{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,6,25]],"date-time":"2026-06-25T04:21:47Z","timestamp":1782361307133,"version":"3.54.5"},"reference-count":36,"publisher":"American Society of Civil Engineers (ASCE)","issue":"7","content-domain":{"domain":["ascelibrary.org"],"crossmark-restriction":true},"short-container-title":["J. Constr. Eng. Manage."],"published-print":{"date-parts":[[2021,7]]},"DOI":"10.1061\/(asce)co.1943-7862.0002082","type":"journal-article","created":{"date-parts":[[2021,5,11]],"date-time":"2021-05-11T12:25:38Z","timestamp":1620735938000},"update-policy":"https:\/\/doi.org\/10.1061\/do.news.20190416.0001","source":"Crossref","is-referenced-by-count":59,"title":["Interactions between Lean Construction Principles and Circular Economy Practices for the Construction Industry"],"prefix":"10.1061","volume":"147","author":[{"ORCID":"https:\/\/orcid.org\/0000-0002-2713-0310","authenticated-orcid":true,"given":"Gabriel Luiz Fritz","family":"Benachio","sequence":"first","affiliation":[{"name":"Master Student, Dept. of Civil Construction Engineering, Federal Univ. of Paran\u00e1, Centro Polit\u00e9cnico, Curitiba, PR 81531-980, Brazil (corresponding author). ORCID: ."}],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Maria do Carmo Duarte","family":"Freitas","sequence":"additional","affiliation":[{"name":"Professor, Dept. of Civil Construction Engineering, Federal Univ. of Paran\u00e1, Centro Polit\u00e9cnico, Curitiba, PR 81531-980, Brazil."}],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Sergio Fernando","family":"Tavares","sequence":"additional","affiliation":[{"name":"Professor, Dept. of Civil Construction Engineering, Federal Univ. of Paran\u00e1, Centro Polit\u00e9cnico, Curitiba, PR 81531-980, Brazil."}],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"30","reference":[{"key":"e_1_3_4_2_1","doi-asserted-by":"publisher","DOI":"10.1177\/0269094215578226"},{"key":"e_1_3_4_3_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.buildenv.2018.10.051"},{"key":"e_1_3_4_4_1","unstructured":"BAMB (Building As Material Banks). 2016. \u201cD1 synthesis of the state-of-art.\u201d Accessed May 25 2019. http:\/\/www.bamb2020.eu\/wp-content\/uploads\/2016\/03\/D1_Synthesis-report-on-State-of-the-art_20161129_FINAL.pdf\/."},{"key":"e_1_3_4_5_1","unstructured":"BAMB (Building As Material Banks). 2018. \u201cReversible building design guidelines.\u201d Accessed January 8 2020. http:\/\/www.bamb2020.eu\/wp-content\/uploads\/2018\/12\/Reversible-Building-Design-guidelines-and-protocol.pdf."},{"key":"e_1_3_4_6_1","volume-title":"L\u2019Analyse de Contenu","author":"Bardin L.","year":"1977","unstructured":"Bardin, L. 1977. L\u2019Analyse de Contenu. [In French.] Paris: Presses Universistaires de France."},{"key":"e_1_3_4_7_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.jclepro.2020.121046"},{"key":"e_1_3_4_8_1","first-page":"83","article-title":"Innovative circular solutions and services for new buildings and refurbishments","volume":"183","author":"Bertino G.","year":"2019","unstructured":"Bertino, G., F. Menconi, A. Zraunig, E. Terzidis, and J. Kisser. 2019. \u201cInnovative circular solutions and services for new buildings and refurbishments.\u201d WIT Trans. Built Environ. 183: 83\u201391. https:\/\/doi:10.2495\/ARC180081.","journal-title":"WIT Trans. Built Environ."},{"key":"e_1_3_4_9_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.jclepro.2019.05.216"},{"key":"e_1_3_4_10_1","unstructured":"EMF (Ellen MacArthur Foundation). 2012. \u201cTowards the circular economy Vol. 1: An economic and business rationale for an accelerated transition.\u201d Accessed May 24 2019. https:\/\/www.ellenmacarthurfoundation.org\/publications\/towards-the-circular-economy-vol-1-an-economic-and-business-rationale-for-an-accelerated-transition."},{"key":"e_1_3_4_11_1","unstructured":"EMF (Ellen MacArthur Foundation). 2013. \u201cTowards the circular economy Vol. 2: Opportunities for the consumer goods sector.\u201d Accessed May 24 2019. https:\/\/www.ellenmacarthurfoundation.org\/publications\/towards-the-circular-economy-vol-2-opportunities-for-the-consumer-goods-sector."},{"key":"e_1_3_4_12_1","unstructured":"EMF (Ellen MacArthur Foundation). 2014. \u201cTowards the circular economy Vol. 3: Accelerating the scale-up across global supply chains.\u201d Accessed May 24 2019. https:\/\/www.ellenmacarthurfoundation.org\/publications\/towards-the-circular-economy-vol-3-accelerating-the-scale-up-across-global-supply-chains."},{"key":"e_1_3_4_13_1","unstructured":"EMF (Ellen MacArthur Foundation). 2015. \u201cTowards a circular economy: Business rationale for an accelerated transition.\u201d Accessed May 24 2019. https:\/\/www.ellenmacarthurfoundation.org\/publications\/towards-a-circular-economy-business-rationale-for-an-accelerated-transition."},{"key":"e_1_3_4_14_1","unstructured":"European Commission. 2016. \u201cConstruction and demolition waste (CDW).\u201d Accessed May 2 2018. http:\/\/ec.europa.eu\/environment\/waste\/construction_demolition.htm."},{"key":"e_1_3_4_15_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.jclepro.2019.119913"},{"key":"e_1_3_4_16_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.jclepro.2017.11.207"},{"key":"e_1_3_4_17_1","unstructured":"Howell G. and G. Ballard. 1998. \u201cImplementing lean construction: Understanding and action.\u201d In Proc. 6th Annual Conf. of the Int. Group for Lean Construction. Guaruj\u00e1 Brazil: The International Group for Lean Construction."},{"key":"e_1_3_4_18_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.resconrec.2017.09.029"},{"key":"e_1_3_4_19_1","doi-asserted-by":"publisher","DOI":"10.1080\/01446193.2010.498481"},{"key":"e_1_3_4_20_1","doi-asserted-by":"publisher","DOI":"10.3390\/su1030674"},{"key":"e_1_3_4_22_1","doi-asserted-by":"publisher","DOI":"10.1108\/F-12-2017-0129"},{"key":"e_1_3_4_23_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.scs.2020.102355"},{"key":"e_1_3_4_24_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ecolecon.2018.12.012"},{"key":"e_1_3_4_25_1","doi-asserted-by":"publisher","DOI":"10.3390\/buildings8090125"},{"key":"e_1_3_4_26_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.jclepro.2020.121134"},{"key":"e_1_3_4_27_1","unstructured":"Nadeem S. P. J. A. Garza-Reyes A. I. Anosike and V. Kumar. 2019. \u201cCoalescing the lean and circular economy.\u201d In Proc. Int. Conf. on Industrial Engineering and Operations Management 1082\u20131093. Thailand: Industrial Engineering and Operations Management."},{"key":"e_1_3_4_28_1","volume-title":"The Toyota production system: Beyond large-scale production","author":"Ohno T.","year":"1988","unstructured":"Ohno, T. 1988. The Toyota production system: Beyond large-scale production. Portland, OR: Productivity Press."},{"key":"e_1_3_4_29_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.jclepro.2016.12.055"},{"key":"e_1_3_4_30_1","volume-title":"Real world research: A resource for social scientists and practitioner-researchers","author":"Robson C.","year":"2006","unstructured":"Robson, C. 2006. Real world research: A resource for social scientists and practitioner-researchers. Malden, MA: Blackwell."},{"key":"e_1_3_4_31_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CO.1943-7862.0000203"},{"key":"e_1_3_4_32_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.jclepro.2017.11.030"},{"key":"e_1_3_4_33_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.oneear.2019.08.018"},{"key":"e_1_3_4_34_1","volume-title":"Non-stock production: The Shingo system for continuous improvement","author":"Shingo S.","year":"1988","unstructured":"Shingo, S. 1988. Non-stock production: The Shingo system for continuous improvement. Cambridge, UK: Productivity Press."},{"key":"e_1_3_4_35_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.jclepro.2015.02.051"},{"key":"e_1_3_4_36_1","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-319-10377-8_13"},{"key":"e_1_3_4_37_1","volume-title":"Lean thinking","author":"Womack J. P.","year":"1996","unstructured":"Womack, J. P., and D. T. Jones. 1996. Lean thinking. New York: Simon & Schuster."},{"key":"e_1_3_4_38_1","volume-title":"The machine that changed the world: The story of lean production","author":"Womack J. P.","year":"1991","unstructured":"Womack, J. P., D. T. Jones, and D. Roos. 1991. The machine that changed the world: The story of lean production. New York: Harper Perennial."}],"container-title":["Journal of Construction Engineering and Management"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/ascelibrary.org\/doi\/pdf\/10.1061\/%28ASCE%29CO.1943-7862.0002082","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,6,10]],"date-time":"2022-06-10T00:01:47Z","timestamp":1654819307000},"score":1,"resource":{"primary":{"URL":"https:\/\/ascelibrary.org\/doi\/10.1061\/%28ASCE%29CO.1943-7862.0002082"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2021,7]]},"references-count":36,"journal-issue":{"issue":"7","published-print":{"date-parts":[[2021,7]]}},"alternative-id":["10.1061\/(ASCE)CO.1943-7862.0002082"],"URL":"https:\/\/doi.org\/10.1061\/(asce)co.1943-7862.0002082","relation":{},"ISSN":["0733-9364","1943-7862"],"issn-type":[{"value":"0733-9364","type":"print"},{"value":"1943-7862","type":"electronic"}],"subject":[],"published":{"date-parts":[[2021,7]]},"assertion":[{"value":"2020-03-31","order":0,"name":"received","label":"Received","group":{"name":"publication_history","label":"Publication History"}},{"value":"2021-01-22","order":1,"name":"accepted","label":"Accepted","group":{"name":"publication_history","label":"Publication History"}},{"value":"2021-05-11","order":2,"name":"published","label":"Published","group":{"name":"publication_history","label":"Publication History"}}],"article-number":"04021068"}}