{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,8,2]],"date-time":"2025-08-02T14:39:06Z","timestamp":1754145546556,"version":"3.41.2"},"reference-count":41,"publisher":"American Society of Civil Engineers (ASCE)","issue":"5","content-domain":{"domain":["ascelibrary.org"],"crossmark-restriction":true},"short-container-title":["J. Comput. Civ. Eng."],"published-print":{"date-parts":[[2025,9]]},"DOI":"10.1061\/jccee5.cpeng-5929","type":"journal-article","created":{"date-parts":[[2025,7,12]],"date-time":"2025-07-12T05:30:36Z","timestamp":1752298236000},"update-policy":"https:\/\/doi.org\/10.1061\/do.news.20190416.0001","source":"Crossref","is-referenced-by-count":0,"title":["BIM-Based Automated Design Framework for Pavement Structures Considering Economy and Sustainability"],"prefix":"10.1061","volume":"39","author":[{"given":"Tao","family":"Han","sequence":"first","affiliation":[{"name":"Southeast Univ.","place":["China"]}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Chengjia","family":"Han","sequence":"additional","affiliation":[{"name":"Nanyang Technological Univ.","place":["Singapore"]}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Tao","family":"Ma","sequence":"additional","affiliation":[{"name":"Southeast Univ.","place":["China"]}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"30","reference":[{"key":"e_1_3_4_2_1","doi-asserted-by":"publisher","DOI":"10.1080\/14680629.2019.1593229"},{"key":"e_1_3_4_3_1","doi-asserted-by":"publisher","DOI":"10.3390\/su13105392"},{"key":"e_1_3_4_4_1","first-page":"21","volume-title":"Pavement design by elastic layer theory","author":"Barker W. R.","year":"1991","unstructured":"Barker, W. R., and C. R. Gonzalez. 1991. Pavement design by elastic layer theory, 21\u201343. Reston, VA: ASCE."},{"key":"e_1_3_4_5_1","doi-asserted-by":"publisher","DOI":"10.3390\/infrastructures5040037"},{"issue":"2","key":"e_1_3_4_6_1","first-page":"352","article-title":"Potentialities of a highway alignment optimization method in an I-BIM environment","volume":"63","author":"Bongiorno N.","year":"2019","unstructured":"Bongiorno, N., G. Bosurgi, F. Carbone, O. Pellegrino, and G. Sollazzo. 2019. \u201cPotentialities of a highway alignment optimization method in an I-BIM environment.\u201d Period. Polytech. Civ. Eng. 63 (2): 352\u2013361. https:\/\/doi.org\/10.3311\/PPci.12220.","journal-title":"Period. Polytech. Civ. Eng."},{"key":"e_1_3_4_7_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CO.1943-7862.0000560"},{"key":"e_1_3_4_8_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.trc.2016.11.019"},{"key":"e_1_3_4_9_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2021.103911"},{"key":"e_1_3_4_10_1","doi-asserted-by":"publisher","DOI":"10.1007\/s12205-014-0373-x"},{"key":"e_1_3_4_11_1","doi-asserted-by":"publisher","DOI":"10.3390\/buildings12101753"},{"key":"e_1_3_4_12_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2018.07.001"},{"key":"e_1_3_4_13_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.conbuildmat.2023.130351"},{"key":"e_1_3_4_14_1","doi-asserted-by":"publisher","DOI":"10.3390\/su13042039"},{"key":"e_1_3_4_15_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.conbuildmat.2019.01.198"},{"key":"e_1_3_4_16_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2023.104884"},{"key":"e_1_3_4_17_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.engfailanal.2019.06.029"},{"key":"e_1_3_4_18_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.trd.2020.102594"},{"key":"e_1_3_4_19_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2022.104406"},{"key":"e_1_3_4_20_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2022.104601"},{"key":"e_1_3_4_21_1","doi-asserted-by":"publisher","DOI":"10.1080\/10298436.2014.943218"},{"key":"e_1_3_4_22_1","doi-asserted-by":"publisher","DOI":"10.1139\/cjce-2012-0465"},{"key":"e_1_3_4_23_1","doi-asserted-by":"publisher","DOI":"10.1111\/mice.12280"},{"key":"e_1_3_4_24_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.trc.2016.05.010"},{"key":"e_1_3_4_25_1","doi-asserted-by":"publisher","DOI":"10.1007\/s10694-021-01153-7"},{"key":"e_1_3_4_26_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.conbuildmat.2021.124216"},{"key":"e_1_3_4_27_1","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1109\/TIM.2023.3267372","article-title":"Asphalt pavement residual life assessment based on SmartRock sensors","volume":"72","author":"Ma T.","year":"2023","unstructured":"Ma, T., N. Wang, C. Han, S. Wang, and Z. Tong. 2023. \u201cAsphalt pavement residual life assessment based on SmartRock sensors.\u201d IEEE Trans. Instrum. Meas. 72 (Apr): 1\u20132. https:\/\/doi.org\/10.1109\/TIM.2023.3267372.","journal-title":"IEEE Trans. Instrum. Meas."},{"key":"e_1_3_4_28_1","doi-asserted-by":"publisher","DOI":"10.3390\/s21165439"},{"key":"e_1_3_4_29_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)TE.1943-5436.0000346"},{"key":"e_1_3_4_30_1","volume-title":"Specifications for design of highway asphalt pavement","author":"Ministry of Transport of the People\u2019s Republic of China","year":"2017","unstructured":"Ministry of Transport of the People\u2019s Republic of China. 2017. Specifications for design of highway asphalt pavement. Beijing: China Communications Press."},{"key":"e_1_3_4_31_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.jobe.2019.100907"},{"key":"e_1_3_4_32_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.buildenv.2018.05.006"},{"key":"e_1_3_4_33_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2017.03.005"},{"key":"e_1_3_4_34_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2019.02.011"},{"key":"e_1_3_4_35_1","doi-asserted-by":"publisher","DOI":"10.1007\/s11831-014-9125-9"},{"key":"e_1_3_4_36_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2019.103066"},{"key":"e_1_3_4_37_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2020.103152"},{"key":"e_1_3_4_38_1","doi-asserted-by":"publisher","DOI":"10.1111\/mice.12350"},{"key":"e_1_3_4_39_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2021.103752"},{"key":"e_1_3_4_40_1","doi-asserted-by":"publisher","DOI":"10.1007\/s12205-022-0448-z"},{"key":"e_1_3_4_41_1","doi-asserted-by":"publisher","DOI":"10.1007\/s00158-021-02953-9"},{"key":"e_1_3_4_42_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.conbuildmat.2016.11.086"}],"container-title":["Journal of Computing in Civil Engineering"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/ascelibrary.org\/doi\/pdf\/10.1061\/JCCEE5.CPENG-5929","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,7,17]],"date-time":"2025-07-17T05:30:38Z","timestamp":1752730238000},"score":1,"resource":{"primary":{"URL":"https:\/\/ascelibrary.org\/doi\/10.1061\/JCCEE5.CPENG-5929"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2025,9]]},"references-count":41,"journal-issue":{"issue":"5","published-print":{"date-parts":[[2025,9]]}},"alternative-id":["10.1061\/JCCEE5.CPENG-5929"],"URL":"https:\/\/doi.org\/10.1061\/jccee5.cpeng-5929","relation":{},"ISSN":["0887-3801","1943-5487"],"issn-type":[{"type":"print","value":"0887-3801"},{"type":"electronic","value":"1943-5487"}],"subject":[],"published":{"date-parts":[[2025,9]]},"assertion":[{"value":"2024-01-08","order":0,"name":"received","label":"Received","group":{"name":"publication_history","label":"Publication History"}},{"value":"2025-02-24","order":2,"name":"accepted","label":"Accepted","group":{"name":"publication_history","label":"Publication History"}},{"value":"2025-07-12","order":3,"name":"published","label":"Published","group":{"name":"publication_history","label":"Publication History"}}],"article-number":"04025075"}}