{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,6,3]],"date-time":"2026-06-03T05:05:24Z","timestamp":1780463124702,"version":"3.54.1"},"reference-count":82,"publisher":"American Society of Civil Engineers (ASCE)","issue":"2","content-domain":{"domain":["ascelibrary.org"],"crossmark-restriction":true},"short-container-title":["J. Comput. Civ. Eng."],"published-print":{"date-parts":[[2021,3]]},"DOI":"10.1061\/(asce)cp.1943-5487.0000955","type":"journal-article","created":{"date-parts":[[2020,12,18]],"date-time":"2020-12-18T16:32:28Z","timestamp":1608309148000},"update-policy":"https:\/\/doi.org\/10.1061\/do.news.20190416.0001","source":"Crossref","is-referenced-by-count":104,"title":["BIM-Based Tunnel Information Modeling Framework for Visualization, Management, and Simulation of Drill-and-Blast Tunneling Projects"],"prefix":"10.1061","volume":"35","author":[{"ORCID":"https:\/\/orcid.org\/0000-0003-3856-9799","authenticated-orcid":true,"given":"Abubakar","family":"Sharafat","sequence":"first","affiliation":[{"name":"Ph.D. Candidate, Dept. of Civil and Environmental Engineering, Hanyang Univ., Seoul 04763, Korea. ORCID:"}],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Muhammad Shoaib","family":"Khan","sequence":"additional","affiliation":[{"name":"Master\u2019s Student, Dept. of Civil and Environmental Engineering, Hanyang Univ., Seoul 04763, Korea."}],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Kamran","family":"Latif","sequence":"additional","affiliation":[{"name":"Ph.D. Student, Dept. of Civil and Environmental Engineering, Hanyang Univ., Seoul 04763, Korea."}],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Jongwon","family":"Seo","sequence":"additional","affiliation":[{"name":"Professor, Dept. of Civil and Environmental Engineering, Hanyang Univ., Seoul 04763, Korea (corresponding author)."}],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"30","reference":[{"key":"e_1_3_5_2_1","unstructured":"Amann J. et al. 2013. \u201cA refined product model for shield tunnels based on a generalized approach for alignment representation.\u201d In Proc. 1st Int.Conf. on Civil and Building Engineering Informatics 449\u2013456. Osaka Japan: ICCBEI Organizing Committee."},{"key":"e_1_3_5_3_1","unstructured":"American Institute of Architects. 2013. \u201cDigital practice documents\u2014Guide instructions and commentary.\u201d Accessed June 12 2020. https:\/\/help.aiacontracts.org\/public\/wp-content\/uploads\/2020\/03\/Digital-Practice_Guide.pdf."},{"key":"e_1_3_5_4_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)LM.1943-5630.0000127"},{"key":"e_1_3_5_5_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2012.02.008"},{"key":"e_1_3_5_6_1","doi-asserted-by":"publisher","DOI":"10.3724\/SP.J.1235.2012.00115"},{"key":"e_1_3_5_7_1","doi-asserted-by":"crossref","unstructured":"Beaufils M. S. Grellet B. Le Hello J. Lorentz M. Beaudouin and J. Castro Moreno. 2019. \u201cGeotechnical data standardization and management to support BIM for underground infrastructures and tunnels.\u201d In Proc. WTC 2019 ITA-AITES World Tunnel Congress 655\u2013664. London: CRC Press.","DOI":"10.1201\/9780429424441-69"},{"key":"e_1_3_5_8_1","doi-asserted-by":"publisher","DOI":"10.1007\/978-1-4613-0449-4"},{"key":"e_1_3_5_9_1","unstructured":"BIM Forum. 2019. \u201cLevel of development (LOD) specification Part I & commentary.\u201d Accessed June 12 2020. https:\/\/bimforum.org\/LOD\/."},{"key":"e_1_3_5_10_1","unstructured":"Borrmann A. Y. Ji J. R. Jubierre and M. Flurl. 2012. \u201cProcedural modeling: A new approach to multi-scale design in infrastructure projects.\u201d In Vol. 1 of Proc. 19th EG-ICE Int. Workshop on Intelligent Computing in Engineering 2012 (ICE12) 1\u201310. Plymouth UK: European Group for Intelligent Computing in Engineering."},{"key":"e_1_3_5_11_1","doi-asserted-by":"crossref","unstructured":"Borrmann A. T. H. Kolbe A. Donaubauer H. Steuer and J. R. Jubierre. 2013. \u201cTransferring multi-scale approaches from 3D city modeling to IFC-based tunnel modeling.\u201d In Vol. 2 of Proc. ISPRS Annals of the Photogrammetry Remote Sensing and Spatial Information Sciences 75\u201385. Hannover Germany: ISPRS. https:\/\/doi.org\/10.5194\/isprsannals-II-2-W1-75-2013.","DOI":"10.5194\/isprsannals-II-2-W1-75-2013"},{"key":"e_1_3_5_12_1","doi-asserted-by":"publisher","DOI":"10.1111\/mice.12090"},{"key":"e_1_3_5_13_1","doi-asserted-by":"crossref","unstructured":"Borrmann A. S. Muhic J. Hyv\u00e4rinen T. Chipman S. Jaud C. Castaing C. Dumoulin T. Liebich and L. Mol. 2019. \u201cThe IFC-bridge project\u2013Extending the IFC standard to enable high-quality exchange of bridge information models.\u201d In Proc. European Conf. for Computing in Construction 377\u2013386. Dublin Ireland: Univ. College Dublin. https:\/\/doi.org\/10.35490\/EC3.2019.193.","DOI":"10.35490\/EC3.2019.193"},{"key":"e_1_3_5_14_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.proeng.2015.10.058"},{"key":"e_1_3_5_15_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2016.08.019"},{"key":"e_1_3_5_16_1","doi-asserted-by":"publisher","DOI":"10.1201\/9781315210117"},{"key":"e_1_3_5_17_1","unstructured":"Building and Construction Authority. 2012. \u201cSingapore BIM guide.\u201d Accessed June 12 2020. https:\/\/corenet.gov.sg\/media\/586132\/Singapore-BIM-Guide_V2.pdf."},{"key":"e_1_3_5_18_1","unstructured":"Building Smart. 2020. \u201c5.4.3.20 IfcFacility.\u201d Accessed August 18 2020. https:\/\/standards.buildingsmart.org\/IFC\/DEV\/IFC4_3\/RC1\/HTML\/schema\/ifcproductextension\/lexical\/ifcfacility.htm."},{"key":"e_1_3_5_19_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.aei.2010.06.003"},{"key":"e_1_3_5_20_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2004)130:4(598)"},{"key":"e_1_3_5_21_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.tust.2019.103262"},{"key":"e_1_3_5_22_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2016.02.006"},{"key":"e_1_3_5_23_1","doi-asserted-by":"crossref","unstructured":"Cho D. N.-S. Cho H. Cho and K.-I. Kang. 2012. \u201cParametric modelling based approach for efficient quantity takeoff of NATM-tunnels.\u201d In Proc. 29th Int. Symp. of Automation and Robotics in Construction ISARC 2012 1\u20136. Oulu North Ostrobothnia: IAARC Publications. https:\/\/doi.org\/10.22260\/ISARC2012\/0006.","DOI":"10.22260\/ISARC2012\/0006"},{"key":"e_1_3_5_24_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2016.03.005"},{"key":"e_1_3_5_25_1","doi-asserted-by":"publisher","DOI":"10.1002\/geot.201600054"},{"key":"e_1_3_5_26_1","doi-asserted-by":"publisher","DOI":"10.1002\/9780470261309"},{"key":"e_1_3_5_27_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0887-3801(2010)24:1(25)"},{"key":"e_1_3_5_28_1","doi-asserted-by":"publisher","DOI":"10.1108\/BEPAM-11-2018-0136"},{"issue":"17","key":"e_1_3_5_29_1","first-page":"231","article-title":"Future directions for IFC-based interoperability","volume":"8","author":"Froese T.","year":"2003","journal-title":"J. Inf. Technol. Constr."},{"key":"e_1_3_5_30_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)1084-0680(2002)7:3(125)"},{"key":"e_1_3_5_31_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2008)134:7(509)"},{"key":"e_1_3_5_32_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.isprsjprs.2012.04.004"},{"key":"e_1_3_5_33_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0887-3801(2005)19:2(172)"},{"key":"e_1_3_5_34_1","doi-asserted-by":"crossref","unstructured":"Hegemann F. K. Lehner and M. K\u00f6nig. 2012. \u201cIFC-based product modeling for tunnel boring machines.\u201d In Proc. 9th European Conf. on Product and Process Modeling of eWork and eBusiness in Architecture Engineering and Construction 289\u2013296. London: CRC Press.","DOI":"10.1201\/b12516-47"},{"key":"e_1_3_5_35_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CP.1943-5487.0000291"},{"key":"e_1_3_5_36_1","doi-asserted-by":"crossref","unstructured":"Heikkil\u00e4 R. A. Kaaranka and T. Makkonen. 2014. \u201cInformation modelling based tunnel design and construction process.\u201d In Proc. 31st Int. Symp. on Automation and Robotics in Construction 672\u2013675. Oulu North Ostrobothnia: ISARC. https:\/\/doi.org\/10.22260\/ISARC2014\/0090.","DOI":"10.22260\/ISARC2014\/0090"},{"key":"e_1_3_5_37_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)1090-0241(2001)127:9(726)"},{"key":"e_1_3_5_38_1","volume-title":"Practical rock engineering","author":"Hoek E.","year":"2007"},{"key":"e_1_3_5_39_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.aei.2007.03.001"},{"key":"e_1_3_5_40_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2010.09.014"},{"issue":"1","key":"e_1_3_5_41_1","first-page":"421","article-title":"Knowledge-based engineering for infrastructure facilities: Assisted design of railway tunnels based on logic models and advanced procedural geometry dependencies","volume":"20","author":"Jubierre J. R.","year":"2015","journal-title":"J. Inf. Technol. Constr."},{"issue":"2","key":"e_1_3_5_42_1","first-page":"385","article-title":"Assessment of structural design capability of building information modeling (BIM) tools in building industry of Pakistan","volume":"14","author":"Khan M. S.","year":"2019","journal-title":"J. Mech. Continua Math. Sci."},{"key":"e_1_3_5_43_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2017.07.006"},{"key":"e_1_3_5_44_1","doi-asserted-by":"publisher","DOI":"10.3846\/jcem.2018.6132"},{"key":"e_1_3_5_45_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CP.1943-5487.0000830"},{"key":"e_1_3_5_46_1","doi-asserted-by":"publisher","DOI":"10.4028\/www.scientific.net\/AMM.773-774.933"},{"key":"e_1_3_5_47_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.tust.2018.05.010"},{"key":"e_1_3_5_48_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.proeng.2011.07.130"},{"key":"e_1_3_5_49_1","doi-asserted-by":"publisher","DOI":"10.1007\/s12205-015-0123-8"},{"key":"e_1_3_5_50_1","doi-asserted-by":"publisher","DOI":"10.5772\/58447"},{"key":"e_1_3_5_51_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijproman.2015.09.004"},{"key":"e_1_3_5_52_1","volume-title":"Level of detail for 3D graphics","author":"Luebke D.","year":"2002"},{"key":"e_1_3_5_53_1","doi-asserted-by":"crossref","unstructured":"Marzouk M. and A. Abdel Aty. 2012. \u201cMaintaining subways infrastructures using BIM.\u201d In Proc. Construction Research Congress 2012: Construction Challenges in a Flat World 2320\u20132328. Reston VA: ASCE. https:\/\/doi.org\/10.1061\/9780784412329.233.","DOI":"10.1061\/9780784412329.233"},{"key":"e_1_3_5_54_1","doi-asserted-by":"crossref","unstructured":"Min H. and H. Zhewen. 2014. \u201cOntology-driven tunnel construction information retrieval and extraction.\u201d In Proc. 26th Chinese Control and Decision Conf. (2014 CCDC) 4741\u20134746. New York: IEEE.","DOI":"10.1109\/CCDC.2014.6853021"},{"key":"e_1_3_5_55_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.proeng.2015.11.113"},{"key":"e_1_3_5_56_1","doi-asserted-by":"crossref","unstructured":"Morin G. S. L. Deaton R. Chandler and S. Miles. 2017. \u201cSilvertown Tunnel London England\u2014A case study applying BIM principles to the geotechnical process.\u201d In Geotechnical Frontiers 2017: Transportation Facilities Structures and Site Investigation Geotechnical Special Publication 277 edited by T. L. Brandon and R. J. Valentine 587\u2013595. Reston VA: ASCE. https:\/\/doi.org\/10.1061\/9780784480441.061.","DOI":"10.1061\/9780784480441.061"},{"key":"e_1_3_5_57_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CP.1943-5487.0000822"},{"key":"e_1_3_5_58_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.advengsoft.2017.05.012"},{"key":"e_1_3_5_59_1","doi-asserted-by":"crossref","unstructured":"Osello A. N. Rapetti and F. Semeraro. 2017. \u201cBIM methodology approach to infrastructure design: Case study of Paniga tunnel.\u201d In Vol. 245 of Proc. IOP Conf. Series: Materials Science and Engineering. Bristol UK: IOP. https:\/\/doi.org\/10.1088\/1757-899X\/245\/6\/062052.","DOI":"10.1088\/1757-899X\/245\/6\/062052"},{"key":"e_1_3_5_60_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.tust.2019.103049"},{"key":"e_1_3_5_61_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CP.1943-5487.0000880"},{"key":"e_1_3_5_62_1","doi-asserted-by":"publisher","DOI":"10.3390\/su10030600"},{"key":"e_1_3_5_63_1","unstructured":"Sami H. O. Doukari and N. Ziv. 2016. \u201cDevelopment of a BIM model adapted for the co-maintenance of tunnels.\u201d In Proc. 1st Int. BIM Conf. Zagreb Croatia: Croatian Chamber of Architects."},{"key":"e_1_3_5_64_1","unstructured":"Sawamura M. S. Iwamoto and K. Kashihara. 2014. \u201cFirst application of CIM to tunnel construction in Japan.\u201d In Proc. ISRM Int. Symp.\u20148th Asian Rock Mechanics Symp. ARMS 2014 1054\u20131063. Lisbon Portugal: International Society for Rock Mechanics and Rock Engineering."},{"key":"e_1_3_5_65_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.aei.2011.08.007"},{"key":"e_1_3_5_66_1","volume-title":"Tunnelling in weak rocks","author":"Singh B.","year":"2006","edition":"1"},{"key":"e_1_3_5_67_1","doi-asserted-by":"crossref","unstructured":"Sorge R. D. Buttafoco J. Debenedetti A. Menozzi G. Cimino F. Maltese and B. Tiberi. 2019. \u201cBIM implementation\u2014Brenner Base Tunnel project.\u201d In Proc. WTC 2019 ITA-AITES World Tunnel Congress. London: CRC Press. https:\/\/doi.org\/10.1201\/9780429424441.","DOI":"10.1201\/9780429424441-331"},{"key":"e_1_3_5_68_1","doi-asserted-by":"publisher","DOI":"10.1201\/b13762"},{"key":"e_1_3_5_69_1","doi-asserted-by":"publisher","DOI":"10.1007\/s12205-018-0309-y"},{"key":"e_1_3_5_70_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2004.06.002"},{"key":"e_1_3_5_71_1","doi-asserted-by":"publisher","DOI":"10.1680\/ceat.33405"},{"key":"e_1_3_5_72_1","doi-asserted-by":"publisher","DOI":"10.1201\/9781439834220"},{"key":"e_1_3_5_73_1","doi-asserted-by":"crossref","unstructured":"van Berlo L. A. H. M. and F. Bomhof. 2014. \u201cCreating the Dutch national BIM levels of development.\u201d In Proc. Computing in Civil and Building Engineering 129\u2013136. Reston VA: ASCE. https:\/\/doi.org\/10.1061\/9780784413616.017.","DOI":"10.1061\/9780784413616.017"},{"key":"e_1_3_5_74_1","doi-asserted-by":"publisher","DOI":"10.1007\/s00603-019-01979-2"},{"key":"e_1_3_5_75_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.aei.2012.01.005"},{"key":"e_1_3_5_76_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2016.05.022"},{"key":"e_1_3_5_77_1","doi-asserted-by":"crossref","unstructured":"Xing C. J. Wang and Y. Xu. 2010. \u201cOverlap analysis of the images from unmanned aerial vehicles.\u201d In Proc. 2010 Int. Conf. on Electrical and Control Engineering 1459\u20131462. New York: IEEE. https:\/\/doi.org\/10.1109\/iCECE.2010.360.","DOI":"10.1109\/iCECE.2010.360"},{"key":"e_1_3_5_78_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.aei.2018.12.003"},{"key":"e_1_3_5_79_1","doi-asserted-by":"crossref","unstructured":"Yabuki N. 2008. \u201cRepresentation of caves in a shield tunnel product model.\u201d In Proc. 7th European Conf. on Product and Process Modelling (ECPPM 2008) of eWork and eBusiness in Architecture Engineering and Construction 545\u2013550. London: CRC Press.","DOI":"10.1201\/9780203883327.ch61"},{"key":"e_1_3_5_80_1","doi-asserted-by":"crossref","unstructured":"Yabuki N. T. Aruga and H. Furuya. 2013. \u201cDevelopment and application of a product model for shield tunnels.\u201d In Vol. 30 of Proc. 30th Int. Symp. on Automation and Robotics in Construction 435\u2013447. Oulu Finland: International Association for Automation and Robotics in Construction. https:\/\/doi.org\/10.22260\/ISARC2013\/0047.","DOI":"10.22260\/ISARC2013\/0047"},{"key":"e_1_3_5_81_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.tust.2019.103252"},{"key":"e_1_3_5_82_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2010.09.013"},{"key":"e_1_3_5_83_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2017.05.004"}],"container-title":["Journal of Computing in Civil Engineering"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/ascelibrary.org\/doi\/pdf\/10.1061\/%28ASCE%29CP.1943-5487.0000955","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,6,9]],"date-time":"2022-06-09T23:48:20Z","timestamp":1654818500000},"score":1,"resource":{"primary":{"URL":"https:\/\/ascelibrary.org\/doi\/10.1061\/%28ASCE%29CP.1943-5487.0000955"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2021,3]]},"references-count":82,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2021,3]]}},"alternative-id":["10.1061\/(ASCE)CP.1943-5487.0000955"],"URL":"https:\/\/doi.org\/10.1061\/(asce)cp.1943-5487.0000955","relation":{},"ISSN":["0887-3801","1943-5487"],"issn-type":[{"value":"0887-3801","type":"print"},{"value":"1943-5487","type":"electronic"}],"subject":[],"published":{"date-parts":[[2021,3]]},"assertion":[{"value":"2020-04-21","order":0,"name":"received","label":"Received","group":{"name":"publication_history","label":"Publication History"}},{"value":"2020-10-12","order":1,"name":"accepted","label":"Accepted","group":{"name":"publication_history","label":"Publication History"}},{"value":"2020-12-18","order":2,"name":"published","label":"Published","group":{"name":"publication_history","label":"Publication History"}}],"article-number":"04020068"}}