{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,30]],"date-time":"2026-03-30T18:39:18Z","timestamp":1774895958490,"version":"3.50.1"},"reference-count":65,"publisher":"American Society of Civil Engineers (ASCE)","issue":"3","content-domain":{"domain":["ascelibrary.org"],"crossmark-restriction":true},"short-container-title":["J. Comput. Civ. Eng."],"published-print":{"date-parts":[[2025,5]]},"DOI":"10.1061\/jccee5.cpeng-6254","type":"journal-article","created":{"date-parts":[[2025,2,27]],"date-time":"2025-02-27T10:09:35Z","timestamp":1740650975000},"update-policy":"https:\/\/doi.org\/10.1061\/do.news.20190416.0001","source":"Crossref","is-referenced-by-count":3,"title":["A Hybrid BIM-Fuzzy Model for Enhanced Assessment of Building Element Conditions"],"prefix":"10.1061","volume":"39","author":[{"given":"Mani Amrouni","family":"Hosseini","sequence":"first","affiliation":[{"name":"Islamic Azad Univ.","place":["Iran"]}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Mehdi","family":"Ravanshadnia","sequence":"additional","affiliation":[{"name":"Islamic Azad Univ.","place":["Iran"]}],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-2632-4869","authenticated-orcid":true,"given":"Majid","family":"Rahimzadegan","sequence":"additional","affiliation":[{"name":"K. N. Toosi Univ. of Technology","place":["Iran"]}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Saeed","family":"Ramezani","sequence":"additional","affiliation":[{"name":"Imam Hossein Comprehensive Univ.","place":["Iran"]}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"30","reference":[{"key":"e_1_3_2_2_1","unstructured":"Abbott G. J. McDuling S. Parsons and J. Schoeman. 2007. \u201cBuilding condition assessment: A performance evaluation tool towards sustainable asset management.\u201d In Proc. CIB World Building Congress 14. Ottawa: International Council for Research and Innovation in Building and Construction."},{"issue":"2","key":"e_1_3_2_3_1","article-title":"International construction projects\u2019 risk cost estimation: Fuzzy logic and AHP in application (real case studies)","volume":"2","author":"Abd El Khalek H.","year":"2017","unstructured":"Abd El Khalek, H., R. F. Aziz, and H. Kamel. 2017. \u201cInternational construction projects\u2019 risk cost estimation: Fuzzy logic and AHP in application (real case studies).\u201d J. Build. Sustainability 2 (2).","journal-title":"J. Build. Sustainability"},{"issue":"2","key":"e_1_3_2_4_1","first-page":"166","article-title":"Integration of building maintenance data in application of building information modeling (BIM)","volume":"2","author":"Ahn D.","year":"2014","unstructured":"Ahn, D., and H. Cha. 2014. \u201cIntegration of building maintenance data in application of building information modeling (BIM).\u201d J. Build. Constr. Plann. Res. 2 (2): 166\u2013172. https:\/\/doi.org\/10.4236\/jbcpr.2014.22015.","journal-title":"J. Build. Constr. Plann. Res."},{"key":"e_1_3_2_5_1","unstructured":"Akcamete A. B. Akinci and J. H. Garrett. 2010. \u201cPotential utilization of building information models for planning maintenance activities.\u201d In Proc. Int. Conf. on Computing in Civil and Building Engineering. Nottingham UK: Nottingham University Press."},{"key":"e_1_3_2_6_1","doi-asserted-by":"publisher","DOI":"10.13189\/cea.2022.100204"},{"key":"e_1_3_2_7_1","doi-asserted-by":"publisher","DOI":"10.3233\/JIFS-202424"},{"key":"e_1_3_2_8_1","doi-asserted-by":"publisher","DOI":"10.1145\/3057730"},{"issue":"2","key":"e_1_3_2_9_1","first-page":"88","article-title":"Review paper on construction defects","volume":"12","author":"Bagdiya N.","year":"2015","unstructured":"Bagdiya, N., and S. Wadalkar. 2015. \u201cReview paper on construction defects.\u201d IOSR J. Mech. Civil Eng. 12 (2): 88\u201391.","journal-title":"IOSR J. Mech. Civil Eng."},{"key":"e_1_3_2_10_1","first-page":"12794","article-title":"Analysis of top management support and its impact towards successful of maintenance management task in manufacturing plant","volume":"83","author":"Bakri A.","year":"2020","unstructured":"Bakri, A., M. Alkbir, F. Januddi, M. Tohid, A. Ismail, A. Ahmad, and I. Zakaria. 2020. \u201cAnalysis of top management support and its impact towards successful of maintenance management task in manufacturing plant.\u201d Test Eng. Manage. 83 (May): 12794\u201312805.","journal-title":"Test Eng. Manage."},{"issue":"1","key":"e_1_3_2_11_1","first-page":"4","article-title":"General building defects: Causes, symptoms and remedial work","volume":"3","author":"Bakri N. N. O.","year":"2014","unstructured":"Bakri, N. N. O., and M. A. O. Mydin. 2014. \u201cGeneral building defects: Causes, symptoms and remedial work.\u201d Eur. J. Technol. Des. 3 (1): 4\u201317. https:\/\/doi.org\/10.13187\/ejtd.2014.3.4.","journal-title":"Eur. J. Technol. Des."},{"key":"e_1_3_2_12_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CO.1943-7862.0000433"},{"issue":"1","key":"e_1_3_2_13_1","first-page":"129","article-title":"Causes of defects in building construction projects and its recommended remedial measures: A case study in Tepi Town, Southern Ethiopia","volume":"6","author":"Borku W.","year":"2020","unstructured":"Borku, W. 2020. \u201cCauses of defects in building construction projects and its recommended remedial measures: A case study in Tepi Town, Southern Ethiopia.\u201d Int. J. Adv. Res. Ideas Innovations Technol. 6 (1): 129\u2013131.","journal-title":"Int. J. Adv. Res. Ideas Innovations Technol."},{"key":"e_1_3_2_14_1","doi-asserted-by":"publisher","DOI":"10.1080\/09613218.2019.1704208"},{"key":"e_1_3_2_15_1","unstructured":"BSI (British Standards Institution). 2013. Specification for information management for the capital\/delivery phase of construction projects using building information modelling. PAS 1192-2:2013. London: BSI."},{"key":"e_1_3_2_16_1","doi-asserted-by":"publisher","DOI":"10.1109\/TSM.2019.2902657"},{"key":"e_1_3_2_17_1","doi-asserted-by":"publisher","DOI":"10.1109\/TPAMI.1979.4766909"},{"key":"e_1_3_2_18_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.jobe.2016.11.004"},{"key":"e_1_3_2_19_1","doi-asserted-by":"publisher","DOI":"10.1108\/02630800810906566"},{"key":"e_1_3_2_20_1","unstructured":"De Sitter W. 1984. \u201cCosts of service life optimization\u2019 The law of fives.\u201d In Proc. CEB-RILEM Workshop on Durability of Concrete Structures (Copenhagen Denmark May 18-20 1983). Lausanne Switzerland: Comit\u00e9 Euro-International du B\u00e9ton."},{"key":"e_1_3_2_21_1","doi-asserted-by":"publisher","DOI":"10.1108\/F-03-2018-0043"},{"key":"e_1_3_2_22_1","volume-title":"BIM handbook: A guide to building information modeling for owners, managers, designers, engineers and contractors","author":"Eastman C. M.","year":"2011","unstructured":"Eastman, C. M. 2011. BIM handbook: A guide to building information modeling for owners, managers, designers, engineers and contractors. New York: Wiley."},{"key":"e_1_3_2_23_1","doi-asserted-by":"crossref","unstructured":"Eweda A. T. Zayed and S. Alkass. 2010. \u201cAn integrated condition assessment model for buildings.\u201d In Proc. Construction Research Congress 2010: Innovation for Reshaping Construction Practice. Reston VA: ASCE.","DOI":"10.1061\/41109(373)139"},{"key":"e_1_3_2_24_1","first-page":"1","article-title":"Factors and defects analysis of physical and environmental condition of buildings","volume":"5","author":"Faqih F.","year":"2020","unstructured":"Faqih, F., T. Zayed, and E. Soliman. 2020. \u201cFactors and defects analysis of physical and environmental condition of buildings.\u201d J. Build. Pathol. Rehabil. 5 (Mar): 1\u201315.","journal-title":"J. Build. Pathol. Rehabil."},{"key":"e_1_3_2_25_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.rser.2014.07.188"},{"key":"e_1_3_2_26_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CF.1943-5509.0000693"},{"key":"e_1_3_2_27_1","first-page":"223","volume-title":"Cost analysis of inadequate interoperability in the US capital facilities industry","author":"GCR (Government Contractor Report)","year":"2004","unstructured":"GCR (Government Contractor Report). 2004. Cost analysis of inadequate interoperability in the US capital facilities industry, 223\u2013253. Gaithersburg, MD: NIST."},{"key":"e_1_3_2_28_1","doi-asserted-by":"publisher","DOI":"10.1109\/TII.2020.3036168"},{"key":"e_1_3_2_29_1","doi-asserted-by":"publisher","DOI":"10.1061\/JPCFEV.CFENG-4828"},{"key":"e_1_3_2_30_1","doi-asserted-by":"publisher","DOI":"10.1108\/SS-02-2015-0008"},{"key":"e_1_3_2_31_1","unstructured":"ISO. 2011. Buildings and constructed assets-service life planning-Part 1: General principles and framework. ISO 15686-1: 2011. Geneva: ISO."},{"key":"e_1_3_2_32_1","doi-asserted-by":"publisher","DOI":"10.1109\/21.256541"},{"key":"e_1_3_2_33_1","doi-asserted-by":"publisher","DOI":"10.3991\/ijoe.v19i04.37059"},{"key":"e_1_3_2_34_1","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-319-59614-3_1"},{"key":"e_1_3_2_35_1","doi-asserted-by":"publisher","DOI":"10.1108\/BEPAM-02-2014-0011"},{"key":"e_1_3_2_36_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.buildenv.2017.03.009"},{"key":"e_1_3_2_37_1","doi-asserted-by":"publisher","DOI":"10.1155\/2013\/124249"},{"key":"e_1_3_2_38_1","doi-asserted-by":"crossref","unstructured":"Linggar S. A. Aminullah and A. Triwiyono. 2019. \u201cAnalysis of building and its components condition assessment case study of dormitory buildings.\u201d In Proc. MATEC Web of Conf. Les Ulis France: EDP Sciences.","DOI":"10.1051\/matecconf\/201925803003"},{"key":"e_1_3_2_39_1","doi-asserted-by":"publisher","DOI":"10.3390\/mti2020021"},{"key":"e_1_3_2_40_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)ME.1943-5479.0000356"},{"key":"e_1_3_2_41_1","doi-asserted-by":"publisher","DOI":"10.1016\/S0020-7373(76)80028-4"},{"key":"e_1_3_2_42_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.jobe.2019.100755"},{"key":"e_1_3_2_43_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.jobe.2021.102186"},{"key":"e_1_3_2_44_1","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-319-51370-6"},{"key":"e_1_3_2_45_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2016.12.003"},{"key":"e_1_3_2_46_1","doi-asserted-by":"publisher","DOI":"10.1002\/9781119572602"},{"key":"e_1_3_2_47_1","doi-asserted-by":"crossref","first-page":"352","DOI":"10.1002\/9781119994374","volume-title":"Fuzzy logic with engineering applications","author":"Ross T. J.","year":"2010","unstructured":"Ross, T. J. 2010. \u201cFuzzy classification (subheading: Fuzzy c-means algorithm).\u201d Chap.\u00a010 in Fuzzy logic with engineering applications. 3rd ed., 352\u2013353. New York: Wiley.","edition":"3"},{"key":"e_1_3_2_48_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.eswa.2011.05.026"},{"key":"e_1_3_2_49_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.conbuildmat.2016.12.079"},{"key":"e_1_3_2_50_1","doi-asserted-by":"publisher","DOI":"10.9790\/3021-03933038"},{"key":"e_1_3_2_51_1","volume-title":"Design integration using autodesk revit 2013","author":"Stine D. J.","year":"2012","unstructured":"Stine, D. J. 2012. Design integration using autodesk revit 2013. Mission, KS: SDC Publications."},{"key":"e_1_3_2_52_1","doi-asserted-by":"publisher","DOI":"10.1108\/02630800910941665"},{"key":"e_1_3_2_53_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2021.103881"},{"key":"e_1_3_2_54_1","doi-asserted-by":"publisher","DOI":"10.5539\/gjhs.v7n6p205"},{"key":"e_1_3_2_55_1","first-page":"721","article-title":"A BIM-enabled approach for construction inspection","volume":"2014","author":"Tsai Y.-H.","year":"2014","unstructured":"Tsai, Y.-H., S.-H. Hsieh, and S.-C. Kang. 2014. \u201cA BIM-enabled approach for construction inspection.\u201d Comput. Civil Build. Eng. 2014 (Jun): 721\u2013728.","journal-title":"Comput. Civil Build. Eng."},{"key":"e_1_3_2_56_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.sbspro.2012.11.198"},{"key":"e_1_3_2_57_1","doi-asserted-by":"publisher","DOI":"10.30684\/etj.37.2A.5"},{"key":"e_1_3_2_58_1","doi-asserted-by":"publisher","DOI":"10.1002\/9781119574316"},{"key":"e_1_3_2_59_1","volume-title":"Managing construction projects","author":"Winch G. M.","year":"2009","unstructured":"Winch, G. M. 2009. Managing construction projects. New York: Wiley."},{"key":"e_1_3_2_60_1","doi-asserted-by":"crossref","unstructured":"Yacob S. A. S. Ali and A.-Y. C. Peng. 2016. \u201cBuilding condition assessment: Lesson learnt from pilot projects.\u201d In Proc. MATEC Web of Conf. Paris: EDP Sciences.","DOI":"10.1051\/matecconf\/20166600072"},{"key":"e_1_3_2_61_1","doi-asserted-by":"crossref","unstructured":"Yalcinkaya M. and V. Singh. 2014. \u201cBuilding information modeling (BIM) for facilities management\u2014Literature review and future needs.\u201d In Proc. Product Lifecycle Management for a Global Market: 11th IFIP WG 5.1 Int. Conf. PLM 2014. New York: Springer.","DOI":"10.1007\/978-3-662-45937-9_1"},{"key":"e_1_3_2_62_1","doi-asserted-by":"publisher","DOI":"10.1016\/0165-0114(78)90029-5"},{"key":"e_1_3_2_63_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.applthermaleng.2015.09.121"},{"key":"e_1_3_2_64_1","doi-asserted-by":"publisher","DOI":"10.1109\/ACCESS.2019.2943454"},{"key":"e_1_3_2_65_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.rse.2019.111458"},{"key":"e_1_3_2_66_1","doi-asserted-by":"publisher","DOI":"10.1109\/TIE.2018.2844856"}],"container-title":["Journal of Computing in Civil Engineering"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/ascelibrary.org\/doi\/pdf\/10.1061\/JCCEE5.CPENG-6254","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,2,27]],"date-time":"2025-02-27T10:09:43Z","timestamp":1740650983000},"score":1,"resource":{"primary":{"URL":"https:\/\/ascelibrary.org\/doi\/10.1061\/JCCEE5.CPENG-6254"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2025,5]]},"references-count":65,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2025,5]]}},"alternative-id":["10.1061\/JCCEE5.CPENG-6254"],"URL":"https:\/\/doi.org\/10.1061\/jccee5.cpeng-6254","relation":{},"ISSN":["0887-3801","1943-5487"],"issn-type":[{"value":"0887-3801","type":"print"},{"value":"1943-5487","type":"electronic"}],"subject":[],"published":{"date-parts":[[2025,5]]},"assertion":[{"value":"2024-06-21","order":0,"name":"received","label":"Received","group":{"name":"publication_history","label":"Publication History"}},{"value":"2024-10-15","order":2,"name":"accepted","label":"Accepted","group":{"name":"publication_history","label":"Publication History"}},{"value":"2025-02-27","order":3,"name":"published","label":"Published","group":{"name":"publication_history","label":"Publication History"}}],"article-number":"04025029"}}