{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,11,7]],"date-time":"2025-11-07T08:52:12Z","timestamp":1762505532493},"reference-count":26,"publisher":"American Society of Civil Engineers (ASCE)","issue":"4","content-domain":{"domain":["ascelibrary.org"],"crossmark-restriction":true},"short-container-title":["J. Perform. Constr. Facil."],"published-print":{"date-parts":[[2010,8]]},"DOI":"10.1061\/(asce)cf.1943-5509.0000104","type":"journal-article","created":{"date-parts":[[2009,11,21]],"date-time":"2009-11-21T23:00:46Z","timestamp":1258844446000},"page":"337-344","update-policy":"http:\/\/dx.doi.org\/10.1061\/do.news.20190416.0001","source":"Crossref","is-referenced-by-count":56,"title":["Discussion of Criteria for Prioritization of Predictive Maintenance of Building Fa\u00e7ades: Survey of 30 Experts"],"prefix":"10.1061","volume":"24","author":[{"given":"I.","family":"Flores-Colen","sequence":"first","affiliation":[{"name":"Assistant Professor, Dept. of Civil Engineering and Architecture (DECivil)-IST, Section of Construction, Technical Univ. of Lisbon, Av. Rovisco Pais, 1049-001 Lisbon, Portugal."},{"name":"Full Professor, DECivil\u2013IST, Section of Construction, Technical Univ. of Lisbon, Av. Rovisco Pais, 1049-001 Lisbon, Portugal (corresponding author)."},{"name":"Full Professor, Dept. of Civil Engineering (DEC)-FEUP, Section of Civil Constructions, Univ. of Porto, R. Dr. Roberto Frias, 4200-465 Porto, Portugal."}]},{"given":"J.","family":"de Brito","sequence":"additional","affiliation":[{"name":"Assistant Professor, Dept. of Civil Engineering and Architecture (DECivil)-IST, Section of Construction, Technical Univ. of Lisbon, Av. Rovisco Pais, 1049-001 Lisbon, Portugal."},{"name":"Full Professor, DECivil\u2013IST, Section of Construction, Technical Univ. of Lisbon, Av. Rovisco Pais, 1049-001 Lisbon, Portugal (corresponding author)."},{"name":"Full Professor, Dept. of Civil Engineering (DEC)-FEUP, Section of Civil Constructions, Univ. of Porto, R. Dr. Roberto Frias, 4200-465 Porto, Portugal."}]},{"given":"V.","family":"Freitas","sequence":"additional","affiliation":[{"name":"Assistant Professor, Dept. of Civil Engineering and Architecture (DECivil)-IST, Section of Construction, Technical Univ. of Lisbon, Av. Rovisco Pais, 1049-001 Lisbon, Portugal."},{"name":"Full Professor, DECivil\u2013IST, Section of Construction, Technical Univ. of Lisbon, Av. Rovisco Pais, 1049-001 Lisbon, Portugal (corresponding author)."},{"name":"Full Professor, Dept. of Civil Engineering (DEC)-FEUP, Section of Civil Constructions, Univ. of Porto, R. Dr. Roberto Frias, 4200-465 Porto, Portugal."}]}],"member":"30","reference":[{"key":"e_1_3_2_2_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2003.12.004"},{"key":"e_1_3_2_3_1","volume-title":"Facilities economics: Incorporating premises audits","author":"Bernard Williams Associates","year":"1994"},{"key":"e_1_3_2_4_1","unstructured":"British Standards Institute (BSI). (2003). \u201cGuide to durability of buildings and building elements products and components.\u201d BS 7543 London."},{"key":"e_1_3_2_5_1","volume-title":"Organization and management of management\u2013from the concepts to practice","author":"Cabral J.","year":"1998"},{"key":"e_1_3_2_6_1","unstructured":"Campante E. Sabbatini F. and Paschoal J. (2001). \u201cProcedures for maintenance and repair of fa\u00e7ades ceramic claddings.\u201d Proc. Construction 2001\u2014For a Sustainable Construction IST Lisbon Portugal 577\u2013584 (in Portuguese)."},{"key":"e_1_3_2_7_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2004)130:4(525)"},{"key":"e_1_3_2_8_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)1076-0431(2004)10:3(80)"},{"key":"e_1_3_2_9_1","unstructured":"Committee European for Standardization (CEN). (2005). \u201cDesign preparation and application of external rendering and internal plastering\u2013External rendering.\u201d EN 13914-1 Brussels Belgium."},{"key":"e_1_3_2_10_1","unstructured":"Flores-Colen I. (2003). \u201cPlans of proactive maintenance in recent buildings.\u201d Proc. 3rd ENCORE\u2014Conf. on Conservation and Rehabilitation of Buildings LNEC Lisbon Portugal 1027\u20131036 (in Portugese)."},{"key":"e_1_3_2_11_1","unstructured":"Flores-Colen I. (2009). \u201cMethodology of evaluation of the in-service performance of rendered fa\u00e7ades from the predictive maintenance perspective.\u201d Ph.D. thesis in Civil Engineering IST Lisbon Portugal (in Portugese)."},{"key":"e_1_3_2_12_1","unstructured":"Flores-Colen I. and de Brito J. (2006). \u201cPlan of inspection and maintenance of a school building\u2014A case study.\u201d Proc. QIC 2006 National Meeting on Quality and Innovation in Construction LNEC Lisbon Portugal 569\u2013580 (in Portugese)."},{"key":"e_1_3_2_13_1","volume-title":"Proc., Construction 2007","author":"Flores-Colen I.","year":"2007"},{"key":"e_1_3_2_14_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.conbuildmat.2006.08.023"},{"key":"e_1_3_2_15_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.conbuildmat.2005.01.014"},{"key":"e_1_3_2_16_1","unstructured":"Hertlein B. (1999). \u201cPredictive maintenance\u2014What should be in a condition database.\u201d Proc. 8DBMC\u20148th Int. Conf. on Durability of Building Materials and Components NRC-CNRC Ottawa 1203\u20131212."},{"key":"e_1_3_2_17_1","unstructured":"ISO. (2000). \u201cBuildings and constructed assets\u2014Service life planning\u2013Part 1: General principles.\u201d ISO 15686-1 Geneva."},{"key":"e_1_3_2_18_1","unstructured":"ISO. (2002). \u201cBuildings and constructed assets\u2014Service life planning\u2013Part 3: Performance audits and reviews.\u201d ISO 15686-3 Geneva."},{"key":"e_1_3_2_19_1","unstructured":"Johnson M. and Wyatt D. (1999). \u201cPreparation and prioritization of maintenance programs.\u201d Proc. 8DBMC\u20148th Int. Conf. on Durability of Building Materials and Components NRC-CNRC Ottawa 1615\u20131624."},{"key":"e_1_3_2_20_1","doi-asserted-by":"publisher","DOI":"10.1080\/096132198369689"},{"key":"e_1_3_2_21_1","doi-asserted-by":"publisher","DOI":"10.1057\/palgrave.jba.2940049"},{"key":"e_1_3_2_22_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2004.08.014"},{"key":"e_1_3_2_23_1","volume-title":"Maintenance planning and scheduling handbook","author":"Palmer D.","year":"1999"},{"key":"e_1_3_2_24_1","volume-title":"Assessing building performance","author":"Preiser W. F. E.","year":"2005"},{"key":"e_1_3_2_25_1","unstructured":"Rodrigues R. C.  (2001). \u201cManagement of buildings. Model of simulation technical\u2013economic.\u201d Ph.D. thesis in Civil Engineering FEUP Porto Portugal (in Portuguese)."},{"key":"e_1_3_2_26_1","doi-asserted-by":"publisher","DOI":"10.1108\/14725960310808079"},{"key":"e_1_3_2_27_1","first-page":"4","volume-title":"Multi-criteria decision-making MCDM-23, a method for specifying and prioritising criteria and goals in design","author":"Tanimoto J.","year":"2001"}],"container-title":["Journal of Performance of Constructed Facilities"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/ascelibrary.org\/doi\/pdf\/10.1061\/%28ASCE%29CF.1943-5509.0000104","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,6,9]],"date-time":"2022-06-09T20:15:11Z","timestamp":1654805711000},"score":1,"resource":{"primary":{"URL":"https:\/\/ascelibrary.org\/doi\/10.1061\/%28ASCE%29CF.1943-5509.0000104"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2010,8]]},"references-count":26,"journal-issue":{"issue":"4","published-print":{"date-parts":[[2010,8]]}},"alternative-id":["10.1061\/(ASCE)CF.1943-5509.0000104"],"URL":"https:\/\/doi.org\/10.1061\/(asce)cf.1943-5509.0000104","relation":{},"ISSN":["0887-3828","1943-5509"],"issn-type":[{"value":"0887-3828","type":"print"},{"value":"1943-5509","type":"electronic"}],"subject":[],"published":{"date-parts":[[2010,8]]},"assertion":[{"value":"2009-06-09","order":0,"name":"received","label":"Received","group":{"name":"publication_history","label":"Publication History"}},{"value":"2009-10-05","order":1,"name":"accepted","label":"Accepted","group":{"name":"publication_history","label":"Publication History"}},{"value":"2009-11-21","order":2,"name":"published","label":"Published","group":{"name":"publication_history","label":"Publication History"}}]}}