{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,14]],"date-time":"2026-04-14T05:12:30Z","timestamp":1776143550945,"version":"3.50.1"},"reference-count":41,"publisher":"American Society of Civil Engineers (ASCE)","issue":"5","content-domain":{"domain":["ascelibrary.org"],"crossmark-restriction":true},"short-container-title":["J. Comput. Civ. Eng."],"published-print":{"date-parts":[[2022,9]]},"DOI":"10.1061\/(asce)cp.1943-5487.0001037","type":"journal-article","created":{"date-parts":[[2022,6,15]],"date-time":"2022-06-15T04:09:01Z","timestamp":1655266141000},"update-policy":"https:\/\/doi.org\/10.1061\/do.news.20190416.0001","source":"Crossref","is-referenced-by-count":9,"title":["Variance Analysis on Regression Models for Estimating Labor Costs of Prefabricated Components"],"prefix":"10.1061","volume":"36","author":[{"ORCID":"https:\/\/orcid.org\/0000-0003-2066-7948","authenticated-orcid":true,"given":"Monjurul","family":"Hasan","sequence":"first","affiliation":[{"name":"Ph.D. Candidate, Dept. of Civil and Environmental Engineering, Univ. of Alberta, DICE Bldg., 9211\u2014116\u00a0St. NW Edmonton, AB, Canada T6G 1H9. ORCID: ."}],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-8191-8627","authenticated-orcid":true,"given":"Ming","family":"Lu","sequence":"additional","affiliation":[{"name":"Professor, Dept. of Civil and Environmental Engineering, Univ. of Alberta, DICE Bldg., 9211\u2014116\u00a0St. NW Edmonton, AB, Canada T6G 1H9 (corresponding author). ORCID: ."}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"30","reference":[{"key":"e_1_3_3_2_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)SU.1943-5428.0000153"},{"key":"e_1_3_3_3_1","doi-asserted-by":"publisher","DOI":"10.1007\/BF00142572"},{"key":"e_1_3_3_4_1","volume-title":"Professional construction management: Including CM, design-construct, and general contracting: Series in construction engineering and project management","author":"Barrie D. S.","year":"2001","unstructured":"Barrie, D. S., and B. C. Paulson. 2001. Professional construction management: Including CM, design-construct, and general contracting: Series in construction engineering and project management. 3rd ed. New York: McGraw-Hill.","edition":"3"},{"key":"e_1_3_3_5_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CO.1943-7862.0001183"},{"key":"e_1_3_3_6_1","doi-asserted-by":"publisher","DOI":"10.1080\/01446190500184444"},{"key":"e_1_3_3_7_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.proeng.2016.11.655"},{"key":"e_1_3_3_8_1","doi-asserted-by":"publisher","DOI":"10.1109\/JPROC.2006.887289"},{"key":"e_1_3_3_9_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CP.1943-5487.0000788"},{"key":"e_1_3_3_10_1","doi-asserted-by":"publisher","DOI":"10.1080\/01446190500039812"},{"key":"e_1_3_3_11_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2004)130:1(50)"},{"key":"e_1_3_3_12_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CP.1943-5487.0000533"},{"key":"e_1_3_3_13_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CP.1943-5487.0000088"},{"key":"e_1_3_3_14_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CO.1943-7862.0000160"},{"key":"e_1_3_3_15_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CO.1943-7862.0000838"},{"key":"e_1_3_3_16_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0887-3801(2007)21:6(402)"},{"issue":"1","key":"e_1_3_3_17_1","first-page":"73","article-title":"Factors affecting the accuracy of pre-tender cost estimates in the Gaza strip","volume":"18","author":"Enshassi A.","year":"2013","unstructured":"Enshassi, A., S. Mohamed, and M. Abdel-Hadi. 2013. \u201cFactors affecting the accuracy of pre-tender cost estimates in the Gaza strip.\u201d Constr. Dev. Countries 18 (1): 73\u201394.","journal-title":"Constr. Dev. Countries"},{"key":"e_1_3_3_18_1","first-page":"150","volume-title":"Computing in civil engineering: Smart safety, sustainability, and resilience","author":"Hasan M.","year":"2017","unstructured":"Hasan, M., and M. Lu. 2017. \u201cError quantification and visualization in using sensors to position backhoe excavator.\u201d In Computing in civil engineering: Smart safety, sustainability, and resilience, edited by K. Y. Lin, N. El-Gohery, and P. Tang, 150\u2013157. Reston, VA: ASCE."},{"key":"e_1_3_3_19_1","doi-asserted-by":"crossref","unstructured":"Hasan M. and M. Lu. 2019. \u201cPlanning and scheduling bridge girders fabrication through shop-floor operations simulation.\u201d In Vol. 1 of Proc. 2019 European Conf. on Computing in Construction 75\u201384. Cambridge UK: European Council on Computing in Construction. https:\/\/doi.org\/10.35490\/ec3.2019.162.","DOI":"10.35490\/EC3.2019.162"},{"key":"e_1_3_3_20_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CO.1943-7862.0002010"},{"key":"e_1_3_3_21_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2020.103280"},{"key":"e_1_3_3_22_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.buildenv.2004.02.013"},{"key":"e_1_3_3_23_1","doi-asserted-by":"publisher","DOI":"10.1007\/s00190-010-0375-5"},{"key":"e_1_3_3_24_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2017.08.009"},{"key":"e_1_3_3_25_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0887-3801(1996)10:4(300)"},{"key":"e_1_3_3_26_1","doi-asserted-by":"crossref","unstructured":"Liu J. M. F. F. Siu and M. Lu. 2016. \u201cModular construction system simulation incorporating off-shore fabrication and multi-mode transportation.\u201d In Proc. Winter Simulation Conf. 2016 3269\u20133280. New York: IEEE. https:\/\/doi.org\/10.1109\/WSC.2016.7822358.","DOI":"10.1109\/WSC.2016.7822358"},{"key":"e_1_3_3_27_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CP.1943-5487.0000032"},{"key":"e_1_3_3_28_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2006)132:7(750)"},{"key":"e_1_3_3_29_1","unstructured":"Lu M. M. Soleimanifar and A. Mohsenijam. 2017. \u201cPractical framework for estimating and planning engineered material fabrication: Case of piping spools.\u201d In Proc. 2017 Int. Conf. on Business Big-Data and Decision Sciences (ICBBD2017) 41\u201348. Bangkok Thailand: Chulalongkorn Univ."},{"key":"e_1_3_3_30_1","doi-asserted-by":"publisher","DOI":"10.1109\/ACCESS.2019.2918177"},{"key":"e_1_3_3_31_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)WR.1943-5452.0000627"},{"key":"e_1_3_3_32_1","doi-asserted-by":"publisher","DOI":"10.1139\/cjce-2018-0349"},{"key":"e_1_3_3_33_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CP.1943-5487.0000636"},{"key":"e_1_3_3_34_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.csda.2006.02.006"},{"key":"e_1_3_3_35_1","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-319-55252-1"},{"key":"e_1_3_3_36_1","volume-title":"Planning and estimating heavy construction","author":"Parker A. D.","year":"1984","unstructured":"Parker, A. D., D. S. Barrie, and R. M. Snyder. 1984. Planning and estimating heavy construction. New York: McGraw-Hill."},{"key":"e_1_3_3_37_1","volume-title":"A guide to the project management body of knowledge (PMBOK guide)","author":"PMI (Project Management Institute)","year":"2017","unstructured":"PMI (Project Management Institute). 2017. A guide to the project management body of knowledge (PMBOK guide). 6th ed. Newtown Square, PA: PMI.","edition":"6"},{"key":"e_1_3_3_38_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(1997)123:4(399)"},{"key":"e_1_3_3_39_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2003)129:2(198)"},{"key":"e_1_3_3_40_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ndteint.2017.04.002"},{"key":"e_1_3_3_41_1","doi-asserted-by":"publisher","DOI":"10.1007\/s10109-014-0207-x"},{"key":"e_1_3_3_42_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2005)131:7(779)"}],"container-title":["Journal of Computing in Civil Engineering"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/ascelibrary.org\/doi\/pdf\/10.1061\/%28ASCE%29CP.1943-5487.0001037","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,6,15]],"date-time":"2022-06-15T04:09:09Z","timestamp":1655266149000},"score":1,"resource":{"primary":{"URL":"https:\/\/ascelibrary.org\/doi\/10.1061\/%28ASCE%29CP.1943-5487.0001037"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2022,9]]},"references-count":41,"journal-issue":{"issue":"5","published-print":{"date-parts":[[2022,9]]}},"alternative-id":["10.1061\/(ASCE)CP.1943-5487.0001037"],"URL":"https:\/\/doi.org\/10.1061\/(asce)cp.1943-5487.0001037","relation":{},"ISSN":["0887-3801","1943-5487"],"issn-type":[{"value":"0887-3801","type":"print"},{"value":"1943-5487","type":"electronic"}],"subject":[],"published":{"date-parts":[[2022,9]]},"assertion":[{"value":"2021-12-19","order":0,"name":"received","label":"Received","group":{"name":"publication_history","label":"Publication History"}},{"value":"2022-04-12","order":1,"name":"accepted","label":"Accepted","group":{"name":"publication_history","label":"Publication History"}},{"value":"2022-06-15","order":2,"name":"published","label":"Published","group":{"name":"publication_history","label":"Publication History"}}],"article-number":"04022019"}}