{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,8,26]],"date-time":"2026-08-26T07:54:51Z","timestamp":1787730891883,"version":"build-2784847793"},"reference-count":53,"publisher":"American Society of Civil Engineers (ASCE)","issue":"2","content-domain":{"domain":["ascelibrary.org"],"crossmark-restriction":true},"short-container-title":["J. Comput. Civ. Eng."],"published-print":{"date-parts":[[2019,3]]},"DOI":"10.1061\/(asce)cp.1943-5487.0000803","type":"journal-article","created":{"date-parts":[[2018,12,11]],"date-time":"2018-12-11T06:01:01Z","timestamp":1544508061000},"update-policy":"https:\/\/doi.org\/10.1061\/do.news.20190416.0001","source":"Crossref","is-referenced-by-count":33,"title":["Owner\u2019s Perspective on Evolution of Bid Prices under Various Price-Driven Bid Selection Methods"],"prefix":"10.1061","volume":"33","author":[{"given":"Rita","family":"Awwad","sequence":"first","affiliation":[{"name":"Associate Professor, Dept. of Civil Engineering, Lebanese American Univ., 211 E. 46th St., New York, NY 10017 (corresponding author)."}],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Michael","family":"Ammoury","sequence":"additional","affiliation":[{"name":"Graduate Student, Dept. of Civil Engineering, Lebanese American Univ., 211 E. 46th St., New York, NY 10017."}],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"30","reference":[{"key":"e_1_3_1_2_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)9742-597X(1988)4:3(229)"},{"issue":"1","key":"e_1_3_1_3_1","first-page":"41","article-title":"Bid average methods in procurement","volume":"96","author":"Albano G. L.","year":"2006","journal-title":"Rivista di Politica Economica"},{"key":"e_1_3_1_4_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2000)126:3(176)"},{"key":"e_1_3_1_5_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2016.01.004"},{"key":"e_1_3_1_6_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)ME.1943-5479.0000400"},{"key":"e_1_3_1_7_1","unstructured":"Awwad R. and P. Ioannou. 2012. \u201cThe second low bid method.\u201d In Proc. 29th Int. Conf. on CIB W78 516\u2013522. Beirut Lebanon: Lebanese American Univ."},{"key":"e_1_3_1_8_1","unstructured":"Awwad R. and P. G. Ioannou. 2010. \u201cNeutral and risk-sensitive models for competitive bidding methods based on average and order statistics.\u201d ProQuest dissertations Publishing Dept. of Civil and Environmental Engineering Univ. of Michigan."},{"key":"e_1_3_1_9_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CP.1943-5487.0000440"},{"key":"e_1_3_1_10_1","unstructured":"Axel C. S. and V. S. Holstein. 1971. \u201cA tutorial in decision analysis.\u201d In Proc. 3rd Research Conf. on Subjective Probability Utility and Decision Making 7\u20139. London: European Association for Decision Making."},{"key":"e_1_3_1_11_1","unstructured":"Axelrod R. 2006. \u201cAdvancing the art of simulation in the social sciences.\u201d In Vol.\u00a036 of  Proc. 18th European Meeting on Cybernetics and Systems Research. Bingley UK: Emerald Group Publishing Limited Kybernetes."},{"key":"e_1_3_1_12_1","first-page":"1647","volume-title":"Handbook of computational economics","author":"Axelrod R.","year":"2006"},{"key":"e_1_3_1_13_1","unstructured":"Bagies A. and C. Fortune. 2006. \u201cBid\/no bid decision modelling for construction projects.\u201d In Proc. 22nd Annual ARCOM Conf. edited by D. Boyd 511\u2013521. Birmingham UK: Association of Researchers in Construction Management."},{"key":"e_1_3_1_14_1","doi-asserted-by":"publisher","DOI":"10.1257\/aer.104.4.1288"},{"key":"e_1_3_1_15_1","doi-asserted-by":"crossref","unstructured":"Bankes S. C. 2002. \u201cTools and techniques for developing policies for complex and uncertain systems.\u201d In Proc. National Academy of Sciences of the United States of America 7263\u20137266. Vienna Austria: Austrian Society for Cybernetic Studies.","DOI":"10.1073\/pnas.092081399"},{"key":"e_1_3_1_16_1","doi-asserted-by":"publisher","DOI":"10.1061\/JCCEAZ.0001070"},{"key":"e_1_3_1_17_1","doi-asserted-by":"publisher","DOI":"10.1287\/mnsc.2013.1893"},{"key":"e_1_3_1_18_1","doi-asserted-by":"publisher","DOI":"10.3846\/13923730.2011.598337"},{"key":"e_1_3_1_19_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2013.06.007"},{"key":"e_1_3_1_20_1","doi-asserted-by":"publisher","DOI":"10.1108\/09699981011056600"},{"key":"e_1_3_1_21_1","volume-title":"Making hard decisions with decision tools","author":"Clemen R. T.","year":"2014","edition":"3"},{"key":"e_1_3_1_22_1","doi-asserted-by":"publisher","DOI":"10.1257\/mic.20130254"},{"key":"e_1_3_1_23_1","doi-asserted-by":"publisher","DOI":"10.1111\/iere.12274"},{"key":"e_1_3_1_24_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2007.02.009"},{"key":"e_1_3_1_25_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(1996)122:2(119)"},{"key":"e_1_3_1_26_1","unstructured":"Elhag T. M. S. and A. H. Boussabaine. 1998. \u201cAn artificial neural system for cost estimation of construction projects.\u201d In Vol. 1 of Proc. 14th Annual ARCOM Conf. edited by W. Hughes 219\u2013226. Reading UK: Univ. of Reading."},{"issue":"3","key":"e_1_3_1_27_1","first-page":"273","article-title":"A neural network model for construction projects site overhead cost estimating in Egypt","volume":"8","author":"ElSawy I.","year":"2011","journal-title":"IJCSI Int. J. Comput. Sci. Issues"},{"key":"e_1_3_1_28_1","doi-asserted-by":"publisher","DOI":"10.1017\/CBO9780511492556.014"},{"key":"e_1_3_1_30_1","doi-asserted-by":"publisher","DOI":"10.1287\/opre.4.1.104"},{"key":"e_1_3_1_31_1","doi-asserted-by":"publisher","DOI":"10.1061\/JCCEAZ.0000192"},{"key":"e_1_3_1_32_1","volume-title":"Trends in contracting practice for civil works","author":"Henriod E.","year":"2000"},{"key":"e_1_3_1_33_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2011.09.014"},{"key":"e_1_3_1_34_1","volume-title":"Risk preference: Readings in decision analysis","author":"Howard R. A.","year":"1977"},{"key":"e_1_3_1_35_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CO.1943-7862.0000202"},{"key":"e_1_3_1_36_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(1993)119:1(131)"},{"key":"e_1_3_1_37_1","doi-asserted-by":"publisher","DOI":"10.1108\/13664381311305078"},{"key":"e_1_3_1_38_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)ME.1943-5479.0000223"},{"key":"e_1_3_1_39_1","first-page":"399","article-title":"Development of a two-step neural network-based model to predict construction cost contingency","volume":"19","author":"Lhee S. C.","year":"2014","journal-title":"J. Inf. Technol. Constr. (ITcon)"},{"key":"e_1_3_1_40_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CO.1943-7862.0000408"},{"key":"e_1_3_1_41_1","doi-asserted-by":"publisher","DOI":"10.1108\/14714170310814882"},{"key":"e_1_3_1_42_1","volume-title":"2009-2010 annual report","author":"Office of the Procurement Ombudsman","year":"2010"},{"key":"e_1_3_1_43_1","doi-asserted-by":"publisher","DOI":"10.1108\/ECAM-01-2016-0029"},{"key":"e_1_3_1_44_1","unstructured":"Public Construction Commission. 1998. \u201cGovernment procurement law.\u201d Accessed August 25 2017. http:\/\/plan3.pcc.gov.tw\/gplaw\/egplaw\/."},{"issue":"7","key":"e_1_3_1_45_1","first-page":"44","article-title":"Evaluating the criteria for contractors\u2019 selection and bid evaluation","volume":"3","author":"Puri D.","year":"2014","journal-title":"Int. J. Eng. Sci. Invention"},{"key":"e_1_3_1_46_1","doi-asserted-by":"publisher","DOI":"10.1139\/l00-111"},{"key":"e_1_3_1_47_1","doi-asserted-by":"publisher","DOI":"10.1057\/jos.2012.20"},{"key":"e_1_3_1_48_1","doi-asserted-by":"publisher","DOI":"10.1108\/ECAM-06-2015-0094"},{"key":"e_1_3_1_49_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(1990)116:4(609)"},{"key":"e_1_3_1_50_1","doi-asserted-by":"publisher","DOI":"10.1016\/S0895-7177(01)00091-7"},{"key":"e_1_3_1_51_1","doi-asserted-by":"publisher","DOI":"10.1080\/01446199300000004"},{"key":"e_1_3_1_52_1","doi-asserted-by":"publisher","DOI":"10.1111\/j.1467-8667.2007.00480.x"},{"key":"e_1_3_1_53_1","doi-asserted-by":"publisher","DOI":"10.1080\/01446190050024879"},{"key":"e_1_3_1_54_1","doi-asserted-by":"publisher","DOI":"10.1080\/0144619032000093323"},{"key":"e_1_3_1_55_1","doi-asserted-by":"publisher","DOI":"10.1080\/02533839.2003.9670792"}],"container-title":["Journal of Computing in Civil Engineering"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/ascelibrary.org\/doi\/pdf\/10.1061\/%28ASCE%29CP.1943-5487.0000803","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,6,9]],"date-time":"2022-06-09T21:41:34Z","timestamp":1654810894000},"score":1,"resource":{"primary":{"URL":"https:\/\/ascelibrary.org\/doi\/10.1061\/%28ASCE%29CP.1943-5487.0000803"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2019,3]]},"references-count":53,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2019,3]]}},"alternative-id":["10.1061\/(ASCE)CP.1943-5487.0000803"],"URL":"https:\/\/doi.org\/10.1061\/(asce)cp.1943-5487.0000803","relation":{},"ISSN":["0887-3801","1943-5487"],"issn-type":[{"value":"0887-3801","type":"print"},{"value":"1943-5487","type":"electronic"}],"subject":[],"published":{"date-parts":[[2019,3]]},"assertion":[{"value":"2018-03-28","order":0,"name":"received","label":"Received","group":{"name":"publication_history","label":"Publication History"}},{"value":"2018-07-20","order":1,"name":"accepted","label":"Accepted","group":{"name":"publication_history","label":"Publication History"}},{"value":"2018-12-11","order":2,"name":"published","label":"Published","group":{"name":"publication_history","label":"Publication History"}}],"article-number":"04018061"}}