2014). \u201cDrywall state detection in image data for automatic indoor progress monitoring.\u201d Proc. Computing in Civil and Building Engineering ASCE Reston VA 347\u2013354.","DOI":"10.1061\/9780784413616.044"},{"key":"e_1_3_2_40_1","unstructured":"Kropp C. Koch C. K\u00f6nig M. and Brilakis I. (2012). \u201cA framework for automated delay prediction of finishing works using video data and BIM-based construction simulation.\u201d Proc. 14th Int. Conf. on Computing in Civil and Building Engineering Moscow State Univ. of Civil Engineering Moscow."},{"issue":"9","key":"e_1_3_2_41_1","first-page":"134","article-title":"The IFC standard: A review of history, development, and standardization, information technology","volume":"17","author":"Laakso M.","year":"2012","journal-title":"Electron. J. Inf. Technol. Constr."},{"key":"e_1_3_2_42_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CP.1943-5487.0000077"},{"key":"e_1_3_2_43_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2015.07.010"},{"key":"e_1_3_2_44_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CP.1943-5487.0000604"},{"key":"e_1_3_2_45_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2010.11.027"},{"key":"e_1_3_2_46_1","unstructured":"Liebich T. (2013). \u201cIFC4\u2014The new buildingSMART standard.\u201d IC Meeting bSI Publications Helsinki Finland."},{"key":"e_1_3_2_47_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.aei.2012.10.001"},{"key":"e_1_3_2_48_1","article-title":"Technical review: Analysis and appraisal of four-dimensional building information modeling usability in construction and engineering projects","author":"Lopez R.","year":"2015","journal-title":"J. Constr. Eng. Manage."},{"key":"e_1_3_2_49_1","unstructured":"Meadati P. Irizarry J. and Akhnoukh A. K. (2010). \u201cBIM and RFID integration: A pilot study.\u201d 2nd Int. Conf. Construction in Developing Countries Florida International Univ. Miami 570\u2013578."},{"key":"e_1_3_2_50_1","unstructured":"Navisworks Jetstream [Computer software]. Autodesk Inc. San Rafael CA."},{"issue":"4","key":"e_1_3_2_51_1","first-page":"474","article-title":"Assessing research issues in automated project performance control (APPC)","volume":"16","author":"Navon R.","year":"2007","journal-title":"Practice"},{"key":"e_1_3_2_52_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2015.07.015"},{"key":"e_1_3_2_53_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2016.06.016"},{"key":"e_1_3_2_54_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CP.1943-5487.0000067"},{"key":"e_1_3_2_55_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.aei.2015.01.001"},{"key":"e_1_3_2_56_1","unstructured":"Pazlar T. and Turk Z. (2008). \u201cInteroperability in practice: Geometric data exchange using the IFC standard.\u201d \u27e8http:\/\/www.itcon.org\/paper\/2008\/24\u27e9 (Jan. 2017)."},{"key":"e_1_3_2_57_1","unstructured":"Python 2.7 [Computer software]. Python Software Foundation Wilmington Delaware."},{"key":"e_1_3_2_58_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CO.1943-7862.0000322"},{"key":"e_1_3_2_59_1","unstructured":"Revit [Computer software]. Autodesk Inc. San Rafael CA."},{"key":"e_1_3_2_60_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2010.07.003"},{"key":"e_1_3_2_61_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2009.11.012"},{"key":"e_1_3_2_62_1","doi-asserted-by":"publisher","DOI":"10.1061\/9780784412329.085"},{"key":"e_1_3_2_63_1","article-title":"Data fusion process management for automated construction progress estimation","author":"Shahi A.","year":"2014","journal-title":"J. Comput. Civ. Eng."},{"key":"e_1_3_2_64_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.aei.2009.09.001"},{"key":"e_1_3_2_65_1","doi-asserted-by":"crossref","unstructured":"Song K. Pollalis S. and Pe\u00f1a-Mora F. (2005). \u201cProject dashboard: Concurrent visual representation method of project metrics on 3D building models.\u201d Proc. Int. Conf. on Computing in Civil Engineering ASCE Reston VA.","DOI":"10.1061\/40794(179)147"},{"key":"e_1_3_2_66_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2014.10.015"},{"key":"e_1_3_2_67_1","unstructured":"Synchro [Computer software]. Tamagawa Seiki Shin-Kamata Tokyo."},{"key":"e_1_3_2_68_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2010.06.007"},{"key":"e_1_3_2_69_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2004.06.002"},{"key":"e_1_3_2_70_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.aei.2015.03.006"},{"key":"e_1_3_2_71_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2011.10.003"},{"key":"e_1_3_2_72_1","first-page":"423","article-title":"Toward automated earned value tracking using 3D imaging tools","author":"Turkan Y.","year":"2012","journal-title":"J. Constr. Eng. Manage."},{"key":"e_1_3_2_73_1","unstructured":"Weise M. Liebich T. Tulke J. and Bonsma P. (2009). \u201cIFC support for model-based scheduling.\u201d CiBW78 International Council for Buildings Delft Netherlands."},{"key":"e_1_3_2_74_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0887-3801(2010)24:1(56)"},{"key":"e_1_3_2_75_1","doi-asserted-by":"publisher","DOI":"10.1260\/1369-4332.17.3.303"},{"key":"e_1_3_2_76_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.aei.2015.01.011"},{"key":"e_1_3_2_77_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2008.09.004"},{"key":"e_1_3_2_78_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CP.1943-5487.0000053"}],"container-title":["Journal of Computing in Civil Engineering"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/ascelibrary.org\/doi\/pdf\/10.1061\/%28ASCE%29CP.1943-5487.0000660","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,6,10]],"date-time":"2022-06-10T00:18:55Z","timestamp":1654820335000},"score":1,"resource":{"primary":{"URL":"https:\/\/ascelibrary.org\/doi\/10.1061\/%28ASCE%29CP.1943-5487.0000660"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2017,7]]},"references-count":77,"journal-issue":{"issue":"4","published-print":{"date-parts":[[2017,7]]}},"alternative-id":["10.1061\/(ASCE)CP.1943-5487.0000660"],"URL":"https:\/\/doi.org\/10.1061\/(asce)cp.1943-5487.0000660","relation":{},"ISSN":["0887-3801","1943-5487"],"issn-type":[{"value":"0887-3801","type":"print"},{"value":"1943-5487","type":"electronic"}],"subject":[],"published":{"date-parts":[[2017,7]]},"assertion":[{"value":"2016-05-18","order":0,"name":"received","label":"Received","group":{"name":"publication_history","label":"Publication History"}},{"value":"2016-11-02","order":1,"name":"accepted","label":"Accepted","group":{"name":"publication_history","label":"Publication History"}},{"value":"2017-02-21","order":2,"name":"published","label":"Published","group":{"name":"publication_history","label":"Publication History"}}],"article-number":"04017012"}}